Method for determining economic drill bit utilization
AssigneeAutomated Decisions, Inc.
InventorsRichard L. Gray, Vivien J. Cambridge
Life of this patent
Estimating the term…
Abstract
Disclosed is a real-time method for determining when a drill bit that is being used in drilling operations should be replaced, given the objective of minimizing the total expected, controllable costs of a well. The basis of the bit replacement decision is a direct comparison of the total expected, controllable unit cost of the current bit in the borehole to the total expected, controllable unit cost of a replacement bit over a specified interval of analysis.
Claims11
A real-time method for controlling a drilling process to achieve an optimum economic utilization of a drill bit in a borehole on a realtime basis for a drilling operation in progress by determining when the drill bit is to be replaced comprising the steps of:
- (a) acquiring values of a plurality of real-time drilling operating variables and an actual penetration rate for the drill bit from sensors;
- (b) storing the plurality of acquired values of realtime drilling operating variables and the actual penetration rate;
- (c) calculating at predetermined intervals, a plurality of values of real-time parameters of a real-time, multivariate, predictive, penetration rate model having real-time operating variables associated with the drilling process, each parameter associated with one of the real-time drilling operating variables of the model wherein the parameters measure the sensitivity of the penetration rate of the drill bit in the borehole to each of the operating variables of the model;
- (d) calculating at predetermined intervals, real-time expressions of the penetration rate of the drill bit in the borehole using the real-time operating variables in the model and the calculated values of the real-time parameters;
- (e) calculating a total, expected controllable unit cost over a future drilling interval of depth for the drill bit currently in the borehole using a predictive penetration rate expression;
- (f) calculating a total, expected controllable unit cost over said future drilling interval of depth for a replacement bit by utilizing a predictive penetration rate expression containing values of variables, parameters, and coefficients corresponding to the replacement bit;
- (g) comparing the total, expected controllable unit cost of the drill bit currently in the borehole and the total, expected controllable unit cost of the replacement drill bit over said future drilling interval of depth and identifying the drill bit that is expected to generate lower cost over the future drilling interval of depth;
- and
- (h) replacing the drill bit in the borehole when the unit cost calculated in step (e) exceeds the unit cost calculated in step (f) at the future drilling interval depth.
Dependencies are inferred from the claim text.