Method and apparatus for forming reinforced concrete walls with continuous steel reinforcement
AssigneeFinic, B.V.
InventorArturo L. Ressi di Cervia
Life of this patent
Estimating the term…
Loading patent…
AssigneeFinic, B.V.
InventorArturo L. Ressi di Cervia
Estimating the term…
Improvement on the method and apparatus for forming reinforced concrete walls with continuous steel reinforcements is disclosed in Veder U.S. Pat. No. 3,310,952. The process includes the forming of a plurality of concrete panels, each panel having a reinforcing cage extending to proximate the joint between the concrete panels and one or more expansible joint reinforcing cages bridging the gap between the reinforcing cages in the adjoining panels. The expansible joint reinforcing cages are carried in carriers in an end stop pipe. Each expansible joint reinforcing cage is comprised of a vertical support bar having secured thereto a plurality of horizontally extending concrete anchor members rigidly secured to one surface of the vertical support bar. A plurality of reinforcing bar members are pivotally coupled to the vertical support bar member and an operating rod member or channel member is coupled to the opposite ends of the these reinforcing bar members and shifts them from a substantially vertical position to a substantially horizontal position after the stop pipe has been removed and the next succeeding panel excavation performed. The vertical orientation of these reinforcing bar members as well as their operating member assures that they will be removed from the area of excavation of the next succeeding and adjacent panel section and, at the same time, by virtue of the concrete anchor members they are rigidly and securely anchored in the preceding concrete panel element. In a preferred embodiment, the vertical bar member is a channel member and the operating rod member is a similar channel member.
In a slurry trench method of constructing an underground concrete wall in a plurality of panel sections with continuous steel reinforcement, wherein a first panel section is excavated, an end stop pipe is placed in an end of said first panel section after excavation thereof, said end stop molding pipe has at least one concrete forming surface extending to the full length thereof, the improvement comprising,
In a slurry trench method of constructing an underground concrete wall in a plurality of panel sections with continuous steel reinforcement, wherein a first panel section is excavated, an end stop pipe is placed in an end of said first panel section after excavation thereof, said end stop molding pipe has at least one concrete forming surface extending to the full length thereof, the improvement comprising,
A joint reinforcing apparatus for an underground reinforced concrete wall, comprising,
In a steel reinforced concrete wall comprised of a plurality of concrete panels, each panel having a reinforcing cage extending to proximate the joint between concrete panels and a joint reinforcing cage bridging the gap between said reinforcing cages in adjoining panels, the improvement in said joint reinforcing cage comprising,
In a removable hollow stop end pipe for use in the slurry trench construction of a reinforced concrete wall, the improvement comprising,
Dependencies are inferred from the claim text.