Method of rehabilitating a waterfront bulkhead
AssigneeSchnabel Foundation Company
InventorsErnest D. Brandl, Robert C. Houghton
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchnabel Foundation Company
InventorsErnest D. Brandl, Robert C. Houghton
Estimating the term…
A method for rehabilitating an existing bulkhead located between a body of water and land is disclosed. The method includes the steps of installing a plurality of tiebacks attached directly to the existing bulkhead, and a new bulkhead facing is connected to the existing bulkhead which has been supported by the tiebacks. An alternate method includes the steps of installing a plurality of substantially vertical piles at horizontally spaced locations in front of, i.e. on the water side of, the existing bulkhead; connecting the vertical piles to the existing bulkhead; installing tiebacks through the existing bulkhead and into the land behind the existing bulkheads; and connecting the tiebacks to the vertical piles. In situations where use of piles and tiebacks alone are not sufficient to rehabilitate the bulkhead, a new bulkhead facing is installed in front of the existing bulkhead and connected to and supported by the piles and tieback supported existing bulkhead.
A method of rehabilitating an existing bulkhead located between a body of water and land comprising the steps of:
Dependencies are inferred from the claim text.