Discharge of top gases from blast furnaces or the like
AssigneeMannesmann Aktiengesellschaft
InventorsHeinz Peterseim, Walter Leutz
Life of this patent
Estimating the term…
Abstract
During the charging of a blast furnace with a new raw material, gas with a high dust content enters and pressurizes the storage bin. This pressurized gas is fed to one end of a temporary storage chamber in the form of an elongated tube having a discharge opening with a noise attenuator at the other end. When the storage tube is filled, it is connected to a low pressure suction device for removing the dust laden gas from the storage tube. The equipment is described with twin bins and alternating discharge therefrom using the same temporary storage tube.
Claims11
Method of reducing the pressure of top gases discharged from a blast furnace or the like into a storage bin during discharge of the content of the bin into the blast furnace, comprising the steps of:
- feeding in a first phase dust laden top gas at elevated pressure into a chamber filled with clean air at ambient temperature and pressure under utilization of the formation of a pressure wave;
- concurrently discharging said air by operation of said pressure wave through a sound attenuation device into the outer atmosphere;
- feeding in a second phase the top gas from said chamber under dilution with clean air into a low pressure stage under concurrent separation from the storage bin from which the top gas was discharged in said first phase;
- and
- de-dusting the diluted top gas as discharged from said low pressure stage.
Apparatus for handling top gas developed in a feed bin, having suitable lock means, and being intermittently connected to a blast furnace for purposes of providing a new charge to said blast furnace whereby top gas reaches and flows into said bin comprising:
- first valve controlled conduit means permitting discharge of top gas from said bin;
- a storage tube connected to said first conduit and having a volume sufficient to receive all of the top gas that flows from the bin through said first conduit means, said first conduit means being connected to said storage tube near one end thereof;
- a sound and noise attenuator provided at the other end of said storage tube being otherwise open to the outer atmosphere;
- and
- a suction device including a separate valve device connected to said storage tube at said one end thereof, for sucking top gas out of the storage tube after the storage tube has filled with top gas and the previous air content thereof has been discharged through said sound attentuating device.
Dependencies are inferred from the claim text.