Coal is reduced to ash in place by gasification using in situ production techniques, resulting in significant void space underground, which in turn causes roof fall and subsidence. Overburden collapse is stabilized by backfilling with foaming mud cement that hardens into an expanded solid, which quenches and fills the production module and seals residual ash. Rubble volumes and subsidence cracks are sealed against water incursions and contaminated water excursions. Surface facilities above barrier pillars are protected from destructive forces of subsidence draw.
Claims3
A method of establishing a production well to withstand stresses induced by consumption of coal in situ, comprising the steps of
- drilling a bore hole from the surface of the earth through the overburden and substantially through the coal seam,
- installing conductor casing within the bore hole to a point adjacent to the interface of the overburden and the coal seam,
- installing bonding apparatus to a bobtail string of casing, the bonding apparatus containing a multiplicity of rotatable projecting fingers capable both of retracting to positions substantially parallel to the bobtail string of casing and of extending to positions substantially perpendicular to the bobtail string of casing, the bobtail string being of sufficient length to reach the bottom of the bore hole and overlap into the conductor casing,
- lowering the bobtailed string of casing within the conductor casing to the bottom of the bore hole, then
- cementing the conductor casing and the bobtail string of casing into place, wherein the cement completely fills the annulus between the conductor casing and the bore hole, wherein the cement completely fills the annulus between the overlapping portion of the conductor casing and the bobtail string of casing and the cement engulfs the retracted projecting fingers located within the said overlapping portion, and wherein the cement completely fills the annulus between the bobtail string of casing and the bore hole and the cement engulf the extended projecting fingers located below the conductor casing.