Injection molding of thermoplastics in sandwich mold employing desynchronized opening, extended and closing periods
AssigneeUniversal Commerce and Finance N.V.
InventorJens O. Sorensen
Life of this patent
Estimating the term…
Abstract
A method of injection molding a thermoplastic material to produce a product in a sandwich mold comprising at least two ejection ports each having a cooling cavity, and a single runner system for feeding the two cooling cavities, where each ejection port passes through a retracted period and a protracted period which together make up its production cycle, where the retracted period comprises an injection period and a cooling period and where the protracted period comprises an opening period, an extended period or point in time, and a closing period, the method comprising the step of desynchronizing the opening, extended and closing periods of a first ejection port with the respective opening extended and closing periods of a second ejection port.
Claims11
A method of injection molding a thermoplastic material to produce a product in a sandwich mold comprising at least two ejection ports, each having a cooling cavity and a single runner system for feeding the two cooling cavities, wherein each ejection port passes through a retracted period and a protracted period which together make up its production cycle, wherein the retracted period comprises an injection period and a coolng period, wherein the protracted period comprises an opening period, an extended period or point in time, and a closing period, wherein the retracted periods for the two ejection ports overlap, and wherein the injection periods for both of the two ejection ports occur during each overlapping period, the method being characterized by the step of:
- (a) desynchronizing the opening, extended and closing periods of a first ejection port with the respective opening, extended and closing periods of a second ejection port.
A method of injection molding a thermoplastic material to produce a product in a sandwich mold that includes at least two ejection ports, each having a cooling cavity, and a single runner system for feeding the two cooling cavities, wherein each ejection port passes through a retracted period and a protracted period which together make up its production cycle, wherein the retracted period includes an injection period and a cooling period, and wherein the protracted period includes an opening period, an extended period or point in time, and a closing period, the method being characterized by the steps of:
- (a) desynchronizing the opening, extended and closing periods of a first ejection port with the respective opening, extended and closing periods of a second ejection port;
- (b) beginning the injection period of the first ejection port subsequent to ending the protracted period of the first ejection port;
- (c) ending the injection period of the first ejection port prior to beginning the protracted period of the second ejection port;
- (d) beginning the injection period of the second ejection port subsequent to ending the protracted period of the second ejection port;
- and
- (e) ending the injection period of the second ejection port prior to beginning the protracted period of the first ejection port for the following cycle.
Dependencies are inferred from the claim text.