Track skeletonizer
AssigneeRailway Track-Work Company
InventorsAllan D. Jenkins, John T. Appelen, Nils Lind
Life of this patent
Estimating the term…
Loading patent…
AssigneeRailway Track-Work Company
InventorsAllan D. Jenkins, John T. Appelen, Nils Lind
Estimating the term…
An apparatus (10) for performing work on a railway roadbed is disclosed. The apparatus includes a mobile support framework (16), a front truck (18) and a rear truck (20). Leg assemblies (22, 24) connect each truck to the framework (16). Rail hooks (46, 48) selectively connect the framework (16) with rails (14). Outriggers (42, 44) raise the framework and a section of rail connected to the framework by the hooks with respect to the ground. A roadbed working tool (34) can be suspended below the framework by a hook mechanism (36). A powered handling boom mechanism (38) is supported on the framework for moving the tool with respect to the framework after the tool has been released from the framework by the hooks. An adjusting mechanism (52) moves each of the trucks (18, 20) laterally with respect to the lengthwise dimension of the framework (16).
Apparatus for performing work on a railway roadbed comprising:
Apparatus for performing work on a railway roadbed with a roadbed working tool, such as a plow or sled, comprising:
Apparatus for performing work on a railway roadbed with a roadbed working tool, such as a plow or sled, comprising:
Apparatus for performing work on a railway roadbed with a roadbed working tool, such as a plow or sled, comprising:
Apparatus for performing work on a railway roadbed with a roadbed working tool, such as a plow or sled, comprising:
Apparatus for performing work on a railway roadbed with a roadbed working tool, such as a plow or sled, comprising:
Apparatus for performing work on a railway roadbed, comprising:
A tool for working ballast material below a lifted section of railway track, said tool comprising:
A tool for moving ballast material below a lifted section of railway track, said tool comprising:
A tool for moving ballast material beneath a lifted section of railway track, said tool comprising:
A track skeletonizer, comprising:
A track skeletonizer, comprising:
Dependencies are inferred from the claim text.