Method for producing a continuous wall
OwnerHiroichi Satoinventor
Life of this patent
Estimating the term…
Loading patent…
OwnerHiroichi Satoinventor
Estimating the term…
A method for producing a continuous wall is disclosed which comprises the steps of digging at least two holes in the ground, inserting into each of the holes a supporting means, supporting a continuous wall producing apparatus by the supporting means such that the continuous wall producing apparatus can be moved up and down along the supporting means serving as a guide, supplying highly pressurized water, the supporting means and pressurized air to the continuous wall producing apparatus, lowering the continuous wall producing apparatus, while forming a pressurized air zone in the ground and jetting highly pressurized water to dig the ground in a plate like form, and elevating the continuous wall producing apparatus while pouring a grout material into the dug out space thus formed. An apparatus for producing a continuous wall in the ground which comprises a pair of special reducers, a connecting member or members, a first discharge orifice provided with the special reducer for effecting downward discharging, a second discharge orifice provided with said special reducer for effecting discharging along the length of the connecting member, and an air blow pipe provided with a multiplicity of small orifices, arranged above the connecting member or members is provided.
A procedure for forming a hardened underground vertical wall which comprises progressively lowering into the ground a framework having a first set of spaced orifices directed generally horizontally and a second set of spaced orifices directed vertically downward, said first and second set of orifices arranged substantially in a common plane, applying to the orifices a source of highly pressurized water to create earth-eroding jets to form a progressively deeper groove in the earth as the framework is lowered, releasing high pressure air in the region above the jets so that the resulting mixture of water and earth is forced by the action of bubbles upwardly and out of the groove, disconnecting the sources of water and air after the groove has reached the desired depth, forcing liquid grout through the orifices as the framework is progressively raised until the groove is substantially filled and the framework is completely withdrawn, and allowing the grout to harden in place.
A procedure for forming a hardened underground vertical wall which comprises progressively lowering into the ground a framework having a first set of spaced orifices directed generally horizontally and a second set of spaced orifices directed vertically downward, said first and second set of orifices arranged substantially in a common plane, applying to the orifices a source of highly pressurized water to create earth-eroding jets to form a progressively deeper groove in the earth as the framework is lowered, releasing high pressure air in the region above the jets so that the resulting mixture of water and earth is forced by the action of bubbles upwardly and out of the groove, and after the groove has reached the desired depth, progressively raising the framework while pouring a grout material into the groove until the groove is substantially filled and the framework is completely withdrawn, and allowing the grout to harden in place.
Dependencies are inferred from the claim text.