Reduction of water production from hydrocarbon containing subsurface formations
AssigneeThe Dow Chemical Company
InventorsDustin L. Free, Howard M. Phillips
Life of this patent
Estimating the term…
Abstract
To reduce the production of water from a subsurface hydrocarbon-bearing interval of a formation the producing interval of the formation is treated with an aqueous solution or sol of a high molecular weight, water soluble polyacrylamide (PAM). The polymer which is absorbed in the formation is crosslinked in situ, e.g. by subsequently flushing the formation with a crosslinking solution.
Claims16
In the method of treating a subsurface oil and water-producing interval of a formation located adjacent to a well bore to decrease the volume ratio of water to oil produced therefrom wherein an aqueous solution of a partially hydrolyzed polyacrylamide, said solution being substantially free of a crosslinking agent for said polyacrylamide, is injected into the producing formation and then producing fluids from said formation, the improvement which comprises:
- acidizing the interval to be treated prior to the injection of polymer solution to increase the injectivity of the interval;
- crosslinking the polymer after it is introduced into the formation and prior to producing fluids from the treated formation by contacting said polymer with an aqueous solution containing a water soluble salt of a di or trivalent metal cation or an organic crosslinking agent so that said polymer is crosslinked to a degree sufficient to achieve a greater reduction in the volume ratio of water to oil produced than is obtained with injection of only said substantially uncrosslinked polyacrylamide.
In the method of treating a producing interval of a subsurface formation producing both a fluid hydrocarbon and water wherein an aqueous solution of polyacrylamide is injected into the producing interval through a well bore, the improvement which comprises:
- (a) selectively acidizing the producing interval to increase the injectivity thereof;
- (b) injecting into the producing interval from the borehole an aqueous solution of partially hydrolyzed polyacrylamide;
- (c) flushing well bore to remove any polyacrylamide solution therefrom;
- (d) injecting into the producing interval treated with the solution of polyacrylamide an aqueous solution of a crosslinking agent;
- (e) shutting the producing interval in for a period of time sufficient to crosslink the polymer;
- and
- (f) returning the well to production.
In the method of treating a subsurface oil and a water-producing interval of a formation located adjacent to a well bore to decrease the volume ratio of water to oil produced therefrom, wherein an aqueous solution of a partially hydrolyzed polyacrylamide, said solution being substantially free of a crosslinking agent for said polyacrylamide, is injected into the producing formation and then producing fluids from said formation, the improvement which comprises:
- (a) acidizing the interval to be treated prior to the injection of polymer solution to increase the injectivity of the interval;
- (b) providing from about 0.01 to about 0.75 percent by weight of polyacrylamide in said aqueous solution wherein said polyacrylamide has a molecular weight of at least about 500,000 and from about 0.1 to about 70 percent of the amide groups are hydrolyzed to carboxylate groups, and (c) crosslinking the polyacrylamide after it is introduced into the formation and prior to producing fluids from the treated formation by contacting the polyacrylamide with an aqueous solution of aluminum sulfate so that said polymer is crosslinked to a degree sufficient to achieve a greater reduction in the volume ratio of water to oil produced than is obtained with injection of only said substantially uncrosslinked polyacrylamide.
Dependencies are inferred from the claim text.