Process and apparatus for manufacturing single piece railroad ties of prestressed concrete
AssigneeVianini, S.p.A.
InventorsSergio Marchesi, Gino Fachin
Life of this patent
Estimating the term…
Loading patent…
AssigneeVianini, S.p.A.
InventorsSergio Marchesi, Gino Fachin
Estimating the term…
A process and apparatus are disclosed for production casting of railroad ties and the like to obtain maximum mold utility. The casting is accomplished by arranging tendons within a mold and subjecting them to an appropriate tensile stress. Uncured concrete is then introduced at a temperature of around 80.degree. C.-90.degree. C. The mold is vibrated and subsequently closed. It is then maintained at 60.degree. C.-80.degree. C. for a time sufficient to cure the concrete such that the prestressing mechanism can be released. The mold may then be immediately re-used. One mechanism by which the molds may be closed during the curing process in most efficient manner is to employ succeeding molds in a stacked arrangement to cover each preceding mold cavity. A single piece conical locking member is also employed to anchor the tendon in the mold.
A process for manufacturing prestressed concrete items, including the steps of pretensioning tendons in a mold, pouring concrete into the mold, placing the mold with concrete therein in a controlled environment having a temperature of between about 60.degree. C. to 80.degree. C. until the concrete is sufficiently cured to support the pretensioned load in the tendons, releasing the tendons from the mold and removing the cast concrete from the mold wherein the improvement comprises heating the concrete prior to said step of pouring the concrete into the mold, sealing the mold substantially immediately after the step of pouring the concrete into the mold and heating the mold substantially immediately after the step of pouring the concrete into the mold.
A process for manufacturing prestressed concrete items, comprising the steps of pretensioning tendons in a mold, heating concrete to a temperature of between about 80.degree. C. to 90.degree. C., pouring the heating concrete into the mold, substantially immediately sealing the mold after pouring the concrete into the mold, placing the mold with concrete therein substantially immediately after pouring the concrete into the mold in a controlled environment having a temperature of around about 60.degree. C. to 80.degree. C. until the concrete is sufficiently cured to hold the pretensioning in the tendons, releasing the tendons from the mold and removing the cast concrete from the mold.