Systems and method for organizing computer programs for operating a steam turbine with digital computer control
AssigneeWestinghouse Electric Corp.
InventorsRobert Uram, Juan J. Tanco
Life of this patent
Estimating the term…
Abstract
Steam flow and pressure conditions needed in a turbine to satisfy the speed and load demand of an electric power generating system are controlled by a programmed digital computer system during start-up, synchronization and operation. Manual backup control is provided for the computer control. An operator interface is provided with the computer through a panel and various communication devices.
Claims43
An electric power generating system having a steam turbine, a steam generator, and an electric generator rotated by said turbine and adapted to be connected to an electric load, said system comprising:
- a. means for digitally computing and processing, having a central processing unit and a memory interconnected with said central processing unit;
- b. means for converting input signals to digital data, said input converting means connected to said digital computing means;
- c. means for converting digital data to output signals, said digital to output converting means connected to said digital computing means;
- d-1. means for sensing the value of predetermined turbine operating parameters and for generating input signals representative of said parameters, said sensing means being connected to said input converting means;
- d-2. means for supplying load demand input signals to said input converting means;
- e. means for controlling the steam flow to said turbine;
- f. means for connecting said output signal converting means to said steam flow control means;
- g. said digital computer means comprising speed control means for automatic startup and synchronization of said generating system, and characterized in that it is programmed to perfrom a plurality of respective functions in accordance with a predetermined priority, said functions including
- (i) computing turbine speed program signals which are a function of at least one of said input signals, and
- (ii) computing turbine speed control signals as a function of said speed program signal, and
- (iii) computing controller signals as a function of said load demand signals, for operation of said controlling means under load mode conditions, and
- (iv) continuously computing, throughout a predetermined startup speed range and during load operation, control signals for operation of said controlling means;
- and
- h. said computed speed control signals and controller signals being converted to output signals by said output converting means for controlling said steam flow control means as a function of said sensed parameters so as to control steam flow as an intermediate variable, and to control turbine speed during startup as an end operating variable and turbine load during load operation as an end operating variable, thereby providing continuous control through startup and load operation.
An electric power generating system comprising:
- a. a steam turbine system;
- b. a steam generator for providing steam to said steam turbine system;
- c. an electric generator rotated by said turbine system, and adapted to be connected to an electric load;
- d. means for digitally computing and processing, having a central processor unit and a memory interconnected with said central processing unit;
- e. means for converting input signals to digital data, said input converting means connected to said digital computing means;
- f. means for converting digital data to output signals, said digital to output converting means connected to said digital computing means;
- g. means for sensing the value of predetermined turbine operating parameters and for generating input signals representative of said parameters, said sensing means being connected to said input converting means;
- h. means for controlling the steam flow to said turbine;
- i. means for connecting said output signal converting means to said steam flow control means;
- j. said digital computer means comprising speed control means for automatic startup and synchronization of said generating system and characterized in that it is programmed to perform a plurality of respective functions in accordance with a predetermined priority, said functions including
- (i) computing turbine speed program signals which are a function of at least one of said input signals, said speed program signals comprising speed sequencing signals for automatically sequencing turbine speed during startup, and including signals for holding turbine speed at a plurality of predetermined speed levels, and
- (ii) computing turbine speed control signals as a function of said speed program signals;
- and
- k. said computed speed control signals being converted to output signals by said output converting means for controlling said steam flow control means as a function of said sensed parameters so as to control steam flow as an intermediate variable, and to control turbine speed during startup as an end operating variable.
An electric power generating system comprising:
- a. a steam turbine system;
- b. a steam generator for providing steam to said steam turbine system;
- c. an electric generator rotated by said turbine system, and adapted to be connected to an electric load;
- d. means for digitally computing and processing, having a central processor unit and a memory interconnected with said central processing unit;
- e. means for converting input signals to digital data, said input converting means connected to said digital computing means;
- f. means for converting digital data to output signals, said digital to output converting means connected to said digital computing means;
- g-1. means for sensing the value of predetermined turbine operating parameters and for generating input signals representative of said parameters, said sensing means being connected to said input converting means;
- g-2. means for supplying load demand input signals to said input converting means;
- h. means for controlling the steam flow to said turbine;
- i. means for connecting said output signal converting means to said steam flow control means;
- j. said digital computer means further having speed control means for automatic startup and synchronization of said generating system, said speed control means including
- (i) means for carrying out a plurality of respective computing functions in accordance with a programmed priority;
- (ii) means for computing turbine speed program signals which are a function of at least one of said input signals,
- (iii) means for computing turbine speed control signals as a function of said speed program signals;
- (iv) means for computing controller signals as a function of said load demand signals, for operation of said controlling means when said steam turbine system is providing load;
- and
- k. said computed speed control signals being converted to output signals by said output converting means for controlling said steam flow control means as a function of said sensed parameters so as to control steam flow as an intermediate variable, and to control turbine speed during startup as an end operating variable.
In an electric power generating system having a steam turbine with means for controlling steam flow therethrough, a steam generator, and an electric generator rotated by said turbine for delivering load to a power system, a method of startup and synchronization of said power generating system comprising:
- a. sensing the values of predetermined turbine operating parameters, and generating input signals representative of said parameters;
- b. converting said input signals to digital data and inputting said digital data to a digital computer having a central processing unit and a memory interconnected with said central processing unit;
- c. computing in said digital computer turbine speed program signals which are a function of at least one of said input signals;
- d. computing in said digital computer turbine speed control signals as a function of at least one of said input signals and of said speed program signals, said speed control computing step including computing speed sequencing signals for automatically sequencing turbine speed during startup, and computing signals for holding turbine speed at a plurality of predetermined speed levels;
- e. performing in said digital computer a plurality of respective computing and processing functions in accordance with a predetermined priority, said functions including computing load control signals for controlling turbine load, said speed program computing, and said speed control computing;
- f. converting said control signals to output signals adapted to operate said turbine steam flow control means;
- and
- g. controlling the operation of said turbine by using said control signals to operate said turbine steam flow control means during turbine startup, including holding turbine speed at said predetermined speed levels.
In an electric power generating system having a steam turbine with means for controlling steam flow therethrough, a steam generator, and an electric generator rotated by said turbine for delivering load to a power system, a method of operating said power generating system comprising:
- a. sensing the magnitude of predetermined turbine operating parameters, and generating input signals representative of said parameters;
- b. converting said input signals to digital data and inputting said digital data to a digital computer having a central processing unit and a memory interconnected with said central processing unit;
- c. sensing predetermined turbine conditions and generating condition signals representative of said conditions, and connecting said condition signals to said digital computer;
- d. monitoring, with said digital computer, said condition signals and producing alarm signals for energizing alarm means when predetermined alarm conditions are monitored;
- e. computing, in said digital computer, turbine speed program signals which are a function of at least one of said input signals;
- f. generating in said digital computer turbine startup and synchronization speed control signals as a function of said speed program signals;
- g. synchronizing in said digital computer the performing of said monitoring, said speed program computing, and said speed control computing;
- h. converting said control signals to output signals adapted to operate said turbine steam flow control means;
- and
- i. controlling the operation of said turbine by using said control signals to operate said turbine steam flow control means during startup.
In an electric power generating system having a steam turbine, a steam generator, and an electric generator rotated by said turbine to supply an electric load, a control system comprising:
- a. means for sensing the values of predetermined turbine operating parameters;
- b. means for developing speed control signals for startup and synchronization of said turbine, said means for developing including
- (i) means for producing turbine speed program signals which are a function of at least one of said parameters, and
- (ii) means for generating said speed control signals in response to said speed program signals;
- c. means for regulating the flow of steam from said steam generator to said turbine;
- d. means for providing inputs representative of desired turbine load when said system is supplying said electric load;
- e. means for developing load control signals as a function of said load inputs;
- and
- f. means, responsive to said speed control signals and said load control signals, for continuously operating said means for regulating, whereby steam flow is controlled as an intermediate variable, and turbine speed is controlled as an end variable when said turbine is in startup and turbine load is controlled as an end variable when said turbine is delivering load.
Dependencies are inferred from the claim text.