A programmable energy load controller system, allowing each of a multiplicity of energy loads to be established in a selected one of an unenergized condition and a plurality of energized conditions, utilizes a central microcomputer facility in communication with a selected one of a plurality of remotely located load control processors, each configured with a unique address and capable of selectively energizing a plurality of energy loads coupled thereto under control of the central facility. The central facility includes at least one user input device, allowing a plurality of maps of load conditions, established in accordance with a user-selectable criteria, such as time-of-day and day-of-week requirements, to be loaded into a data storage associated with the central computer. A real time clock means are utilized in association with the computer and the memory to enable the desired map of load energization under the selected criteria, with means being provided for entering, on a high priority basis, overrides to at least a selected portion of the map currently implemented. Programmable energy load control methods are also disclosed.
A system for programmably controlling the energy utilization condition of a multiplicity of loads, comprising:
A method for controlling the energy utilization condition of a multiplicity of loads, comprising the steps of:
A method for controlling the energy utilization condition of each of a multiplicity of electric loads within a building, comprising the steps of:
In a system for programmably controlling the energy utilization condition of a multiplicity of electrical loads dispersed within a building of the type wherein a plurality of load control processors, each having a unique address, are each associated with at least one of said loads and are adapted to enable the associated loads individually to a desired one of a plurality of energy utilization conditions, and wherein a central facility is adapted to transmit said unique address and condition data for causing the addressed load control processors to implement the desired energy utilization condition of said loads,
The method of controlling the lighting of a plurality of user areas dispersed in a building to any of several preselected lighting patterns, comprising,
Dependencies are inferred from the claim text.