Method and apparatus for peak-load coverage and stop-gap reserve in steam power plants
AssigneePaul Viktor Gilli
InventorsPaul V. Gilli, Georg Beckmann
Life of this patent
Estimating the term…
Loading patent…
AssigneePaul Viktor Gilli
InventorsPaul V. Gilli, Georg Beckmann
Estimating the term…
An arrangement for storing energy to cover peak-load conditions and serve as a stop-gap reserve in steam power plants. A live steam generator is connected to a steam turbine, and a storage vessel is provided with a steam cushion volume and a water content volume. The water content of the storage vessel is connected, on the one hand, to a single-or multi-stage secondary steam generator which is connected, in turn, on the steam side to the turbine by a working steam line. A hot-water return line connects the secondary steam generator on the water side to the feed water line and/or a compensation vessel connected to the feed water line. The steam cushion volume of the storage vessel is connected, on the other hand, by a steam line, to a point of the main steam cycle of the plant which is upstream of the entry point of the working steam line. In particular, the steam cushion is connected to the live steam line. The secondary steam generator may be in the form of one or several flash tanks or heat exchangers. It also may consist of several superheaters through which hot water flows.
An arrangement for energy storage for peak load coverage and reserve in a steam power plant, comprising:
A method for energy storage for peak load coverage and reserve in a steam power plant, comprising the steps of:
Dependencies are inferred from the claim text.