In situ pile forming method
OwnerFredric Ruscheinventor
Life of this patent
Estimating the term…
Abstract
After wet-drilling a hole until a bearing strata is reached, a mandrel with a removable overboot is lowered into the hole and the overboot is seated by a few hammer blows. The mandrel is than partly filled with thick concrete from its top, the top of the mandrel sealed, air-pressurized and a mechanical lifting force is applied. The pressure of the air within the mandrel plus the weight of the concrete forces off the overboot, and also forces the thick concrete against the sides of the hole, and the concrete forms a seal between the sides of the hole and the mandrel. The air pressure also helps lift the mandrel out of the hole.
Claims4
The method of forming in situ a casingless pile which comprises:
- pre-drilling into the ground a hole,
- inserting into the pre-drilled hole a hollow mandrel having an open top and closure means associated therewith, at least partly filling the mandrel with low slump concrete from the (bottom) bottum up by dumping the concrete from a hopper through the open top thereof, so that the concrete falls entirely by gravity from the hopper into the bottom of the mandrel, then sealing the upper portion of the mandrel by operating said closure means so as to close said open top to the atmosphere then forcing air under pressure into the sealed upper end of the mandrel until the weight of the concrete in the mandrel and the pressure of the air compacts the concrete and forces some of it between the lower end of the mandrel and the side of the hole and forms a seal between the lower end of the mandrel and the side of the hole, and hoisting the mandrel upwardly from the hole.
Dependencies are inferred from the claim text.