Method of backfilling pipeline trenches
AssigneeRader Companies, Inc.
InventorD. Graham Ball
Life of this patent
Estimating the term…
Loading patent…
AssigneeRader Companies, Inc.
InventorD. Graham Ball
Estimating the term…
A trench containing a pipeline is backfilled by temporarily supporting the pipeline at grade in the trench on deflatable airbags spaced along the bottom of the trench. The trench is then backfilled below and around the pipe by pneumatically blowing a granular fill material into the trench first beneath the pipe and then progressively upwardly about its opposite sides to about its spring line so as simultaneously to backfill the trench and uniformly compact the fill material about the pipe without leaving any voids. The fill material is blown into the trench through a pair of opposed air ducts with upturned lower outlet ends extending into the trench on opposite sides of the pipe so that backfilling progresses upwardly on opposite sides of the pipe simultaneously. As backfilling operation progresses along the trench and approaches each support pad, the pad is deflated and removed so that the operation can proceed uninterruptedly. After the trench is pneumatically backfilled to the spring line of the pipe in the aforesaid manner, the upper portion of the trench to the soil surface can be backfilled in a conventional manner.
A method of backfilling a trench containing a pipeline comprising:
The method of backfilling a trench containing a pipeline supported at final position and grade at intervals therealong spaced above the bottom of said trench and spaced from the opposite sides thereof,
The method of backfilling a trench containing a pipeline comprising:
The method of backfilling a pipeline trench comprising the steps: