Resolution of through tubing fluid flow and behind casing fluid flow in multiple completion wells
AssigneeTexaco Inc.
InventorDan M. Arnold
Life of this patent
Estimating the term…
Loading patent…
AssigneeTexaco Inc.
InventorDan M. Arnold
Estimating the term…
A method is provided for resolving undesired fluid flow in cement channels behind casing in one producing zone of a multi zone completion well operating on gas lift from the fluid flow from lower producing zones in the same well which is contained in production tubing passing through the producing zone being investigated. Gamma rays which are characteristic of the decay of the unstable isotope nitrogen 16 produced by activation of elemental oxygen nuclei comprising the molecular structure of both the tubing fluid flow and the undesired fluid flow are detected in at least two energy bonds at two longitudinally spaced detectors in a well borehole. By appropriately combining the four count rate signals so producing according to predetermined relationships the two fluid flow components in the same direction may be uniquely distinguished on the basis of their differing distances from the gamma ray detectors.
A method for detecting the direction, linear flow rate and volume flow rate of undesired behind casing water migration in an upper producing zone of a multiple completion well operating on gas lift, wherein the upper completion zone has a production tubing string of known diameter passing therethrough from a lower completion zone which contains water cut fluid flowing at a substantially known volume flow rate in an upward direction, substantially without interrupting production from either of the completion zones, comprising the steps of:
Dependencies are inferred from the claim text.