Method of renewal of a railroad track and train therefor
AssigneeLes Fils d'Auguste Scheuchzer S.A.
InventorsFredy Scheuchzer, Fritz Buhler
Life of this patent
Estimating the term…
Abstract
The complete renewal of a railway road track, i.e. clearing and screening the ballast, and substituting new ties and rails for the old ones, comprises a continuous sequence of operations forming repeating cycles consisting in removing the old track, clearing and screening the ballast, laying a new track with a single passage of a train comprising, in addition to the apparatus necessary for performing the operations, and to the cars necessary for transporting the rails, ties and hardware accessories, at least one track-laying and removing lift of trucks equipped with gantries and frame trucks.
Claims9
Method of complete renewal of a railway track wherein the operating cycle comprises the following steps:
- a. removing along a first path by means of gantries carried by a train a track panel of an old railway track to be renewed while said train is stopped;
- b. bringing ballast-clearing members on said train to an operating position along a second path;
- c. while keeping the train at a standstill, moving the clearing members forward and clearing the ballast from a bed of the removed track panel, conveying the removed ballast to a screener, discharging the rubbish from said screener by means of other conveyors, and respreading the clean ballast on the track bed on at least two locations simultaneously;
- d. moving the clearing members outside the working area of the gantries;
- e. laying a previously assembled track panel along a third path on the respread clean ballast;
- f. moving the train forward;
- and
- g. resuming the cycle.
Method of complete renewal of an old track comprising the following steps:
- a. removing a track section of an old railway track to be renewed by means of gantries carried by a train;
- b. bringing ballast clearing members on said train to their operative position;
- c. while the train is at a standstill, causing said ballast clearing members to move forward and clear the track bed length corresponding to the removed track section, conveying the removed ballast to the screener, discharging the rubbish from said ballast and re-spreading the clean ballast on the track bed at at least two locations simultaneously;
- d. moving the ballast clearing members outside the working areas of the gantries;
- e. laying the ties on the respread clean ballast;
- f. moving the train forward while laying long rails on said ties by means of roller-type clamps;
- and
- g. resuming the cycle of operations.
A method of renewing a railway track and its bed comprising:
- a. removing a track panel as a unit from an old railway track bed;
- b. removing ballast from a trackless bed section of the railway track bed from which said track panel was removed;
- c. screening the removed ballast to remove therefrom rubbish and clean it;
- d. returning at least part of the cleaned ballast to the trackless bed section to raise it to a desired level;
- e. while screening said ballast laying at least ties on said trackless bed section to raise it to a predetermined level;
- and
- f. while returning said cleaned ballast continuously metering it to control the amount of cleaned ballast returned to said bed as a function of said predetermined level to which said bed is to be raised, and diverting said at least part of the cleaned ballast to said bed and simultaneously transporting the remainder of the metered cleaned ballast and discharging it between said ties.
Apparatus for renewing an old railway track and the bed therefor comprising, a train assembly having:
- a. cars for transporting rails, ties and necessary hardware for renewing an old railway track and the bed thereof;
- b. at least one track and rail laying lift truck means having gantries;
- c. a ballast clearing means for removing ballast of a trackless bed section from which track and ties have been removed and while said train assembly is at a standstill;
- d. a screener remote from the trackless bed section for screening the removed ballast to clean it;
- e. means for transporting the removed ballast from said clearing means to said screener;
- f. means including means for transporting cleaned ballast from said screener and respreading on said trackless bed section for rebuilding it to a desired level including metering means for automatically controlling the volume of cleaned ballast returned to said trackless bed section;
- and
- g. means coactive with said metering means for transporting the remainder of the metered cleaned ballast and delivering it between ties laid on said trackless bed section simultaneously with return of cleaned ballast to said trackless bed section.
Dependencies are inferred from the claim text.