A method of constructing cast-in-place concrete piles by which the static load bearing capacity of a pile is dynamically determined during its formation. In the disclosed method, successive charges of concrete are placed into a removable casing and subsequently driven into the soil by a drop hammer. The pile may be of the pedestal type having an enlarged base for increased load capacity. The pile shaft is formed by incrementally elevating the casing and driving concrete into a vertical series of annular enlargements corresponding to the points at which the lower end of the casing is stopped. The load capacity of the pile base and the individual enlargements is determined by measuring the resistance of the soil against penetration of the several concrete portions when driven by the hammer. This resistance is calculated as a product of the total mass of the concrete in motion and the hammer multiplied by the deceleration of the hammer and an adjustment factor to account for the effects of nonaxial concrete motion, energy losses, etc., at or about the time of zero velocity as determined by a decelerometer or any other suitable device mounted on the hammer.
A method of determining the static load capacity of a concrete pile during its construction comprising the steps of providing deceleration measuring means on a hammer of predetermined mass, charging a hole with a known mass of concrete, dropping the hammer on the charge of concrete to drive the concrete into a base of the hole, measuring the deceleration of the hammer with the decelerometer, integrating the deceleration to determine the velocity of the hammer, calculating the resistance of the soil by computing the product of the combined mass of the hammer and the charge of concrete and the value of the deceleration of the hammer substantially at the point of zero velocity, when a desirable resistance value is obtained after one or more hammer blows adding an additional charge or charges of concrete before said first-mentioned charge of concrete has set and performing the steps of determining the soil resistance set forth in relation to the first-mentioned charge with at least one successive charge.
A method of constructing a concrete pile of known load bearing capacity comprising the steps of placing a pipe casing into the soil at the desired pile location to a depth immediately above the desired position of the pile base, providing a first charge of concrete at the lower end of the pipe casing, providing a drop hammer with decelerometer means rigidly mounted thereon to measure deceleration of the hammer after impact with the first charge of concrete, dropping the hammer on the concrete charge to drive the charge axially downward and radially outwardly of the pipe end to form a pile base, integrating the deceleration of the hammer to determine its velocity, determining the static resistance of the first concrete charge by calculating the product of the sum of the mass of the hammer and the mass of the first charge of concrete and the deceleration of the hammer substantially at the point of zero velocity, redropping the hammer on the concrete charge with or without introducing an additional mass of concrete, recalculating the resistance of the pile base by computing the product of the mass of the hammer and total mass of concrete introduced into the casing and the deceleration of the redropped hammer, repeating the process of redropping the hammer with or without introduction of additional concrete mass until a desired resistance value is achieved.
Dependencies are inferred from the claim text.