Priority interrupt circuit
AssigneeFiber Controls Corporation
InventorCecil S. Wise
Life of this patent
Estimating the term…
Loading patent…
AssigneeFiber Controls Corporation
InventorCecil S. Wise
Estimating the term…
Overfeed prevention method and apparatus operative during the purging of a pneumatic line which, between purges, conveys fiber material from a source to one or more of a plurality of stations. Whenever a station indicates a demand for fibers, control circuitry causes fibers to be supplied to that station and after all the demanding stations have been so supplied, the line is purged of fibers by operating at least one (preferably the last fed one) of only those stations which received fibers during a predetermined number of previous cycles to the exclusion of and thereby preventing the overfeed of any station that did not demand to be fed during that predetermined number of previous cycles. The stations have a priority sequence so that if, during the feeding of a given station, a station having a higher priority indicates a demand, the feeding of the given station is interrupted in favor of the station having the higher priority.
Control circuitry of controlling the feeding of material from at least a single source to a plurality of stations having a set priority for receiving said material so as to prevent overfeed of any one or more of said stations during the purging of at least a single pneumatic line connecting said source and stations at the end of a cycle which begins when at least one of said stations indicates a demand and ends after at least those stations indicating a demand at the beginning of that cycle have had their demand satisfied, each station having operable means for extracting said material from said line and means for indicating a demand or no demand for said materials, comprising:
Control circuitry of controlling the feeding of material from at least a single source to a plurality of stations to prevent overfeed of any one or more of said stations during the purging of at least a single pneumatic line connecting said source and stations, each station having operable means for extracting said material from said line and means for indicating demand or no demand for said material, comprising:
Control circuitry of controlling the feeding of material from at least a single source to a plurality of stations to prevent overfeed of any one or more of said stations during the purging of at least a single pneumatic line connecting said source and stations, each station having operable means for extracting said material from said line and means for indicating a demand or no demand for said material, comprising:
A control apparatus for a material distribution system having pneumatic means for conveying fiber material, entrained in an air stream and supplied to that air stream from at least one source, to a plurality of stations having a set priority for receiving said fiber material, switch means at each station for indicating a demand for said fiber material having a first position indicating demand and a second position not indicating demand, and means at each station and associated with said indicating means for removing said fiber material from said air stream with said entrained fiber material when a source of electrical energy is applied to said removing means comprising:
A method of feeding material from at least a single source to a plurality of stations having a set priority for receiving said material so as to prevent overfill of any said station during purging of at least a single pneumatic line connecting said source and stations, each station having means for extracting said material and means for indicating demand and no demand for said material comprising the steps of:
Dependencies are inferred from the claim text.