# US 2026/0312914 A1 · Flow control-based computing system and method for switching connections between computing resources

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0312914 A1
- Document ID: US20260312914A1
- Status: Published application
- Kind: A1
- Application number: 19/457,742
- Filed: 2026-01-23
- Published: 2026-10-08
- Earliest claimed: 2025-02-13
- Assignees: Electronics and Telecommunications Research Institute
- Applicants: Electronics and Telecommunications Research Institute
- Inventors: Daeub KIM; Bup Joong KIM; Chanho PARK; Jongtae SONG; Ji Wook YOUN; Jun Ki LEE; Kyeong-Eun HAN
- Web page: https://patentgrep.com/patent/US20260312914A1

## CPC

- H04L 47/39: {Credit based}
- H04L 47/266: {Stopping or restarting the source, e.g. X-on or X-off}
- H04L 49/254: {Centralised controller, i.e. arbitration or scheduling}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A computing system is provided. The computing system may include a first to a third computing resource that transmit and receive a message, data, or a flit based on credits; a switch fabric including a first to a third switch port connected to the first to the third computing resources, respectively; and a fabric manager configured to control the switch fabric to change a one-to-one connection path between the first switch port and the second switch port to a one-to-one connection path between the first switch port and the third switch port. The fabric manager may transmit, to each of the first and second computing resources, a request to stop transmission and reception in order to change the connection path among the plurality of switch ports, and each of the first and second computing resources may stop transmission of the message, the data, or the flit based on the request to stop transmission and reception.

## Claims

### Claim 1

A computing system comprising:
a first to a third computing resource that transmit and receive a message, data, or a flit based on credits;
a switch fabric including a first to a third switch port connected to ports of the first to the third computing resource, respectively; and
a fabric manager configured to control the switch fabric to switch a one-to-one connection path between the first switch port and the second switch port to a one-to-one connection path between the first switch port and the third switch port,
wherein the fabric manager transmits, to each of the first and second computing resources, a request to stop transmission and reception in order to switch the connection path among the plurality of switch ports, and
the first computing resource and the second computing resource each stop transmission of the message, the data, or the flit based on the request to stop transmission and reception.

### Claim 2 (depends on 1)

The computing system of claim 1, wherein the first computing resource stops returning credits of the second computing resource based on the request to stop transmission and reception.

### Claim 3 (depends on 1)

The computing system of claim 1, wherein the first computing resource invalidates credits of the first computing resource to zero based on the request to stop transmission and reception.

### Claim 4 (depends on 1)

The computing system of claim 1, wherein each of the first computing resource and the second computing resource transmits, to the fabric manager, a switching preparation response based on stopping transmission of flits.

### Claim 5 (depends on 4)

The computing system of claim 4, wherein the fabric manager transmits a switching request to the switch fabric based on the switching preparation responses received from the first computing resource and the second computing resource.

### Claim 6 (depends on 5)

The computing system of claim 5, wherein the switch fabric disconnects the connection between the first switch port and the second switch port and connects the first switch port and the third switch port based on the switching request.

### Claim 7 (depends on 6)

The computing system of claim 6, wherein the fabric manager transmits a transmission/reception start request to each of the first computing resource and the third computing resource.

### Claim 8 (depends on 7)

The computing system of claim 7, wherein each of the first computing resource and the third computing resource performs credit initialization based on the transmission/reception start request, and transmits a normal response to the fabric manager based on successful completion of the credit initialization.

### Claim 9 (depends on 1)

The computing system of claim 1, wherein each of the first to the third computing resources includes a connection interface, and
wherein the connection interface includes a credit manager configured to transmit and receive credit management information with the fabric manager through a fabric management endpoint.

### Claim 10 (depends on 9)

The computing system of claim 9, wherein the credit manager is included in a link layer of the connection interface.

### Claim 11 (depends on 9)

The computing system of claim 9, wherein the request to stop transmission and reception is included in the credit management information.

### Claim 12 (depends on 1)

The computing system of claim 1, wherein the switch fabric is an optical circuit switch and each of the first to the third switch ports is an optical port.

### Claim 13 (depends on 12)

The computing system of claim 12, wherein connection interfaces included in each of the first to the third computing resources include an optical transceiver.

### Claim 14

A method for switching connections between a plurality of computing resources that transmit and receive a message, data, or a flit based on credits through a switch fabric including a plurality of switch ports, the method comprising:
determining, by a fabric manager, a start of switching for switching a connection path between a first switch port connected to a first computing resource and a second switch port connected to a second computing resource to a connection path between the first switch port and a third switch port connected to a third computing resource;
transmitting, by the fabric manager, a request to stop transmission and reception to each of the first computing resource and the second computing resource;
stopping, by each of the first computing resource and the second computing resource, transmission of the message, the data, or the flit based on the request to stop transmission and reception; and
performing, by the switch fabric, the switching.

### Claim 15 (depends on 14)

The method of claim 14, wherein stopping transmission of the message, the data, or the flit includes stopping, by the first computing resource, return of credits to the second computing resource based on the request to stop transmission and reception.

### Claim 16 (depends on 14)

The method of claim 14, wherein stopping transmission of the message, the data, or the flit further includes invalidating, by the first computing resource, credits of the first computing resource to zero based on the request to stop transmission and reception.

### Claim 17 (depends on 14)

The method of claim 14, further comprising:
transmitting, by each of the first computing resource and the second computing resource, a switching preparation response to the fabric manager based on stopping transmission of the message, the data, or the flit; and
transmitting, by the fabric manager, a switching request to the switch fabric based on the switching preparation responses received from each of the first computing resource and the second computing resource.

### Claim 18 (depends on 17)

The method of claim 17, wherein performing the switching includes:
disconnecting, by the switch fabric, the connection between the first switch port and the second switch port based on the switching request; and
connecting, by the switch fabric, the first switch port and the third switch port.

### Claim 19 (depends on 14)

The method of claim 14, wherein the switch fabric is an optical circuit switch and each of the first to the third switch ports is an optical port.

### Claim 20 (depends on 19)

The method of claim 19, wherein connection interfaces included in each of the first to the third computing resources include an optical transceiver.
