# US 2026/0310534 A1 · Autonomous Allocation of Rebuilding Resources via a Storage Network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0310534 A1
- Document ID: US20260310534A1
- Status: Published application
- Kind: A1
- Application number: 19/706,476
- Filed: 2026-06-12
- Published: 2026-10-08
- Earliest claimed: 2014-09-08
- Assignees: Everpure, Inc.
- Applicants: Everpure, Inc.
- Inventors: Ravi V. Khadiwala; Ethan S. Wozniak; Jason K. Resch; Greg R. Dhuse
- Web page: https://patentgrep.com/patent/US20260310534A1

## CPC

- G06F 11/0709: {in a distributed system consisting of a plurality of standalone computer nodes, e.g. clusters, client-server systems}
- G06F 11/1092: {Rebuilding, e.g. when physically replacing a failing disk}
- H03M 13/3761: {using code combining, i.e. using combining of codeword portions which may have been transmitted separately, e.g. Digital Fountain codes, Raptor codes or Luby Transform [LT] codes}
- H04L 67/1097: for distributed storage of data in networks, e.g. transport arrangements for network file system [NFS], storage area networks [SAN] or network attached storage [NAS]
- H03M 13/09: Error detection only, e.g. using cyclic redundancy check [CRC] codes or single parity bit
- H03M 13/1515: {Reed-Solomon codes}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H03M: CODING; DECODING; CODE CONVERSION IN GENERAL (using fluidic means F15C4/00; optical analogue/digital converters G02F7/00; coding, decoding or code conversion, specially adapted for particular applications, see the relevant subclasses, e.g. G01D, G01R, G06F, G06T, G09G, G10L, G11B, G11C, H04B, H04L, H04M, H04N; ciphering or deciphering for cryptography or other purposes involving the need for secrecy G09C)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A computing network is operable to determine to rebuild at least one data object. Rebuilding activity capacity data for rebuilding at least one data object is determined, and a set of utilization level data for of a set of rebuilding modules is determined. Autonomous allocation of rebuilding resources for rebuilding the at least one data object is performed based on generating a ranking of at least some of the set of rebuilding modules based on the set of utilization level data and the rebuilding activity capacity data, and rebuilding the at least one data object via at least one top-ranked one of the set of rebuilding modules in the ranking.

## Claims

### Claim 1

A method comprising:
determining to rebuild at least one data object;
determining rebuilding activity capacity data for rebuilding at least one data object;
determining a set of utilization level data for of a set of rebuilding modules; and
performing autonomous allocation of rebuilding resources for rebuilding the at least one data object based on:
generating a ranking of at least some of the set of rebuilding modules based on the set of utilization level data and the rebuilding activity capacity data; and
rebuilding the at least one data object via at least one top-ranked one of the set of rebuilding modules in the ranking.

### Claim 2 (depends on 1)

The method of claim 1, wherein determining the set of utilization level data is based on determining a set of expected loading levels for the set of rebuilding modules.

### Claim 3 (depends on 1)

The method of claim 1, further comprising: accessing historical tracking data to determine at least one of: the rebuilding activity capacity data or the set of utilization level data.

### Claim 4 (depends on 3)

The method of claim 3, further comprising:
determining loading level data for rebuilding the at least one data object based on performing the rebuilding the at least one data object via at least one top-ranked one of the set of rebuilding modules; and
updating the historical tracking data based on the loading levels data.

### Claim 5 (depends on 1)

The method of claim 1, wherein the autonomous allocation of rebuilding resources is performed in accordance with allocation protocol data, further comprising:
determining loading level data for rebuilding the at least one data object based on performing the rebuilding the at least one data object via at least one top-ranked one of the set of rebuilding modules; and
updating the allocation protocol data as updated allocation protocol data based on the loading levels data.

### Claim 6 (depends on 5)

The method of claim 5, further comprising:
performing subsequent autonomous allocation of rebuilding resources for a subsequent rebuilding in accordance with the updated allocation protocol data.

### Claim 7 (depends on 1)

The method of claim 1, wherein rebuilding the at least one data object via at least one top-ranked one of the set of rebuilding modules includes executing at least some of a set of rebuilding tasks via the at least one top-ranked one of the set of rebuilding modules.

### Claim 8 (depends on 1)

The method of claim 1, further comprising:
identifying traits associated with the set of rebuilding modules; and
comparing the set of rebuilding modules based on the identified traits;
wherein generating the ranking of at least some of the set of rebuilding modules is further based on comparing the set of rebuilding modules based on the identified traits.

### Claim 9 (depends on 1)

The method of claim 1, wherein at least one of the identified traits is based on available storage capacity.

### Claim 10 (depends on 1)

The method of claim 1, further comprising:
performing data storage integrity verification by periodically retrieving encoded data slices from a storage system to determine whether one or more encoded data slices have been corrupted, wherein determining to rebuild the at least one data object is based on determining the one or more encoded data slices have been corrupted.

### Claim 11 (depends on 1)

The method of claim 1, wherein rebuilding the at least one data object is based on accessing at least some of a plurality of encoded data slices corresponding to the at least one data object.

### Claim 12 (depends on 11)

The method of claim 11, wherein the plurality of encoded data slices corresponding to the at least one data object were generated via an encoding process performed upon the at least one data object.

### Claim 13 (depends on 12)

The method of claim 12, wherein the plurality of encoded data slices are generated via the encoding process based on applying erasure encoding.

### Claim 14 (depends on 12)

The method of claim 12, wherein the encoding process is performed in accordance with a width, wherein a corresponding decoding process can accommodate a number of failures equal to the width minus an error coding parameter of the encoding process, and wherein rebuilding the at least one data object is based on the corresponding decoding process.

### Claim 15

A computing device of a storage network, the computing device comprising:
memory;
an interface; and
a processing module operably coupled to the memory and the interface, wherein the processing module is operable to:
determine to rebuild at least one data object;
determine rebuilding activity capacity data for rebuilding at least one data object;
determine a set of utilization level data for of a set of rebuilding modules; and
perform autonomous allocation of rebuilding resources for rebuilding the at least one data object based on:
generating a ranking of at least some of the set of rebuilding modules based on the set of utilization level data and the rebuilding activity capacity data; and
rebuilding the at least one data object via at least one top-ranked one of the set of rebuilding modules in the ranking.

### Claim 16 (depends on 15)

The computing device of claim 15, wherein determining the set of utilization level data is based on determining a set of expected loading levels for the set of rebuilding modules.

### Claim 17 (depends on 15)

The computing device of claim 15, wherein the processing module is further operable to:
access historical tracking data to determine at least one of: the rebuilding activity capacity data or the set of utilization level data.

### Claim 18 (depends on 15)

The computing device of claim 15, wherein the autonomous allocation of rebuilding resources is performed in accordance with allocation protocol data, and wherein the processing module is further operable to:
determine loading level data for rebuilding the at least one data object based on performing the rebuilding the at least one data object via at least one top-ranked one of the set of rebuilding modules; and
update the allocation protocol data as updated allocation protocol data based on the loading levels data.

### Claim 19 (depends on 15)

The computing device of claim 15, wherein rebuilding the at least one data object via at least one top-ranked one of the set of rebuilding modules includes executing at least some of a set of rebuilding tasks via the at least one top-ranked one of the set of rebuilding modules.

### Claim 20 (depends on 15)

The computing device of claim 15, wherein the processing module is further operable to:
perform data storage integrity verification by periodically retrieving encoded data slices from a storage system to determine whether one or more encoded data slices have been corrupted, wherein determining to rebuild the at least one data object is based on determining the one or more encoded data slices have been corrupted.