# US 2026/0310278 A1 · Apparatus and method for frequency-aware intelligent power management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0310278 A1
- Document ID: US20260310278A1
- Status: Published application
- Kind: A1
- Application number: 19/094,889
- Filed: 2025-03-29
- Published: 2026-10-08
- Earliest claimed: 2025-03-29
- Assignees: Intel Corporation
- Applicants: Intel Corporation
- Inventors: Adwait Avinash Purandare; Yuval Bustan; Arpit Ashokkumar Gandhi; Roi Menahem Shor; Rami Amsis; Krishnakanth V. Sistla; Oleg Shimko
- Web page: https://patentgrep.com/patent/US20260310278A1

## CPC

- G06F 1/3243: {Power saving in microcontroller unit}
- G06F 1/3206: Monitoring of events, devices or parameters that trigger a change in power modality
- G06F 1/324: by lowering clock frequency
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Apparatus and method for frequency-aware intelligent power control. For example, an example processor comprises: a plurality of cores; power management circuitry to control power consumption of the plurality of cores in accordance with a first power control mode or a second power control mode, the power management circuitry to enter the second power control mode when a frequency of a core of the plurality of cores has dropped below a specified minimum frequency; the power management circuitry to control power consumption of the core in the first power control mode through regulation of voltages and frequencies of the core; and the power management circuitry to control power consumption in the second power control mode by reducing dynamic capacitance (Cdyn) associated with the core while the core operates at or below the specified minimum frequency.

## Claims

### Claim 1

A processor comprising:
a plurality of cores;
power management circuitry to control power consumption of the plurality of cores in accordance with a first power control mode or a second power control mode, the power management circuitry to enter the second power control mode when a frequency of a core of the plurality of cores has dropped below a specified minimum frequency;
the power management circuitry to control power consumption of the core in the first power control mode through regulation of voltages and frequencies of the core; and
the power management circuitry to control power consumption of the core in the second power control mode by reducing dynamic capacitance (Cdyn) associated with the core.

### Claim 2 (depends on 1)

The processor of claim 1, wherein when in the second power control mode, the power management circuitry is to control instruction processing parameters to reduce the Cdyn associated with the core.

### Claim 3 (depends on 2)

The processor of claim 2, wherein the instruction processing parameters comprise one or more of: speculation control levels, a power virus protection (PVP) threshold, branch prediction aggressiveness levels, prefetcher aggressiveness levels, greedy allocation/retirement operations, and uop processing limits.

### Claim 4 (depends on 3)

The processor of claim 3, wherein each speculation control level is associated with a corresponding maximum speculation rate to be used to reduce the Cdyn associated with the core.

### Claim 5 (depends on 4)

The processor of claim 4, wherein the power management circuitry is to incrementally increase the speculation control level until the core operates at the specified minimum frequency.

### Claim 6 (depends on 5)

The processor of claim 5, wherein the power management circuitry is to incrementally decrease the speculation control level while the core operates at or above the specified minimum frequency.

### Claim 7 (depends on 6)

The processor of claim 6, wherein the power management circuitry is to enter the first power control mode when the core operates at or above the specified minimum frequency in a minimum speculation control level.

### Claim 8 (depends on 1)

The processor of claim 1, wherein the power management circuitry to perform dynamic voltage and frequency scaling (DVFS) in the first control mode to regulate the voltages and frequencies of the core.

### Claim 9 (depends on 4)

The processor of claim 4, wherein the power management circuitry is to incrementally increase the speculation control level until a maximum speculation control level is reached, the power management circuitry to proportionally reduce a power virus protection threshold value until a frequency of the core is equal to or greater than the specified minimum frequency.

### Claim 10

A machine-readable medium having program code stored thereon which, when executed by power management circuitry, is to cause the power management circuitry to perform operations, comprising:
controlling, by the power management circuitry, power consumption of a plurality of cores in accordance with a first power control mode or a second power control mode, wherein the second power control mode is to be entered when a frequency of a core of the plurality of cores has dropped below a specified minimum frequency;
regulating voltages and frequencies of the core to control power consumption of the core in the first power control mode; and
reducing dynamic capacitance (Cdyn) associated with the core to control power consumption in the second power control mode.

### Claim 11 (depends on 10)

The machine-readable medium of claim 10, wherein when in the second power control mode, the power management circuitry, responsive to the program code, is to control instruction processing parameters to reduce the Cdyn associated with the core.

### Claim 12 (depends on 11)

The machine-readable medium of claim 11, wherein the instruction processing parameters comprise one or more of: speculation control levels, a power virus protection (PVP) threshold, branch prediction aggressiveness levels, prefetcher aggressiveness levels, greedy allocation/retirement operations, and uop processing limits.

### Claim 13 (depends on 12)

The machine-readable medium of claim 12, wherein each speculation control level is associated with a corresponding maximum speculation rate to be used to reduce the Cdyn associated with the core.

### Claim 14 (depends on 13)

The machine-readable medium of claim 13, wherein responsive to the program code the power management circuitry is to incrementally increase the speculation control level until the core operates at the specified minimum frequency.

### Claim 15 (depends on 14)

The machine-readable medium of claim 14, wherein responsive to the program code, the power management circuitry is to incrementally decrease the speculation control level while the core operates at or above the specified minimum frequency.

### Claim 16 (depends on 15)

The machine-readable medium of claim 15, wherein responsive to the program code, the power management circuitry is to enter the first power control mode when the core operates at or above the specified minimum frequency in a minimum speculation control level.

### Claim 17 (depends on 10)

The machine-readable medium of claim 10, wherein responsive to the program code, the power management circuitry to perform dynamic voltage and frequency scaling (DVFS) in the first control mode to regulate the voltages and frequencies of the core.

### Claim 18 (depends on 13)

The machine-readable medium of claim 13, wherein responsive to the program code, the power management circuitry is to incrementally increase the speculation control level until a maximum speculation control level is reached, the power management circuitry to proportionally reduce a power virus protection threshold value until a frequency of the core is equal to or greater than the specified minimum frequency.

### Claim 19

A method, comprising:
controlling, by power management circuitry, power consumption of a plurality of cores in accordance with a first power control mode or a second power control mode, wherein the second power control mode is to be entered when a frequency of a core of the plurality of cores has dropped below a specified minimum frequency;
regulating voltages and frequencies of the core to control power consumption of the core in the first power control mode; and
reducing dynamic capacitance (Cdyn) associated with the core to control power consumption in the second power control mode.

### Claim 20 (depends on 19)

The method of claim 19, wherein when in the second power control mode, the power management circuitry is to control instruction processing parameters to reduce the Cdyn associated with the core.
