# US 2026/0310154 A1 · Apparatus and method for scheduling unused energy supply supporting energy demand-supply prediction for each facility of plant factory

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0310154 A1
- Document ID: US20260310154A1
- Status: Published application
- Kind: A1
- Application number: 19/630,979
- Filed: 2026-03-27
- Published: 2026-10-08
- Earliest claimed: 2025-04-08
- Assignees: Korea Electronics Technology Institute
- Applicants: Korea Electronics Technology Institute
- Inventors: Min Goo LEE; Yong Kuk PARK
- Web page: https://patentgrep.com/patent/US20260310154A1

## CPC

- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

Proposed are an apparatus and method for scheduling an unused energy supply supporting energy demand-supply prediction for each facility of a plant factory to efficiently provide unused energy, such as industrial waste heat and renewable energy, to the plant factory. The supply scheduling apparatus can improve the operational efficiency of the unused energy supply by automating the entire process, including energy demand prediction, unused energy supply amount prediction, and derivation of an optimal energy supply schedule. Furthermore, the supply scheduling apparatus can offer excellent applicability and scalability in real-world energy operating environments by flexibly responding to complex external variables, such as varying energy demand and supply characteristics depending on crop types and seasons, and fluctuating energy costs across different time slots.

## Claims

### Claim 1

An apparatus for scheduling an unused energy supply to a plant factory, comprising:
a data collection processor configured to collect time-series data by measuring energy consumption for each facility of the plant factory and an unused energy supply amount supplied to the plant factory from each unused energy source;
a prediction model processor configured to generate, from the time-series data, sampling data including, for a preset period, a predicted energy demand per time slot for each facility and a predicted unused energy supply per time slot; and
a scheduling model processor based on a genetic algorithm and configured to generate an optimal energy supply schedule for the preset period from the sampling data and energy supply costs per time slot,
wherein the scheduling model processor comprises:
a genetic data generation processor configured to generate genetic data based on the sampling data,
a population generation processor configured to generate an initial population formed of a plurality of individuals including the genetic data, and a population of a new generation including at least one of a plurality of child individuals,
a fitness calculation processor configured to calculate a fitness for each individual based on the genetic data for each individual constituting one population and energy supply costs per time slot,
a parent individual selection processor configured to select two or more individuals from among the plurality of individuals as parent individuals based on the fitness,
a crossover/mutation processor configured to generate the plurality of child individuals by performing exchange and mutation of the genetic data between the parent individuals, and
an energy supply scheduling processor configured to generate an optimal energy supply schedule by selecting an individual having the highest fitness from the population of each generation as an elite individual,
wherein the genetic data generation processor is configured to generate the genetic data including unused energy storage status information per time slot (es_status[t]), an unused energy supply ratio per time slot for each facility (s_factors[i,t]), and an unused energy supply amount per time slot for each facility (supply[i,t]),
wherein an initial value of the unused energy storage status information per time slot (es_status[t]iniae) is generated as a sum of the predicted unused energy supply per time slot and a final value of the unused energy storage status information of a previous time slot (es_status[t−1]final),
wherein the crossover/mutation processor is configured to randomly exchange the unused energy supply ratio per time slot for each facility (s_factors[i,t]) between the parent individuals according to a preset crossover probability, and
wherein the crossover/mutation processor is configured to randomly change the un used energy supply ratio per time slot for each facility (s_factors[i,t]) of some of the individuals subjected to the exchange, according to a preset mutation probability.

### Claim 2 (depends on 1)

The apparatus of claim 1, wherein the prediction model processor comprises a deep learning model based on Long Short-Term Memory (LSTM) and is configured to train on the time-series data using a sliding window method.

### Claim 3

(canceled)

### Claim 4

(canceled)

### Claim 5

(canceled)

### Claim 6

(canceled)

### Claim 7 (depends on 1)

The apparatus of claim 1, wherein the unused energy supply amount per time slot for each facility (supply[i,t]) is a product of the initial value of the unused energy storage status information per time slot (es_status[t]initial) and the unused energy supply ratio per time slot for each facility (s_factors[i,t]).

### Claim 8 (depends on 7)

The apparatus of claim 7, wherein for the initial population, the unused energy supply ratio per time slot for each facility (s_factors[i,t]) is randomly set.

### Claim 9 (depends on 8)

The apparatus of claim 8, wherein the fitness calculation processor is configured to calculate the fitness through Equation 1 below by reflecting, as evaluation functions for the preset period:
an unused energy supply cost function (fB);
an unused energy final residual function (fR);
an unused energy reduction rate function (fUE);
a distance similarity function (fDS) between the energy supply costs per time slot and the predicted unused energy supply per time slot;
a directional similarity function (fPS) between the energy supply costs per time slot and the predicted unused energy supply per time slot; and
an unused energy supply-price efficiency function (fTE),
S
=
∑
f
i
·
A
i
[
Equation
⁢
1
]
f
i
=
[
f
B
,
f
R
,
f
P
⁢
S
,
f
D
⁢
S
,
f
TE
,
f
U
⁢
E
]
A
i
=
[
A
B
,
A
R
,
A
P
⁢
S
,
A
D
⁢
S
,
A
T
⁢
E
,
A
U
⁢
E
]
where S represents the fitness, fi represents an evaluation function, and Ai represents a weight for the evaluation function.

### Claim 10 (depends on 1)

The apparatus of claim 1, wherein the parent individual selection is configured to select the parent individuals using a roulette wheel selection method, in which an individual with a higher fitness has a higher probability of being selected.

### Claim 11

(canceled)

### Claim 12

(canceled)

### Claim 13

(canceled)

### Claim 14

A method for scheduling an unused energy supply to a plant factory, performed by a supply scheduling apparatus, the method comprising:
collecting time-series data by measuring energy consumption for each facility of a plant factory and an unused energy supply amount supplied to the plant factory from each unused energy source;
generating, through a prediction model based on the time-series data, sampling data including, for a preset period, a predicted energy demand per time slot for each facility and a predicted unused energy supply per time slot; and
generating an optimal energy supply schedule for the preset period by inputting the sampling data and energy supply costs per time slot into a scheduling model based on a genetic algorithm,
wherein generating the optimal energy supply schedule comprises:
generating genetic data based on the sampling data,
generating an initial population formed of a plurality of individuals including the genetic data,
calculating a fitness for each individual based on the genetic data for each individual constituting one population and energy supply costs per time slot,
selecting two or more individuals from among the plurality of individuals as parent individuals based on the fitness,
generating a plurality of child individuals by performing exchange and mutation of the genetic data between the parent individuals,
generating a population of a new generation including at least one of the plurality of child individuals, and
generating an optimal energy supply schedule by selecting an individual having the highest fitness from the population of each generation as an elite individual,
wherein generating the genetic data comprises:
generating the genetic data including unused energy storage status information per time slot (es_status[t]), an unused energy supply ratio per time slot for each facility (s_factors[i,t]), and an unused energy supply amount per time slot for each facility (supply[i,t]),
wherein an initial value of the unused energy storage status information per time slot (es_status[t]initial) is generated as a sum of the predicted unused energy supply per time slot and a final value of the unused energy storage status information of a previous time slot (es_status[t−1]final), and
wherein generating the plurality of child individuals comprises:
randomly exchanging the unused energy supply ratio per time slot for each facility (s_factors[i,t]) between the parent individuals according to a preset crossover probability, and
randomly changing the unused energy supply ratio per time slot for each facility (s_factors[i,t]) of some of the individuals subjected to the exchange, according to a preset mutation probability.

### Claim 15

(canceled)

### Claim 16

(canceled)
