# US 2026/0303444 A1 · Monitoring an industrial facilty employing industrial internet of things (iiot) sensors using a tactical compute application

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0303444 A1
- Document ID: US20260303444A1
- Status: Published application
- Kind: A1
- Application number: 19/699,742
- Filed: 2026-06-05
- Published: 2026-10-01
- Earliest claimed: 2023-10-02
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Michael John Williams; Derek Long; Peter Gregory
- Web page: https://patentgrep.com/patent/US20260303444A1

## CPC

- H04L 41/069: using logs of notifications; Post-processing of notifications
- H04L 41/142: using statistical or mathematical methods
- H04L 41/145: {involving simulating, designing, planning or modelling of a network}
- H04L 41/16: using machine learning or artificial intelligence
- H04L 67/12: specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

Systems and methods are provided for monitoring operations of an industrial facility. A gateway device is located at the industrial facility and operably coupled to sensors disposed at the industrial facility. The gateway device executes tasks configured to i) monitor alarms or triggers or other events related to operating conditions of the industrial facility, ii) identify a particular alarm or trigger or other event that is activated or set, iii) identify at least one risk associated with the particular alarm or trigger or other event that is activated or set, and iv) dynamically construct a causal network to evaluate the at least one risk. The tasks can be implemented by a behavior tree (BT) that combines automated causal network generation and risk analysis. The BT performs real-time analysis of the sensor data to generate actions or indicators from the sensor data for input to the causal network for risk analysis.

## Claims

### Claim 1

A system for monitoring operations of an industrial facility, the system comprising:
a gateway device disposed at the industrial facility and operably coupled to sensors disposed at the industrial facility, wherein the gateway device executes tasks configured to:
i) identify an event related to operating conditions of the industrial facility;
ii) identify at least one risk associated with the event;
iii) dynamically construct a causal network to evaluate the at least one risk;
iv) evaluate the causal network and generate a list of questions to evaluate the at least one risk;
v) generate or receive a list of actions or indicators corresponding to the questions, wherein the actions or indicators are computable by scarce computational resources of the gateway device from automated analysis of sensor data generated from the sensors disposed at the industrial facility;
vi) compute the actions or indicators by automated analysis of the sensor data by the scarce computational resources of the gateway device; and
vii) use the actions or indicators as input to the causal network to evaluate the at least one risk.

### Claim 2 (depends on 1)

The system of claim 1, wherein the event comprises an alarm or trigger related to operating conditions of the industrial facility.

### Claim 3 (depends on 1)

The system of claim 1, wherein the event is one of a plurality of events monitored by the gateway device.

### Claim 4 (depends on 1)

The system of claim 1, wherein the event is activated or set by the gateway device.

### Claim 5 (depends on 1)

The system of claim 1, wherein the tasks are further configured to:
viii) communicate a questionnaire to at least one human expert to obtain additional actions or indicators corresponding to the questions, wherein the additional actions or indicators are provided by the at least one human expert without the gateway device analyzing the sensor data generated from the sensors disposed at the industrial facility; and
ix) use the additional actions or indicators as input to the causal network to evaluate the at least one risk.

### Claim 6 (depends on 1)

The system of claim 1, wherein the tasks are further configured to build and output a digital report that characterizes the at least one risk based on output data generated by the causal network.

### Claim 7 (depends on 1)

The system of claim 1, wherein the tasks are implemented by a behavior tree.

### Claim 8 (depends on 1)

The system of claim 1, wherein the causal network comprises a causal Bayesian network or a causal Bayesian network stack.

### Claim 9 (depends on 1)

The system of claim 1, wherein:
the construction of the causal network involves querying and processing a domain-specific knowledge graph.

### Claim 10 (depends on 9)

The system of claim 9, wherein:
the processing of the domain-specific knowledge graph extracts a sub-network from a much larger causal network using do-calculus.

### Claim 11 (depends on 1)

The system of claim 1, wherein:
the list of actions or indicators is based on at least one of: value of information that each action or indicator brings to a specific question, and a compute cost and/or compute time for processing each action or indicator; and/or
the list of actions or indicators is determined by an AI planner module that balances value of information that each action or indicator brings to a specific question, and a compute cost and/or compute time for processing each action or indicator.

### Claim 12 (depends on 11)

The system of claim 11, wherein:
the AI planner module is configured to create a plan that identifies the list of actions or indicators that are to be computed and input to the causal network for evaluating the at least one risk.

### Claim 13 (depends on 11)

The system of claim 11, further comprising:
a cloud-computing system or other computing resource disposed remotely from the industrial facility and operably coupled to the gateway device, wherein the cloud computing system or other computing resource implements some or all of the functionality of the AI planner module.

### Claim 14

A method for monitoring operations of an industrial facility, the method comprising:
providing a gateway device disposed at the industrial facility and operably coupled to sensors disposed at the industrial facility, wherein the gateway device is configured to execute tasks that:
i) identify an event related to operating conditions of the industrial facility;
ii) identify at least one risk associated with the event;
iii) dynamically construct a causal network to evaluate the at least one risk;
iv) evaluate the causal network and generate a list of questions to evaluate the at least one risk;
v) generate or receive a list of actions or indicators corresponding to the questions, wherein the actions or indicators are computable by scarce computational resources of the gateway device from automated analysis of sensor data generated from the sensors disposed at the industrial facility;
vi) compute the actions or indicators by automated analysis of the sensor data by the scarce computational resources of the gateway device; and
vii) use the actions or indicators as input to the causal network to evaluate the at least one risk.

### Claim 15 (depends on 14)

The method of claim 14, wherein the event comprises an alarm or trigger related to operating conditions of the industrial facility.

### Claim 16 (depends on 14)

The method of claim 14, wherein the event is one of a plurality of events monitored by the gateway device.

### Claim 17 (depends on 14)

The method of claim 14, wherein the event is activated or set by the gateway device.

### Claim 18 (depends on 14)

The method of claim 14, wherein the tasks are further configured to:
viii) communicate a questionnaire to at least one human expert to obtain additional actions or indicators corresponding to the questions, wherein the additional actions or indicators are provided by the at least one human expert without the gateway device analyzing the sensor data generated from the sensors disposed at the industrial facility; and
ix) use the additional actions or indicators as input to the causal network to evaluate the at least one risk.

### Claim 19 (depends on 14)

The method of claim 14, wherein the tasks are further configured to build and output a digital report that characterizes the at least one risk based on output data generated by the causal network.

### Claim 20 (depends on 14)

The method of claim 14, wherein the tasks are implemented by a behavior tree.

### Claim 21 (depends on 14)

The method of claim 14, wherein the causal network comprises a causal Bayesian network or a causal Bayesian network stack.

### Claim 22 (depends on 14)

The method of claim 14, wherein the construction of the causal network involves querying and processing a domain-specific knowledge graph.

### Claim 23 (depends on 22)

The method of claim 22, wherein:
the processing of the domain-specific knowledge graph extracts a sub-network from a much larger causal network using do-calculus.

### Claim 24 (depends on 14)

The method of claim 14, further comprising:
generating the list of actions or indicators based on at least one of: value of information that each action or indicator brings to a specific question, and a compute cost and/or compute time for processing each action or indicator; and/or
configuring an AI planner module to generate the list of actions or indicators, wherein the AI planner module balances value of information that each action or indicator brings to a specific question, and a compute cost and/or compute time for processing each action or indicator.

### Claim 25 (depends on 24)

The method of claim 24, wherein:
the AI planner module is configured to create a plan that identifies the list of actions or indicators that are to be computed and input to the causal network for evaluating the at least one risk.

### Claim 26 (depends on 24)

The method of claim 24, further comprising:
providing a cloud-computing system or other computing resource disposed remotely from the industrial facility and operably coupled to the gateway device, wherein the cloud. computing system or other computing resource implement§. some or all of the functionality of the AI planner module.
