# US 2026/0302789 A1 · Power management apparatus and power management method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0302789 A1
- Document ID: US20260302789A1
- Status: Published application
- Kind: A1
- Application number: 19/534,866
- Filed: 2026-02-10
- Published: 2026-10-01
- Earliest claimed: 2025-03-27
- Assignees: Honda Motor Co., Ltd.
- Applicants: Honda Motor Co., Ltd.
- Inventors: Takayuki Sakurai
- Web page: https://patentgrep.com/patent/US20260302789A1

## CPC

- H02J 3/322: {the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging}
- B60L 55/00: Arrangements for supplying energy stored within a vehicle to a power network, i.e. vehicle-to-grid [V2G] arrangements
- H02J 3/17: Demand-responsive operation of AC power transmission or distribution networks
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES

## Abstract

A power management apparatus includes: an acquisition unit that acquires an assumed capacity and an assumed output of a plurality of vehicle groups corresponding to a demand response for maintaining a supply and demand balance of power; a small-scale vehicle group classification unit that classifies the vehicle groups into a plurality of small-scale vehicle groups; an expected value calculation unit that calculates a small-scale vehicle group expected value that is a maximum output sum of the small-scale vehicle groups; a request acceptance unit that accepts a request for the demand response; a request execution unit that causes the small-scale vehicle groups to execute the request for the demand response; and a priority order determination unit that determines priority order of the small-scale vehicle groups based on a time period and a type in which the request acceptance unit has accepted the request for the demand response.

## Claims

### Claim 1

A power management apparatus comprising:
an acquisition unit that acquires an assumed capacity and an assumed output of a plurality of vehicle groups corresponding to a demand response for maintaining a supply and demand balance of power;
a small-scale vehicle group classification unit that classifies the vehicle groups into a plurality of small-scale vehicle groups;
an expected value calculation unit that calculates a small-scale vehicle group expected value that is a maximum output sum of the small-scale vehicle groups;
a request acceptance unit that accepts a request for the demand response;
a request execution unit that causes the small-scale vehicle groups to execute the request for the demand response; and
a priority order determination unit that determines priority order of the small-scale vehicle groups based on a time period and a type in which the request acceptance unit has accepted the request for the demand response.

### Claim 2 (depends on 1)

The power management apparatus according to claim 1, wherein
the assumed capacity includes, as an average available supply amount, at least one of an average SOC and a battery capacity.

### Claim 3 (depends on 1)

The power management apparatus according to claim 1, wherein
the expected value calculation unit calculates the small-scale vehicle group expected value based on a charger output, a fitting ratio, an average SOC, a battery capacity, and a small-scale vehicle group vehicle number.

### Claim 4 (depends on 1)

The power management apparatus according to claim 1, wherein
the small-scale vehicle groups are classified into:
(1-1) a first group in which a fitting time period is daytime, and an average available supply amount is lower than a predetermined range;
(1-2) a second group in which the fitting time period is daytime, and the average available supply amount is within the predetermined range;
(1-3) a third group in which the fitting time period is daytime, and the average available supply amount is higher than the predetermined range;
(1-4) a fourth group in which the fitting time period is night-time, and the average available supply amount is lower than the predetermined range;
(1-5) a fifth group in which the fitting time period is night-time, and the average available supply amount is within the predetermined range; and
(1-6) a sixth group in which the fitting time period is night-time, and the average available supply amount is higher than the predetermined range,
the request for the demand response includes:
(2-1) a first request for increasing power demand in daytime time period;
(2-2) a second request for reducing power demand in daytime time period;
(2-3) a third request for increasing power demand in night-time time period; and
(2-4) a fourth request for reducing power demand in night-time time period, and
the priority order determination unit determines priority order of the first group, the second group, the third group, the fourth group, the fifth group, and the sixth group according to the first request, the second request, the third request, and the fourth request.

### Claim 5 (depends on 4)

The power management apparatus according to claim 4, wherein
in a case where the request of the demand response is the first request,
the priority order determination unit:
regards the first group as a large-output large-capacity pseudo battery, and the sixth group as a small-output small-capacity pseudo battery; and
determines priority order from the first group, the second group, the third group, the fourth group, the fifth group, to the sixth group, the priority order being an order by which the groups are regarded as the large-output large-capacity pseudo battery.

### Claim 6 (depends on 4)

The power management apparatus according to claim 4, wherein
in a case where the request of the demand response is the second request,
the priority order determination unit:
regards the third group as a large-output large-capacity pseudo battery, and the fourth group as a small-output small-capacity pseudo battery; and
determines priority order from the third group, the second group, the first group, the sixth group, the fifth group, to the fourth group, the priority order being an order by which the groups are regarded as the large-output large-capacity pseudo battery.

### Claim 7 (depends on 4)

The power management apparatus according to claim 4, wherein
in a case where the request of the demand response is the third request,
the priority order determination unit:
regards the first group as a small-output small-capacity pseudo battery, and the fourth group as a large-output large-capacity pseudo battery; and
determines priority order from the fourth group, the fifth group, the sixth group, the first group, the second group, to the third group, the priority order being an order by which the groups are regarded as the large-output large-capacity pseudo battery.

### Claim 8 (depends on 4)

The power management apparatus according to claim 4, wherein
in a case where the request of the demand response is the fourth request,
the priority order determination unit:
regards the first group as a small-output small-capacity pseudo battery, and the sixth group as a large-output large-capacity pseudo battery; and
determines priority order from the sixth group, the fifth group, the fourth group, the third group, the second group, to the first group, the priority order being an order by which the groups are regarded as the large-output large-capacity pseudo battery.

### Claim 9

A power management method that causes a computer of the power management apparatus to perform the steps comprising:
acquiring an assumed capacity and an assumed output of a plurality of vehicle groups corresponding to a demand response for maintaining a supply and demand balance of power;
classifying the vehicle groups into a plurality of small-scale vehicle groups;
calculating a small-scale vehicle group expected value that is a maximum output sum of the small-scale vehicle groups;
accepting a request for the demand response;
causing the small-scale vehicle groups to execute the request for the demand response; and
determining priority order of the small-scale vehicle groups based on a time period and a type in which the request for the demand response has been accepted.
