# US 2026/0300114 A1 · In-field structural testing

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0300114 A1
- Document ID: US20260300114A1
- Status: Published application
- Kind: A1
- Application number: 19/577,742
- Filed: 2026-03-25
- Published: 2026-10-01
- Earliest claimed: 2025-03-26
- Assignees: Arm Limited
- Applicants: Arm Limited
- Inventors: Kar-Lik Kasim WONG; Peter Andrew Rees WILLIAMS; Colin OSBORNE; Prashant Mohan KULKARNI
- Web page: https://patentgrep.com/patent/US20260300114A1

## CPC

- G06F 11/26: Functional testing
- G06F 9/4856: {resumption being on a different machine, e.g. task migration, virtual machine migration (G06F9/5088 takes precedence)}
- G06F 9/5072: {Grid computing}
- G06F 11/203: {using migration}
- G06F 11/2041: {with more than one idle spare processing component}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A method for a processing system comprising a plurality of compute tiles, comprises: processing a distributed processing workload using a first subset of the compute tiles operating in an operational state, while a second subset of compute tiles of the integrated circuit are in a non-operational state unused for processing the distributed processing workload; and in response to a test trigger event indicating that a test target compute tile of the first subset is to be selected for in-field structural testing of the test target compute tile: substituting a spare compute tile from the second subset of compute tiles for the test target compute tile, to switch the spare compute tile to become one of the first subset of compute tiles configured to process the distributed processing workload in the operational state and switch the test target compute tile to become one of the second subset of compute tiles in the non-operational state; and performing the in-field structural testing on the test target compute tile.

## Claims

### Claim 1

A method for a processing system comprising a plurality of compute tiles, comprising:
processing a distributed processing workload using a first subset of the compute tiles operating in an operational state, while a second subset of compute tiles of the integrated circuit are in a non-operational state unused for processing the distributed processing workload; and
in response to a test trigger event indicating that a test target compute tile of the first subset is to be selected for in-field structural testing of the test target compute tile:
substituting a spare compute tile from the second subset of compute tiles for the test target compute tile, to switch the spare compute tile to become one of the first subset of compute tiles configured to process the distributed processing workload in the operational state and switch the test target compute tile to become one of the second subset of compute tiles in the non-operational state; and
performing the in-field structural testing on the test target compute tile.

### Claim 2 (depends on 1)

The method according to claim 1, in which substituting the spare compute tile for the test target compute tile maintains a constant number of compute tiles available in the operational state for processing the distributed processing workload.

### Claim 3 (depends on 2)

The method according to claim 2, in which the first subset of the compute tiles are selected from among a booted subset of compute tiles booted at boot time of the processing system, and the booted subset comprises a greater number of compute tiles than said constant number.

### Claim 4 (depends on 1)

The method according to claim 1, in which each compute tile comprises at least one tile CPU.

### Claim 5 (depends on 4)

The method according to claim 4, in which each compute tile also comprises a hardware accelerator.

### Claim 6 (depends on 5)

The method according to claim 5, in which the hardware accelerator comprises accelerator circuitry configured to accelerate operations for one or more machine learning workloads.

### Claim 7 (depends on 1)

The method according to claim 1, comprising, in response to the test trigger event:
waiting for completion of a current portion of the distributed processing workload to be completed by the test target compute tile; and
upon completion of the current portion by the test target compute tile, substituting the spare compute tile for the test target compute tile and starting another portion of the distributed processing workload on the spare compute tile.

### Claim 8 (depends on 1)

The method according to claim 1, comprising, in response to the test trigger event:
halting a current portion of the distributed processing workload part way through processing of the current portion on the test target compute tile;
substituting the spare compute tile for the test target compute tile; and
re-starting, from a beginning of the current portion, the current portion on the spare compute tile.

### Claim 9 (depends on 1)

The method according to claim 1, in which the processing system comprises a plurality of integrated circuit dies; and
the test target compute tile and the spare compute tile are on different integrated circuit dies of the plurality of integrated circuit dies.

### Claim 10 (depends on 9)

The method according to claim 9, in which the plurality of integrated circuit dies are coupled via a shared memory system interconnect.

### Claim 11 (depends on 10)

The method of claim 10, in which the shared memory system interconnect comprises a coherent mesh network.

### Claim 12 (depends on 1)

The method according to claim 1, in which each compute tile comprises functional circuitry and design-for-test (DFT) circuitry to provide test access to the functional circuitry for performing the in-field structural testing.

### Claim 13 (depends on 12)

The method according to claim 12, in which the DFT circuitry comprises at least one scan chain configured to inject test values into internal storage elements of the functional circuitry of the compute tile.

### Claim 14 (depends on 12)

The method according to claim 12, in which the in-field structural testing comprises stimulating the functional circuitry according to a test sequence controlled by test software executing on at least one software-programmable processor.

### Claim 15 (depends on 1)

The method according to claim 1, in which the in-field structural testing comprises testing for hardware defects.

### Claim 16 (depends on 1)

A computer program comprising instructions which, when executed on a processing system control the processing system to perform the method of claim 1.

### Claim 17

An apparatus comprising:
a plurality of compute tiles configured to process a distributed processing workload using a first subset of the compute tiles operating in an operational state, while a second subset of compute tiles of the integrated circuit are in a non-operational state unused for processing the distributed processing workload; and
in-field structural testing infrastructure configured to control in-field structural testing of the test target compute tile;
wherein, in response to a test trigger event indicating that a test target compute tile of the first subset is to be switched from the operational state to the non-operational state to support in-field structural testing of the test target compute tile, in-field structural testing infrastructure is configured to:
substitute a spare compute tile from the second subset of compute tiles for the test target compute tile, to switch the spare compute tile to become one of the first subset of compute tiles configured to process the distributed processing workload in the operational state and switch the test target compute tile to become one of the second subset of compute tiles in the non-operational state; and
control the in-field structural testing to be performed on the test target compute tile.

### Claim 18 (depends on 17)

A system comprising:
the apparatus according to claim 17, implemented in at least one packaged chip;
at least one system component; and
a board,
wherein the at least one packaged chip and the at least one system component are assembled on the board.

### Claim 19 (depends on 18)

A chip-containing product comprising the system of claim 18, wherein the system is assembled on a further board with at least one other product component.

### Claim 20 (depends on 17)

Computer-readable code for fabrication of an apparatus according to claim 17.