# US 2026/0298377 A1 · Establishment of a connection between a pipe and a block, and block having a pipe

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0298377 A1
- Document ID: US20260298377A1
- Status: Published application
- Kind: A1
- Application number: 19/478,877
- Filed: 2024-04-03
- Published: 2026-10-01
- Earliest claimed: 2023-05-02
- Assignees: Siemens Energy Global GmbH & Co. KG
- Applicants: Siemens Energy Global GmbH & Co. KG
- Inventors: Bernd Burbaum; Matthias Gralki; David Pohle
- Web page: https://patentgrep.com/patent/US20260298377A1

## CPC

- F16L 13/0236: {having an outer ring}
- C22C 38/02: containing silicon
- C22C 38/40: with nickel
- F16L 13/08: Soldered joints
- F16L 41/084: {Soldered joints}
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- C22C: ALLOYS (treatment of alloys C21D, C22F)

## Abstract

A method for establishing a new connection between a block and a pipe, wherein the previous pipe is cut off such that a stub remains on the block, around which a supporting connection is then created so that the new pipe is connectable to the supporting connection by welding.

## Claims

### Claim 1

A method for establishing an arrangement with a new connection between an existing block and a new pipe, comprising:
cutting off a previous pipe from the block such that a stub remains on the block,
creating a supporting connection around and/or on the stub, and
connecting the new pipe to the supporting connection and/or the stub by welding.

### Claim 2 (depends on 1)

The method according to claim 1,
wherein the previous pipe was connected to the block with a soldered connection.

### Claim 3 (depends on 1)

The method according to claim 1,
wherein the supporting connection is made using an additive method.

### Claim 4 (depends on 1)

The method according to claim 1,
wherein the connection by welding between the new pipe and the supporting connection does not require postweld heat treatment.

### Claim 5 (depends on 1)

The method according to claim 1,
wherein a steel with manganese (Mn), silicon (Si), chromium (Cr), and nickel (Ni) is used for the material of the supporting connection, and/or
wherein a steel with chromium (Cr), nickel (Ni), silicon (Si) without manganese (Mn) is used for the material of the block.

### Claim 6

An arrangement of a block, comprising:
a stub as a part of a cut-off pipe, which protrudes from the block and is connected in the block by solder,
a supporting structure surrounding the stub,
wherein the supporting structure is metallurgically connected to the stub, and to a new pipe, which is metallurgically connected to the supporting structure.

### Claim 7 (depends on 6)

The arrangement according to claim 6,
wherein a steel with manganese (Mn), silicon (Si), chromium (Cr), and nickel (Ni) is used for the material of the supporting structure, and/or
wherein a steel with chromium (Cr), nickel (Ni), silicon (Si) without manganese (Mn) is used for the material of the block.

### Claim 8 (depends on 6)

The arrangement according to claim 6,
wherein at least the block comprises an austenitic steel.

### Claim 9 (depends on 6)

The arrangement according to claim 6,
wherein the material for the block is the same as for the new pipe.

### Claim 10 (depends on 6)

The arrangement according to claim 6,
wherein the material for the supporting structure is the same as the material for a welded connection between supporting structure and the new pipe.

### Claim 11 (depends on 3)

The method according to claim 3,
wherein the supporting connection is made using welding methods.

### Claim 12 (depends on 6)

The arrangement according to claim 6,
wherein the supporting structure is metallurgically connected to the stub, and to a new pipe which is welded to the supporting structure.
