# US 2026/0288110 A1 · System for achieving flexible management of the production process and digital twin interoperability

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0288110 A1
- Document ID: US20260288110A1
- Status: Published application
- Kind: A1
- Application number: 19/086,241
- Filed: 2025-03-21
- Published: 2026-09-24
- Earliest claimed: 2025-03-21
- Assignees: Mitsubishi Electric Corporation
- Applicants: Mitsubishi Electric Corporation
- Inventors: Kazuma MAKITA
- Web page: https://patentgrep.com/patent/US20260288110A1

## CPC

- G05B 19/4069: Simulating machining process on screen (G05B19/4068 takes precedence)
- G05B 2219/32301: Simulate production, process stages, determine optimum scheduling rules
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A system for creating a virtual production line, the system including a Digital Twin for synchronizing data with a manufacturing facility, a Virtual Digital Twin including a user interface, the Virtual Digital Twin being for receiving the synchronized data from the Digital Twin, receiving a user input, via the user interface, of one or more products to be produced, creating virtual production line data including a virtual production line for each of the one or more products to be produced, generating a new production schedule for the one or more products, and generating a simulation of the new production schedule in a virtual version of the manufacturing facility, and a manufacturing execution system (MES) for controlling and operating the manufacturing facility.

## Claims

### Claim 1

A Virtual Digital Twin system, the system comprising:
a Digital Twin that is configured to synchronize data with a manufacturing facility;
a Virtual Digital Twin including a user interface, the Virtual Digital Twin being configured to:
receive the synchronized data from the Digital Twin,
receive a user input, via the user interface, of one or more products to be produced,
create virtual production line data including a virtual production line for each of the one or more products to be produced,
generate a new production schedule for each of the one or more products, and
send the new production schedule to the Digital twin; and
a manufacturing execution system (MES) configured to operate the manufacturing facility and to receive the virtual production line data from the Virtual Digital Twin or the Digital Twin, wherein
the Digital Twin is further configured to generate a simulation of the new production schedule in a virtual version of the manufacturing facility.

### Claim 2 (depends on 1)

The Virtual Digital Twin system according to claim 1, further including a virtual product line generator configured to convert a first asset model of the Digital Twin to a second asset model of the Virtual Digital Twin.

### Claim 3 (depends on 2)

The Virtual Digital Twin system according to claim 2, wherein the first. asset model includes components of the manufacturing facility arranged in a machine based hierarchy, and
the second asset model bas products to be manufactured arranged in a product based hierarchy.

### Claim 4 (depends on 1)

The Virtual Digital Twin system according to claim 1, wherein the Virtual Digital Twin is further configured to:
in response to receiving the user input of the one or more products to be produced, create the virtual production line for each of the one or more products, and
set production targets and manufacturing processes for each virtual production line.

### Claim 5 (depends on 4)

The Virtual Digital Twin system according to claim 4, wherein the Virtual Digital Twin is further configured to:
display the generated schedule and resource allocation on the user interface, and
set simulation conditions, based on the user input.

### Claim 6 (depends on 5)

The Virtual Digital Twin system according to claim 5, wherein the Virtual Digital Twin is further configured to send the generated schedule and the resource allocation to the MES, and
the MES is configured to control the manufacturing facility based on the received schedule and resource allocation to produce the one or more products.

### Claim 7 (depends on 5)

The Virtual Digital Twin system according to claim 5, wherein the Digital Twin is further configured to:
determine whether the simulation conditions are met, and
in response to the simulation conditions not being met, set different simulation conditions, or cause the Virtual Digital Twin to set different simulation conditions.

### Claim 8 (depends on 5)

The Virtual Digital Twin system according to claim 5, wherein the displayed user interface includes displaying the virtual production line for each of the one or more products, and
each virtual production line includes machines from the manufacturing facility to be used to manufacture the product, a target production rate, and simulated number of produced products, and a yield rate.

### Claim 9 (depends on 1)

The Virtual Digital Twin system according to claim 1, wherein, for each of the one or more products, the Virtual Digital Twin is configured to set a production target and manufacturing processes to produce each product.

### Claim 10 (depends on 1)

The Virtual Digital Twin system according to claim 1, wherein the Virtual Digital Twin is further configured to create the virtual production line for each product having a different equipment configuration than in the manufacturing facility, and
the generating the new production schedule for the one or more products includes optimizing production conditions for the different equipment configuration.

### Claim 11 (depends on 1)

The Virtual Digital Twin system according to claim 1, wherein the Virtual Digital Twin is further configured to acquire operational data from actual equipment of the manufacturing facility from the Digital Twin and provide, in the virtual production line for each product, real-time visualization of production progress and inventory status.

### Claim 12 (depends on 1)

The Virtual Digital Twin system according to claim 1, wherein each virtual production line includes production information, and
the production information includes work-in-progress status, real-time operational data, production results, production target, and yield rate.

### Claim 13 (depends on 1)

The Virtual Digital Twin system according to claim 1, wherein the MES is further configured to use the virtual production line data to control and operate the manufacturing facility.

### Claim 14

A Virtual Digital Twin, including a user interface, the Virtual Digital Twin being configured to:
receive data from a Digital Twin that is synchronized with a manufacturing facility,
receive a user input, via the user interface, of one or more products to be produced,
create a virtual production line for each of the one or more products to be produced,
generate and display on the user interface a new production schedule for the one or more products,
cause the Digital Twin to generate and display, on the user interface, a simulation of the new production schedule in a virtual version of the manufacturing facility, and
send the new production schedule to a manufacturing execution system (MES) that is configured to operate the manufacturing facility.

### Claim 15 (depends on 14)

The Virtual Digital Twin according to claim 14, wherein the received data is converted from a first asset model, in which components of the manufacturing facility are arranged in a machine based hierarchy, to a second asset model, in which products to be manufactured are arranged in a product based hierarchy.

### Claim 16 (depends on 14)

The Virtual Digital Twin according to claim 14, wherein the Virtual Digital Twin is further configured to:
set production targets and manufacturing processes for each virtual production line,
display the generated schedule and resource allocation in the user interface, and
set simulation conditions, based on user input.

### Claim 17 (depends on 16)

The Virtual Digital Twin according to claim 16, wherein the Virtual Digital Twin is further configured to:
receive a determination, from the Digital Twin, whether the simulation conditions are met, and
in response to the simulation conditions not being met, set different simulation conditions or cause the Digital Twin to set different simulation conditions.

### Claim 18

A method for controlling a Virtual Digital Twin system, the method comprising:
synchronizing, by a Digital Twin, data with a manufacturing facility;
receiving, by a Virtual Digital Twin, the synchronized data from the Digital Twin;
receiving a user input, via a user interface, of one or more products to be produced;
creating, by the Virtual Digital Twin, virtual production line data including a virtual production line for each of the one or more products to be produced;
generating, by the Virtual Digital Twin, a new production schedule for each of the one or more products;
generating, by the Digital Twin, a simulation of the new production schedule in a virtual version of the manufacturing facility; and
receiving, by a manufacturing execution system (MES), the virtual production line data from the Virtual Digital Twin.

### Claim 19 (depends on 18)

The method according to claim 18, further comprising controlling, by the MES, the manufacturing facility based on the received virtual production line data and the new production schedule for the one or more products.

### Claim 20 (depends on 18)

The method according to claim 18, further comprising, after generating the simulation of the new production schedule, determining, by the Digital Twin, whether predetermined simulation conditions are met;
in response to the simulation conditions not being met, setting different simulation conditions; and
in response to the simulation conditions being met, sending, by the Virtual Digital Twin, the virtual production line data to the MES.
