# US 2026/0286781 A1 · Drilling a multilateral closed-loop geothermal well

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0286781 A1
- Document ID: US20260286781A1
- Status: Published application
- Kind: A1
- Application number: 19/477,372
- Filed: 2023-04-21
- Published: 2026-09-24
- Earliest claimed: 2023-04-21
- Assignees: Eavor Technologies Inc.
- Applicants: Eavor Technologies Inc.
- Inventors: Roman Kuzyk; Aleksandr Vetsak; Mark Hodder
- Web page: https://patentgrep.com/patent/US20260286781A1

## CPC

- E21B 7/061: {the tool shaft advancing relative to a guide, e.g. a curved tube or a whipstock}
- F24T 50/00: Geothermal systems (for producing mechanical power from geothermal energy F03G4/00)
- E21B 21/08: Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure (valve arrangements therefor E21B21/10)
- E21B 33/12: Packers; Plugs (used for cementing E21B33/134, E21B33/16)
- E21B 41/0035: {Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches}
- F24T 10/15: using bent tubes; using tubes assembled with connectors or with return headers
- F24T 10/20: using underground water as working fluid; using working fluid injected directly into the ground, e.g. using injection wells and recovery wells
- E21B 43/30: Specific pattern of wells, e.g. optimising the spacing of wells
- F24T 2010/53: {Methods for installation}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- F24T: GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS

## Abstract

A method performed on a wellbore system with a first surface wellbore extending from a terranean surface to a subterranean zone, a second surface wellbore extending from the terranean surface to the subterranean zone and a plurality of connecting wellbores in the subterranean zone each connecting the first and second surface wellbores. A lateral wellbore is drilled using a drill string extending through the first surface wellbore. While drilling, flow of drilling fluid from the drill string is sealed against returning towards the first surface wellbore through the connecting wellbores.

## Claims

### Claim 1

A method, comprising:
in a wellbore system comprising a first surface wellbore extending from a terranean surface to a subterranean zone, a second surface wellbore extending from the terranean surface to the subterranean zone and a plurality of connecting wellbores in the subterranean zone each connecting the first and second surface wellbores,
drilling a lateral wellbore using a drill string extending through the first surface wellbore; and
sealing, while drilling, against flow of drilling fluid from the drill string returning towards the first surface wellbore through the connecting wellbores.

### Claim 2 (depends on 1)

The method of claim 1, comprising beginning drilling the lateral wellbore by drilling through a sidewall of the first surface wellbore uphole from the connecting wellbores; and
where sealing comprises sealing the bore of the first surface wellbore uphole from the connecting wellbores.

### Claim 3 (depends on 2)

The method of claim 2, where sealing comprises sealing the bore of the first surface wellbore downhole from the beginning of the lateral wellbore.

### Claim 4 (depends on 2)

The method of claim 2, where sealing the bore of the first surface wellbore comprises placing a whipstock with a seal in the first surface wellbore.

### Claim 5 (depends on 1)

The method of claim 1, comprising drilling a second lateral wellbore using a second drill string extending through the second surface wellbore towards the first mentioned wellbore.

### Claim 6 (depends on 5)

The method of claim 5, where the first and second surface wellbores reside at the same wellsite and drilling the second lateral wellbore comprises drilling the second lateral wellbore parallel to and extending in the same direction as the first mentioned lateral wellbore; and
comprising joining the first mentioned lateral wellbore and the second lateral wellbore at an intersection of the lateral wellbores.

### Claim 7 (depends on 5)

The method of claim 5, where sealing comprises sealing an annulus around the first mentioned drill string; and
where the method comprises controlling fluid flow out of an annulus port from the annulus around the first mentioned drill string at a flow rate based on a flow rate of drilling fluid supplied through the first mentioned drill string.

### Claim 8 (depends on 1)

The method of claim 1, comprising beginning drilling the lateral wellbore by drilling through a sidewall of one of the connecting wellbores; and
where sealing comprises sealing between the beginning of the lateral wellbore and one or more of the connecting wellbores.

### Claim 9 (depends on 8)

The method of claim 8, where a first subset of the plurality of the connecting wellbores begins from a first of the connecting wellbore and a second subset of the connecting wellbores begins from a second of the connecting wellbores; and
where sealing comprises sealing the bore of the first connecting wellbore uphole from the first subset connecting wellbores and sealing the second surface wellbore.

### Claim 10 (depends on 9)

The method of claim 9, comprising drilling a second lateral using a second drill string extending through the second surface wellbore toward the first mentioned lateral wellbore;
where sealing comprises sealing an annulus around the second drill string; and
comprising controlling fluid flow out of an annulus port from the annulus around the second drill string at a flow rate based on a flow rate of drilling fluid supplied through the second drill string.

### Claim 11

A system, comprising:
a first surface wellbore extending from a terranean surface into a subterranean zone;
a second surface wellbore extending from the terranean surface into the subterranean zone;
a plurality of connecting wellbores each connecting the first and second surface wellbores;
a lateral wellbore being drilled using a drill string extending through the first surface wellbore; and
a seal in one of the wellbores, the seal sealing against flow of drilling fluid from the drill string returning to the first surface wellbore through the connecting wellbores.

### Claim 12 (depends on 11)

The system of claim 11, where the lateral wellbore begins at a sidewall of the first surface wellbore and the seal resides in the first surface wellbore sealing the bore of the first surface wellbore uphole from the connecting wellbores and downhole from the beginning of the lateral wellbore.

### Claim 13 (depends on 11)

The system of claim 11, comprising a whipstock carrying the seal.

### Claim 14 (depends on 11)

The system of claim 11, comprising a second lateral wellbore drilled using a drill string extending through the second surface wellbore, the second lateral wellbore drilled parallel to and in the same direction as the first mentioned lateral wellbore.

### Claim 15 (depends on 11)

The system of claim 11, where the lateral wellbore begins at a sidewall of a first of the connecting wellbores and the seal resides in a second of the connecting wellbores downhole from the beginning of the lateral wellbore and uphole from a beginning of a third connecting wellbore branching from the second connecting wellbore.

### Claim 16 (depends on 11)

The system of claim 11, comprising a managed pressure drilling system at the second surface wellbore configured to supply fluid to the second surface wellbore based on a flow rate of drilling fluid supplied during drilling the lateral wellbore.

### Claim 17

A method, comprising:
drilling a lateral wellbore from a first surface wellbore, the first surface wellbore coupled to a second surface wellbore by a plurality of connecting wellbores; and
sealing, while drilling, against return of drilling fluid to the first surface wellbore from the lateral wellbore through the connecting wellbores.

### Claim 18 (depends on 17)

The method of claim 17, where drilling the lateral wellbore comprises kicking off from the first surface wellbore; and
where sealing comprises sealing the bore of the first surface wellbore with a whipstock comprising a seal.

### Claim 19 (depends on 17)

The method of claim 17, where drilling the lateral wellbore comprises kicking off from one of the connecting wellbores; and
where sealing comprises sealing the bore of a connecting wellbore with a whipstock comprising a seal.

### Claim 20 (depends on 17)

The method of claim 17, comprising using managed pressure drilling to control drilling fluid flow up the second wellbore.
