# US 2026/0286698 A1 · Construction panel transport systems and methods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0286698 A1
- Document ID: US20260286698A1
- Status: Published application
- Kind: A1
- Application number: 19/085,461
- Filed: 2025-03-20
- Published: 2026-09-24
- Earliest claimed: 2025-03-20
- Assignees: Axe Buildings Incorporated
- Applicants: Axe Buildings Incorporated
- Inventors: Xavier TOBY
- Web page: https://patentgrep.com/patent/US20260286698A1

## CPC

- E04C 2/46: {specially adapted for making walls (E04C2/52, E04C2/54 take precedence; structure of slab-shaped elements E04B1/02; walls of elements of relatively thin form E04B2/72)}
- E04C 2/30: characterised by the shape or structure (translucent E04C2/54)
- E04C 2/521: {serving for locating conduits; for ventilating, heating or cooling}
- E04C 2002/002: {Panels with integrated lifting means, e.g. with hoisting lugs}
- E04C: STRUCTURAL ELEMENTS; BUILDING MATERIALS (for bridges E01D; specially designed for insulation or other protection E04B; elements used as building aids E04G; for mining E21; for tunnels E21D; structural elements with broader range of application than for building engineering F16, particularly F16S)

## Abstract

Systems and methods for transportation of construction panels. A system for transporting housing panels comprises pre-assembled construction panels having respective construction panel straps, framing panels having respective framing panel straps, and a transportation container dimensioned to accommodate the construction panels and the framing panels. A method for transporting housing panels comprises lifting the construction panels and the framing panels by respective construction panel straps and framing panel straps into an open area of the transportation container through the top of the transportation container, securing the construction panels and framing panels into the transportation container, moving the transportation container from one location to another, unsecuring the construction panels and the framing panels from the transportation container, and lifting the construction panels and framing panels out of the open area of the transportation container through the top end of the transportation container using the respective construction panel straps and framing panel straps.

## Claims

### Claim 1

A system for transporting housing panels, the system comprising:
one or more pre-assembled construction panels, each of the one or more pre-assembled construction panels including one or more respective constructive panel straps disposed within a respective inner layer of the one or more pre-assembled construction panels;
one or more framing panels, each of the one or more framing panels including one or more respective framing panel straps disposed within a respective inner layer of the one or more framing panels; and
a transportation container having a top edge side defining an open access area accessible through a top of the transport container and dimensioned to accommodate the one or more pre-assembled construction panels and the one or more framing panels.

### Claim 2 (depends on 1)

The system of claim 1, wherein the one or more constructive panel straps and the one or more framing panel straps are made from nylon or polyester.

### Claim 3 (depends on 1)

The system of claim 1, wherein each of the one or more constructive panel straps and the one or more framing panel straps are positioned in the transport container to be accessible through the open access area accessible through the top of the transport container.

### Claim 4 (depends on 3)

The system of claim 3, further comprising one or more interior walls to be accommodated by the transportation container, wherein each of the one or more interior walls further comprise one or more respective interior wall straps disposed within a respective interior wall inner layer of each of the one or more interior walls.

### Claim 5 (depends on 2)

The system of claim 2, further comprising a spreader beam configured to lift the one or more pre-assembled construction panels by the one or more respective constructive panel straps, and the one or more framing panels by the respective one or more framing panel straps.

### Claim 6 (depends on 5)

The system of claim 5, further comprising a hoisting mechanism configured to lift the spreader beam.

### Claim 7 (depends on 6)

The system of claim 6, wherein the hoisting mechanism is a crane, forklift, or telescopic handler.

### Claim 8 (depends on 7)

The system of claim 7, wherein the one or more construction panel straps and the one or more framing panel straps are configured to be removable by cutting.

### Claim 9 (depends on 1)

The system of claim 1, wherein the transportation container is between 14 m and 18 m long, between 2 m and 3 m wide, and between 2 m and 3 m tall.

### Claim 10 (depends on 1)

The system of claim 1, wherein the one or more pre-assembled construction panels and the one or more framing panels are between 6 m and 12 m long, between 2.4 m and 2.5 m high, and between 15 cm and 25 cm thick.

### Claim 11 (depends on 1)

The system of claim 1, wherein the one or more pre-assembled construction panels have a plurality of utility service channels disposed within the respective inner layer of each of the pre-assembled construction panels.

### Claim 12 (depends on 11)

The system of claim 11, wherein the utility service channels comprise waterline, drain-waste-vent, electrical, and heating, ventilation, and air conditioning.

### Claim 13 (depends on 12)

The system of claim 12, wherein the utility service channels are configured to span horizontally between a first edge side and a second edge side of the pre-assembled construction panel.

### Claim 14 (depends on 12)

The system of claim 12, further comprising spray foam disposed in areas in the respective inner layer of each of the pre-assembled construction panels where the plurality of utility services channels are not disposed.

### Claim 15 (depends on 11)

The system of claim 11, wherein the one or more framing panels do not contain any utility service channels.

### Claim 16 (depends on 1)

The system of claim 1, wherein the top edge side of the transportation container further comprises a roof covering for covering the open access area.

### Claim 17 (depends on 16)

The system of claim 16, wherein the roof covering comprises a flexible material.

### Claim 18 (depends on 17)

The system of claim 17, wherein the flexible material is canvas, polyester coated with polyurethane, polyethylene, polypropylene, vinyl, or nylon.

### Claim 19 (depends on 18)

The system of claim 18, wherein the roof covering further comprises one or more lines.

### Claim 20 (depends on 19)

The system of claim 19, wherein the roof covering is configured to be secured to the transportation container via the one or more lines to one or more hooks affixed to an outside edge of the transportation container.

### Claim 21 (depends on 20)

The system of claim 20, wherein the one or more lines are made of rope, cable, plastic cord, or elastic bungee cord.

### Claim 22 (depends on 16)

The system of claim 16, wherein the roof covering comprises a retractable roof which, in a first position, covers the entire length and width of the transportation container, and in a second position, rolls or folds towards a lateral edge side of the transportation container.

### Claim 23 (depends on 22)

The system of claim 22, wherein the retractable roof is configured to be actuated via an electric motor to move from the first position to the second position.

### Claim 24

A method for transporting housing panels, the method comprising:
at a first location, lifting one or more pre-assembled construction panels into an open access area defined by a top edge side of a transportation container and accessible through a top of the transport container using one or more respective construction panel straps disposed within a respective inner layer of each of the one or more pre-assembled construction panels;
at the first location, securing the one or more pre-assembled construction panels into the transportation container;
at the first location, lifting one or more framing panels into the open access area of the transportation container using one or more respective framing panel straps disposed within a respective framing panel inner layer of each of the framing panels;
at the first location, securing the one or more pre-assembled construction panels into the open access area of the transportation container;
moving the transportation container from the first location to a second location;
at the second location, unsecuring the one or more pre-assembled construction panels from the open access area;
at the second location, lifting the one or more pre-assembled construction panels out of the open access area defined by the top edge side of the transportation container using the one or more respective construction panel straps;
at the second location, unsecuring the one or more framing panels from the open access area; and
at the second location, lifting the one or more framing panels out of the open access area defined by the top edge side of the transportation container using the one or more respective framing panel straps.

### Claim 25 (depends on 24)

The method of claim 24, further comprising positioning the pre-assembled construction panels in the transportation container so that the one or more respective construction panel straps are accessible by the open access area defined by the top edge side of the transportation container.

### Claim 26 (depends on 24)

The method of claim 24, further comprising positioning the one or more framing panels in the transportation container so that the one or more framing panel straps are accessible by the open access area defined by the top edge side of the transportation container.

### Claim 27 (depends on 24)

The method of claim 24, further comprising:
at the first location, lifting one or more interior walls into the open access area of the transportation container using one or more respective interior wall straps disposed within a respective inner layer of each of the one or more interior walls, and securing the one or more interior walls into the open access area defined by the top edge side of the transportation container; and
at the second location, unsecuring the one or more interior walls from the open access area of the transportation container, and lifting the one or more interior walls out of the open access area of the transportation container using the one or more respective interior wall straps.

### Claim 28 (depends on 24)

The method of claim 24, wherein the lifting of the one or more pre-assembled construction panels is via the respective one or more construction panel straps using a spreader beam, the spreader beam being lifted by a hoisting mechanism, and the lifting of the one or more framing panels is via the respective one or more framing panel straps using the spreader beam, the spreader beam being lifted by the hoisting mechanism.

### Claim 29 (depends on 24)

The method of claim 24, wherein the one or more pre-assembled construction panels and the one or more framing panels are secured in the open access area of the transportation container between a respective two bracket members, the bracket members being secured to the transportation container.

### Claim 30 (depends on 24)

The method of claim 24, further comprising lifting a ceiling panel into the open access area of the transportation container at the first location, and lifting the ceiling panel out of the open access area of the transportation container at the second location.

### Claim 31 (depends on 24)

The method of claim 24, further comprising lifting a roof into the open access area of the transportation container at the first location, and lifting the roof out of the open access area of the transportation container at the second location.

### Claim 32 (depends on 24)

The method of claim 24, wherein the moving of the transportation container from the first location to the second location is via a truck, ship, or aircraft.

### Claim 33 (depends on 24)

The method of claim 24, wherein the one or more pre-assembled construction panels have a plurality of utility service channels disposed within the respective inner layer of each of the pre-assembled construction panels.

### Claim 34 (depends on 33)

The method of claim 33, further comprising applying spray foam in the areas of the respective inner layer of each of the pre-assembled construction panels where the plurality of utility services channels are not disposed, the spray foam being applied prior to lifting at the first location.