Scheduling tile program operations
AssigneeNVIDIA Corporation
InventorsWenyi Zhao, Wenzhi Yin, Yining Shi, Shuhao Jiang, Kai Zhu
Life of this patent
Estimating the term…
Loading patent…
AssigneeNVIDIA Corporation
InventorsWenyi Zhao, Wenzhi Yin, Yining Shi, Shuhao Jiang, Kai Zhu
Estimating the term…
Processors, systems, and techniques to generate schedules of operations of tile-based programs in accordance with constants on usage of functional units of an accelerator. In at least one embodiment a compiler is to generate a dependency graph indicative of operations of a tile program and determine functional units of an accelerator that would be used to perform operations in a first order indicated by the dependency graph. The compiler is further to determine a second order in which to perform the operations of the tile program based, at least in part, on constraints on usage of the determined functional units, and generate code to perform the tile program based, at least in part, on the second order.
One or more processors, comprising:
A method, comprising:
A system, comprising:
Dependencies are inferred from the claim text.