Method for a Wind Farm
AssigneeRWE Offshore Wind GmbH
InventorJan-Bernd Franke
Life of this patent
Estimating the term…
Loading patent…
AssigneeRWE Offshore Wind GmbH
InventorJan-Bernd Franke
Estimating the term…
A computer-implemented method, for a wind farm, comprising determining an actual remaining service life time of a first wind turbine of the wind farm based on a model of at least one reference wind turbine and on a first operating data set of the first wind turbine, comparing the determined actual remaining service life time of the first wind turbine with a predetermined remaining service life time of the first wind turbine, and performing a performance adjustment of a predefined performance framework of the first wind turbine for a defined future period, such that the actual remaining service life time of the first wind turbine is brought into alignment with the specified remaining service life time of the first wind turbine, upon detecting a predefinable deviation between the actual remaining service life time of the first wind turbine and the specified remaining service life time of the first wind turbine.
A computer-implemented method for a wind farm, comprising:
Dependencies are inferred from the claim text.