# US 2026/0268370 A1 · Method, apparatus, medium, electronic device, and program product for determining promoter

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0268370 A1
- Document ID: US20260268370A1
- Status: Published application
- Kind: A1
- Application number: 19/535,282
- Filed: 2026-02-10
- Published: 2026-09-10
- Earliest claimed: 2025-03-06
- Applicants: Beijing Youzhuju Network Technology Co., Ltd.
- Inventors: Tao Xiao; Yahui Lei; Wenbin Lu; Yinsong Xue
- Web page: https://patentgrep.com/patent/US20260268370A1

## CPC

- G06Q 30/0254: {based on statistics}
- G06N 3/04: Architecture, e.g. interconnection topology
- G06N 3/042: Knowledge-based neural networks; Logical representations of neural networks
- G06N 3/044: Recurrent networks, e.g. Hopfield networks
- G06N 3/0442: characterised by memory or gating, e.g. long short-term memory [LSTM] or gated recurrent units [GRU]
- G06N 3/045: Combinations of networks
- G06N 3/0464: Convolutional networks [CNN, ConvNet]
- G06N 3/048: Activation functions
- G06N 3/0499: Feedforward networks
- G06N 3/08: Learning methods
- G06N 3/084: Backpropagation, e.g. using gradient descent
- G06N 3/088: Non-supervised learning, e.g. competitive learning
- G06N 3/09: Supervised learning
- G06N 5/022: Knowledge engineering; Knowledge acquisition
- G06N 20/00: Machine learning
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A method and an apparatus for determining a promoter, a medium, an electronic device, and a program product, which relate to the technical field of the Internet. The method includes: obtaining, from a pre-trained graph model, a first vector corresponding to a target deliverer and a second vector corresponding to each of at least one candidate promoter, where the graph model is generated based on historical interaction records between every two of at least one deliverer, the at least one candidate promoter, and at least one user, and is used to describe each deliverer, each candidate promoter, and each user through a vector, and the at least one deliverer includes the target deliverer; determining a similarity between each second vector and the first vector corresponding to the target deliverer; and determining a target promoter of the target deliverer from the plurality of candidate promoters based on the similarity.

## Claims

### Claim 1

A method for determining a promoter, comprising:
obtaining, from a pre-trained graph model, a first vector corresponding to a target deliverer and a second vector corresponding to each of at least one candidate promoter, wherein the graph model is generated based on historical interaction records between every two of at least one deliverer, the at least one candidate promoter, and at least one user, and is used to describe each deliverer, each candidate promoter, and each user through a vector, and the at least one deliverer comprises the target deliverer;
determining a similarity between each second vector and the first vector corresponding to the target deliverer; and
determining a target promoter of the target deliverer from the plurality of candidate promoters based on the similarity.

### Claim 2 (depends on 1)

The method of claim 1, wherein the graph model is trained by:
obtaining the historical interaction records between every two of the at least one deliverer, the at least one candidate promoter, and the at least one user;
establishing a graph network based on the historical interaction records, wherein the graph network comprises a plurality of nodes, the nodes are used to represent the deliverers, the candidate promoters, or the users, and in the graph network, a connection edge connecting any two nodes is used to represent that there is an interaction record between the two nodes in the historical interaction records, or to represent that it is predicted, based on the historical interaction records, that the two nodes are able to generate an interaction record in the future; and
training a graph neural network model based on the graph network to obtain the graph model.

### Claim 3 (depends on 2)

The method of claim 2, wherein the connection edge is given a weight, and training a graph neural network model based on the graph network to obtain the graph model comprises:
generating a node sequence based on the graph network and at least the weight, wherein in the process of generating the node sequence, in response to determining a next node of a current node in the node sequence, a node with a larger weight among nodes having the connection edge with the current node has a greater probability of being determined as the next node;
generating a positive sample and a negative sample corresponding to a target node in the node sequence; and
iterating a loss function of the graph neural network model based on the positive sample and the negative sample corresponding to the target node to obtain the graph model.

### Claim 4 (depends on 3)

The method of claim 3, wherein in a case that the connection edge between the two nodes is used to represent that there is an interaction record between the two nodes in the historical interaction records, a weight of the connection edge between the two nodes is positively correlated with a number of interactions between the two nodes.

### Claim 5 (depends on 3)

The method of claim 3, wherein in a case that the connection edge between the two nodes is used to represent that it is predicted, based on the historical interaction records, that the two nodes are able to generate an interaction record in the future, a weight of the connection edge between the two nodes is determined through a prediction probability, and the prediction probability is used to represent a probability that the two nodes may generate an interaction record in the future.

### Claim 6 (depends on 5)

The method of claim 5, wherein the prediction probability corresponding to the two nodes is determined by:
obtaining interaction data between the two nodes within preset time; and
determining the prediction probability corresponding to the two nodes by using a pre-trained probability prediction model based on the interaction data.

### Claim 7 (depends on 1)

The method of claim 1, wherein attention paid to the candidate promoter is greater than preset attention.

### Claim 8

A non-transitory computer-readable medium having instructions stored thereon, wherein the instructions, when executed by a processing device, cause the device to:
obtain, from a pre-trained graph model, a first vector corresponding to a target deliverer and a second vector corresponding to each of at least one candidate promoter, wherein the graph model is generated based on historical interaction records between every two of at least one deliverer, the at least one candidate promoter, and at least one user, and is used to describe each deliverer, each candidate promoter, and each user through a vector, and the at least one deliverer comprises the target deliverer;
determine a similarity between each second vector and the first vector corresponding to the target deliverer; and
determine a target promoter of the target deliverer from the plurality of candidate promoters based on the similarity.

### Claim 9 (depends on 8)

The medium of claim 8, wherein the instructions causing the device to train the graph model comprise instructions causing the device to:
obtain the historical interaction records between every two of the at least one deliverer, the at least one candidate promoter, and the at least one user;
establish a graph network based on the historical interaction records, wherein the graph network comprises a plurality of nodes, the nodes are used to represent the deliverers, the candidate promoters, or the users, and in the graph network, a connection edge connecting any two nodes is used to represent that there is an interaction record between the two nodes in the historical interaction records, or to represent that it is predicted, based on the historical interaction records, that the two nodes are able to generate an interaction record in the future; and
train a graph neural network model based on the graph network to obtain the graph model.

### Claim 10 (depends on 9)

The medium of claim 9, wherein the connection edge is given a weight, and the instructions causing the device to train a graph neural network model based on the graph network to obtain the graph model comprise instructions causing the device to:
generate a node sequence based on the graph network and at least the weight, wherein in the process of generating the node sequence, in response to determining a next node of a current node in the node sequence, a node with a larger weight among nodes having the connection edge with the current node has a greater probability of being determined as the next node;
generate a positive sample and a negative sample corresponding to a target node in the node sequence; and
iterate a loss function of the graph neural network model based on the positive sample and the negative sample corresponding to the target node to obtain the graph model.

### Claim 11 (depends on 10)

The medium of claim 10, wherein in a case that the connection edge between the two nodes is used to represent that there is an interaction record between the two nodes in the historical interaction records, a weight of the connection edge between the two nodes is positively correlated with a number of interactions between the two nodes.

### Claim 12 (depends on 10)

The medium of claim 10, wherein in a case that the connection edge between the two nodes is used to represent that it is predicted, based on the historical interaction records, that the two nodes are able to generate an interaction record in the future, a weight of the connection edge between the two nodes is determined through a prediction probability, and the prediction probability is used to represent a probability that the two nodes may generate an interaction record in the future.

### Claim 13 (depends on 10)

The medium of claim 10, wherein the prediction probability corresponding to the two nodes is determined by instructions causing the device to:
obtain interaction data between the two nodes within preset time; and
determine the prediction probability corresponding to the two nodes by using a pre-trained probability prediction model based on the interaction data.

### Claim 14 (depends on 8)

The medium of claim 8, wherein attention paid to the candidate promoter is greater than preset attention.

### Claim 15

An electronic device, comprising:
a storage having instructions stored thereon; and
a processing device configured to execute the instructions in the storage to:
obtain, from a pre-trained graph model, a first vector corresponding to a target deliverer and a second vector corresponding to each of at least one candidate promoter, wherein the graph model is generated based on historical interaction records between every two of at least one deliverer, the at least one candidate promoter, and at least one user, and is used to describe each deliverer, each candidate promoter, and each user through a vector, and the at least one deliverer comprises the target deliverer;
determine a similarity between each second vector and the first vector corresponding to the target deliverer; and
determine a target promoter of the target deliverer from the plurality of candidate promoters based on the similarity.

### Claim 16 (depends on 15)

The device of claim 15, wherein the instructions causing the device to train the graph model comprise instructions causing the device to:
obtain the historical interaction records between every two of the at least one deliverer, the at least one candidate promoter, and the at least one user;
establish a graph network based on the historical interaction records, wherein the graph network comprises a plurality of nodes, the nodes are used to represent the deliverers, the candidate promoters, or the users, and in the graph network, a connection edge connecting any two nodes is used to represent that there is an interaction record between the two nodes in the historical interaction records, or to represent that it is predicted, based on the historical interaction records, that the two nodes are able to generate an interaction record in the future; and
train a graph neural network model based on the graph network to obtain the graph model.

### Claim 17 (depends on 16)

The device of claim 16, wherein the connection edge is given a weight, and the instructions causing the device to train a graph neural network model based on the graph network to obtain the graph model comprise instructions causing the device to:
generate a node sequence based on the graph network and at least the weight, wherein in the process of generating the node sequence, in response to determining a next node of a current node in the node sequence, a node with a larger weight among nodes having the connection edge with the current node has a greater probability of being determined as the next node;
generate a positive sample and a negative sample corresponding to a target node in the node sequence; and
iterate a loss function of the graph neural network model based on the positive sample and the negative sample corresponding to the target node to obtain the graph model.

### Claim 18 (depends on 17)

The device of claim 17, wherein in a case that the connection edge between the two nodes is used to represent that there is an interaction record between the two nodes in the historical interaction records, a weight of the connection edge between the two nodes is positively correlated with a number of interactions between the two nodes.

### Claim 19 (depends on 18)

The device of claim 18, wherein in a case that the connection edge between the two nodes is used to represent that it is predicted, based on the historical interaction records, that the two nodes are able to generate an interaction record in the future, a weight of the connection edge between the two nodes is determined through a prediction probability, and the prediction probability is used to represent a probability that the two nodes may generate an interaction record in the future.

### Claim 20 (depends on 18)

The device of claim 18, wherein the prediction probability corresponding to the two nodes is determined by instructions causing the device to:
obtain interaction data between the two nodes within preset time; and
determine the prediction probability corresponding to the two nodes by using a pre-trained probability prediction model based on the interaction data.
