# US 2026/0267323 A1 · Method for managing a fleet of transport units of an automation system and automation system configured to carry out said method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0267323 A1
- Document ID: US20260267323A1
- Status: Published application
- Kind: A1
- Application number: 19/551,720
- Filed: 2026-02-27
- Published: 2026-09-10
- Earliest claimed: 2025-03-07
- Assignees: Mech I Tronic S.r.l.
- Applicants: Mech I Tronic S.r.l.
- Inventors: Grégory CHOPLIN
- Web page: https://patentgrep.com/patent/US20260267323A1

## CPC

- B65G 54/02: electrostatic, electric, or magnetic
- G05B 19/41895: {using automatic guided vehicles [AGV] (control of position or course of AGV's G05D1/00)}
- G05B 19/4189: {characterised by the transport system}
- G06Q 10/06317: {Resource planning based on arrival predictions or arrival tracking}
- G06Q 10/0633: Workflow analysis
- G06Q 10/08: Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q 50/04: Manufacturing
- G08G 1/202: {Dispatching vehicles on the basis of a location, e.g. taxi dispatching}
- B65G: TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS (packaging B65B; handling thin or filamentary materials, e.g. paper sheets or thread, B65H; cranes B66C; portable mobile or lifting or hauling appliances, e.g. hoists, B66D; devices for lifting or lowering goods for loading or unloading purposes, e.g. fork-lift trucks, B66F9/00; emptying bottles, jars, casks, barrels or similar containers, not otherwise provided for, B67C9/00; delivering or transferring liquids B67D; filling or discharging vessels for liquefied, solidified or compressed gases F17C; pipe-line systems for fluids F17D)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G08G: TRAFFIC CONTROL SYSTEMS (guiding railway traffic, ensuring the safety of railway traffic B61L; arrangement of road signs or traffic signals E01F9/00; radar or analogous systems, sonar systems, lidar systems specially adapted for traffic control G01S13/91, G01S15/88, G01S17/88; {radar or analogous systems, sonar systems, lidar systems specially adapted for anti-collision purposes G01S13/93, G01S15/93, G01S17/93})

## Abstract

Method for managing a fleet of transport units of an automation system, wherein: the automation system, in addition to the fleet of transport units, comprises a movement plane and at least one automation station, the latter being configured to sequentially receive at an entrance a plurality of workpieces to be processed and to deliver at an exit a plurality of processed workpieces, the transport units 1 are independently movable on the movement plane in a controlled manner to and from an entrance and an exit of the automation station. The method comprises the steps of: a) bringing a first group of transport units loaded with a first group of workpieces to be processed, in succession: a1) to the entrance of the automation station to feed the first group of workpieces to be processed, and then a2) to a parking region of the movement plane b) downstream of a1), bringing a second group of transport units loaded with a second group of workpieces to be processed, in succession: b1) to the entrance of the automation station to feed the second group of workpieces to be processed, and then b2) to the exit of the automation station to pick up respective processed workpieces obtained from the first group of workpieces to be processed, c) downstream of a2), bringing in succession the first group of transport units from the parking region to the exit to sequentially pick up respective processed workpieces obtained from the second group of workpieces to be processed. FIG. 1

## Claims

### Claim 1

A method for managing a fleet of transport units of an automation system, wherein
the automation system comprises said fleet of transport units, a movement plane and at least one automation station, said automation station being configured to sequentially receive a plurality of workpieces to be processed at an entrance and to sequentially deliver a plurality of processed workpieces at an exit, the automation station being configured to perform one or more automation operations on the workpieces to be processed to transform said workpieces to be processed into the processed workpieces, the workpieces to be processed being organized in a first group of workpieces to be processed and in a second group of workpieces to be processed
the transport units are independently movable in the movement plane in a controlled manner to sequentially feed respective workpieces to be processed to the entrance of the automation station and sequentially collect respective processed workpieces from the exit of the automation station, the transport units being organized in a first group of transport units and in a second group of transport units, said method comprising the steps of:
a) bringing the first group of transport units, loaded with respective workpieces to be processed of the first group of workpieces to be processed, in succession:
a1) to the entrance of the automation station to feed the first group of workpieces to be processed to the automation station, and then
a2) to a parking region of the movement plane
b) after step a1), bringing the second group of transport units, loaded with respective workpieces to be processed of the second group of workpieces to be processed, in succession:
b1) to the entrance of the automation station to feed the second group of workpieces to be processed to said automation station, and then
b2) to the exit of the automation station to sequentially collect respective processed workpieces obtained from the first group of workpieces to be processed fed in step a1),
c) after step a2), bringing in succession the first group of transport units from the parking region to the exit to sequentially collect respective processed workpieces obtained from the second group of workpieces to be processed fed in step b1).

### Claim 2 (depends on 1)

The method according to claim 1, wherein, if one of the transport units of the second group of transport units is late in collecting the respective processed workpiece in step b2), the method involves the step c′) of bringing one of the transport units of the first group of transport units from the parking region to the exit to collect the processed workpiece that the late transport unit should have collected.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the entrance and the exit of the automation station are arranged on the movement plane, the parking region being distinct from the entrance and the exit of the automation station, the parking region being arranged close to the exit.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the parking region is located outside the trajectory which allows the transport units to move from the entrance to the exit of the automation station covering substantially the shortest distance possible.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the automation station is configured to transport the workpieces to be processed from the entrance to an operational region and the processed workpieces from the operational region to the exit in succession along a given path in a continuous or intermittent manner.

### Claim 6

An automation system comprising:
at least one automation station configured to sequentially receive a plurality of workpieces to be processed at an entrance, and to sequentially deliver a plurality of processed workpieces at an exit, the automation station being configured to perform one or more automation operations on the workpieces to be processed to transform said workpieces to be processed into the processed workpieces, the workpieces to be processed being organized in a first group of workpieces to be processed and in a second group of workpieces to be processed
a movement plane having a parking region where transport units can stop after having delivered the workpieces to be processed at the entrance of the automation station,
a fleet of transport units independently movable on the movement plane in a controlled manner to sequentially feed respective workpieces to be processed to the entrance of the automation station, and collect respective processed workpieces from the exit of the automation station, the transport units being organized in a first group of transport units and in a second group of transport units
a control unit configured to control the movement of each transport unit on the movement plane,
wherein the control unit is configured to control the movement of the fleet of transport units, wherein the control unit is configured to:
a) bring the first group of transport units, loaded with respective workpieces to be processed of the first group of workpieces to be processed, in succession:
a1) to the entrance of the automation station to feed the first group of workpieces to be processed to the automation station, and then
a2) to a parking region of the movement plane
b) after step a1), bring the second group of transport units, loaded with respective workpieces to be processed of the second group of workpieces to be processed, in succession:
b1) to the entrance of the automation station to feed the second group of workpieces to be processed to said automation station, and then
b2) to the exit of the automation station to sequentially collect respective processed workpieces obtained from the first group of workpieces to be processed fed in step a1),
c) after step a2), bring in succession the first group of transport units from the parking region to the exit to sequentially collect respective processed workpieces obtained from the second group of workpieces to be processed fed in step b1).

### Claim 7 (depends on 6)

The automation system according to claim 6, wherein:
the movement plane comprises first magnetic members configured to generate a magnetic field having different magnetic properties in different regions of the movement plane,
the transport units comprise second magnetic members functionally associated with the first magnetic members,
the control unit is configured to control the magnetic field generated by the first magnetic members to independently control the movement of each transport unit.

### Claim 8 (depends on 6)

The automation system according to claim 6, comprising an electronic cam extending from the entrance to the exit of the automation station, said electronic cam being configured to guide the transport units from the entrance to the exit.

### Claim 9 (depends on 6)

The automation system according to claim 6, wherein the parking region is arranged close to the exit of the automation station.

### Claim 10 (depends on 6)

The automation system according to claim 6, wherein the automation station comprises:
an operational region where said one or more automation operations are performed on the workpieces to be processed to transform them into processed workpieces,
an entrance rotary table configured to collect in succession the workpieces to be processed delivered at the entrance by the transport units and transport them towards the operational region
an exit rotary table configured to collect in succession the processed workpieces from the operational region and transport them towards the exit where they are collected by the transport units.