# US 2026/0267030 A1 · Method, equipment and medium for linear engineering geological tridimensional zoning

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0267030 A1
- Document ID: US20260267030A1
- Status: Published application
- Kind: A1
- Application number: 19/467,367
- Filed: 2026-02-02
- Published: 2026-09-10
- Earliest claimed: 2025-02-27
- Assignees: Institute of Geology and Geophysics, Cas
- Applicants: Institute of Geology and Geophysics, CAS
- Inventors: Bowen ZHENG; Zifang ZHU; Shengwen QI; Yue YANG; Guoxiang YANG; Yongshuang ZHANG; Songfeng GUO; Fan SONG; Yongchao LI; Ning LIANG; Yu ZOU; Jianing CONG; Yiwen QIN; Gaoang WEI; Chao JIN; Jingjing YING; Tao WANG; Xinyi GUO; Xiao LU; Fengjiao TANG
- Web page: https://patentgrep.com/patent/US20260267030A1

## CPC

- G01V 20/00: Geomodelling in general
- G01V 1/003: {Seismic data acquisition in general, e.g. survey design (G01V1/3808, G01V1/42 take precedence)}
- G01V 1/301: {for determining seismic cross-sections or geostructures}
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

A method, an equipment and a medium for linear engineering geological tridimensional zoning are disclosed by the present disclosure, which relate to the field of rock engineering geomechanics. The method includes: the working area undergoes plane engineering geological zoning to obtain a preliminary plane engineering geological zoning result; the preliminary plane engineering geological zoning result is optimized to obtain a final plane engineering geological zoning result; the working area undergoes profile engineering geological zoning to obtain a preliminary profile engineering geological zoning result; the preliminary profile engineering geological zoning result is optimized to obtain a final profile engineering geological zoning result; and the final plane engineering geological zoning result is combined with the final profile engineering geological zoning result to obtain a linear engineering geological tridimensional zoning image.

## Claims

### Claim 1

A method for linear engineering geological tridimensional zoning, comprising
carrying out plane engineering geological zoning on a working area is to obtain a preliminary plane engineering geological zoning result; wherein the preliminary plane engineering geological zoning result is a result obtained based on a plane zoning index;
optimizing the preliminary plane engineering geological zoning result to obtain a final plane engineering geological zoning result;
carrying out profile engineering geological zoning on the working area to obtain a preliminary profile engineering geological zoning result; wherein the preliminary profile engineering geological zoning result is a result obtained based on a profile zoning index;
optimizing the preliminary profile engineering geological zoning result to obtain a final profile engineering geological zoning result; and
combining the final plane engineering geological zoning result and the final profile engineering geological zoning result to obtain a linear engineering geological tridimensional zoning image.

### Claim 2 (depends on 1)

The method for linear engineering geological tridimensional zoning according to claim 1, wherein the carrying out plane engineering geological zoning on a working area is to obtain a preliminary plane engineering geological zoning result comprises:
acquiring engineering geological condition data of the working area; wherein the engineering geological condition data of the working area comprises geological pictures, remote sensing images and geological survey information;
determining plane zoning indexes according to the engineering geological condition data of the working area;
dividing the working area into grids to obtain a plurality of first grid units with a same size; wherein each first grid unit has a numerical value corresponding to the plane zoning index;
carrying out standardization processing on each first grid unit to obtain a standardized first unit;
determining a first correlation between various plane zoning indexes in the standardized first unit based on Pearson correlation coefficient in an SPSS software;
taking a plane zoning index of which the first correlation is greater than a first preset threshold as preliminary screening plane zoning indexes;
calculating and obtaining a comprehensive weight of each index in the preliminary screening plane zoning indexes according to an engineering geological comprehensive zoning model; wherein the engineering geological comprehensive zoning model is a model in which Euclidean distance is introduced to establish a coupled analytic hierarchy process (AHP)-entropy method;
calculating and obtaining a first engineering geological zoning index number by using a geographic information system spatial analysis method and a multi-index superposition method according to the comprehensive weight of each index in the preliminary screening plane zoning indexes; wherein the first engineering geological zoning index number grades the engineering geological conditions into four grades of good, medium, relatively poor and poor; and
obtaining the preliminary plane engineering geological zoning result by adopting a natural breakpoint grading method or an expert experience method according to the first engineering geological zoning index number.

### Claim 3 (depends on 2)

The method for linear engineering geological tridimensional zoning according to claim 2, wherein the optimizing the preliminary plane engineering geological zoning result to obtain a final plane engineering geological zoning result comprises:
carrying out random permutation and combination on the preliminary screening plane zoning indexes as input layers, with the preliminary plane engineering geological zoning result as an output layer result, and carrying out training based on a DNN model to obtain a first optimal index combination; and
taking the first optimal index combination as input layers to perform DNN simulation to predict results and obtaining the final plane engineering geological zoning result.

### Claim 4 (depends on 2)

The method for linear engineering geological tridimensional zoning according to claim 2, wherein a calculation formula of the comprehensive weight of each index is
ω
=
α
⁢
W
a
+
β
⁢
W
b
;
wherein, ω is the comprehensive weight of each index, α is a preference degree of an AHP weight of each index, β is a preference degree of an entropy weight of each index, Wa is an AHP weight of each index, Wb is an entropy weight of each index.

### Claim 5 (depends on 2)

The method for linear engineering geological tridimensional zoning according to claim 2, wherein a calculation formula of the engineering geological zoning index number is
S
1
=
∑
W
i
·
P
i
;
wherein, S1 is the engineering geological zoning index number, Wi is a coupling weight of the AHP-entropy method and Pi is an index number.

### Claim 6 (depends on 1)

The method for linear engineering geological tridimensional zoning according to claim 1, wherein the carrying out profile engineering geological zoning on a working area is to obtain a preliminary profile engineering geological zoning result comprises:
acquiring engineering geological condition data of the working area; wherein the engineering geological condition data of the working area comprises geological pictures, remote sensing images and geological survey information;
determining profile zoning indexes according to the engineering geological condition data of the working area;
dividing the working area into grids to obtain a plurality of second grid units with a same size; wherein each second grid unit has a numerical value corresponding to the profile zoning index;
carrying out standardization processing on each second grid unit to obtain a standardized second unit;
determining a second correlation between various profile zoning indexes in the standardized second unit based on Pearson correlation coefficient in an SPSS software;
taking a profile zoning index of which the second correlation is greater than a second preset threshold as preliminary screening profile zoning indexes;
determining weights of each index in the preliminary screening profile zoning indexes by adopting an AHP;
calculating and obtaining a second engineering geological zoning index number by using a geographic information system spatial analysis method and a multi-index superposition method according to the weight of each index in the preliminary screening profile zoning indexes; wherein the second engineering geological zoning index number grades the engineering geological conditions into four grades of good, medium, relatively poor and poor; and
obtaining the preliminary profile engineering geological zoning result by adopting a natural breakpoint grading method or an expert experience method according to the second engineering geological zoning index number.

### Claim 7 (depends on 6)

The method for linear engineering geological tridimensional zoning according to claim 6, wherein the optimizing the preliminary profile engineering geological zoning result to obtain a final profile engineering geological zoning result comprises:
carrying out random permutation and combination on the preliminary screening profile zoning indexes as input layers, with the preliminary profile engineering geological zoning result as an output layer result, and carrying out training based on a DNN model to obtain a second optimal index combination; and
taking the second optimal index combination as input layers to perform DNN simulation to predict results and obtaining the final profile engineering geological zoning result.

### Claim 8 (depends on 1)

The method for linear engineering geological tridimensional zoning according to claim 1, wherein the combining the final plane engineering geological zoning result and the final profile engineering geological zoning result to obtain a linear engineering geological tridimensional zoning image comprises:
smoothing the final plane engineering geological zoning result and the final profile engineering geological zoning result to obtain a smoothed plane engineering geological zoning result and a smoothed profile engineering geological zoning result;
extracting the smoothed profile engineering geological zoning result in a form of points based on ArcGIS software, enabling the points correspond to the smoothed plane engineering geological zoning result one by one, and converting a generated engineering geological zoning result of the region through which a profile railway line passes into a plane expression by using Kriging interpolation;
determining engineering geological conditions of the plane expression according to the smoothed profile engineering geological zoning result to obtain a planarized profile zoning result;
superposing the planarized profile zoning result and the smoothed plane engineering geological zoning result by using a mosaic to new raster tool to obtain a plane-profile combined zoning result of a key section; and
smoothing and optimizing the plane-profile combined zoning result of the key section is based on a focus statistical tool in the ArcGIS software to obtain the linear engineering geological tridimensional zoning image.

### Claim 9

A computer equipment comprising a memory, a processor, and a computer program stored in the memory and operable on the processor, wherein the processor executes the computer program to implement the method for linear engineering geological tridimensional zoning.

### Claim 10

A computer readable storage medium on which a computer program is stored, wherein when the computer program is executed by a processor, the method for linear engineering geological tridimensional zoning is realized.
