# US 2026/0260026 A1 · Placement assistance method, placement assistance system and data center

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0260026 A1
- Document ID: US20260260026A1
- Status: Published application
- Kind: A1
- Application number: 18/841,984
- Filed: 2023-02-28
- Published: 2026-09-03
- Earliest claimed: 2022-03-01
- Assignees: Obayashi Corporation
- Applicants: Obayashi Corporation
- Inventors: Akinori TSUNAWAKI; Riki TABATA; Hifumi IGUCHI; Koichi NAKATSUKA; Kazukiyo NUMATA
- Web page: https://patentgrep.com/patent/US20260260026A1

## CPC

- E04H 5/00: Buildings or groups of buildings for industrial or agricultural purposes
- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- E04H 2005/005: {Buildings for data processing centers}
- G06F 2113/02: Data centres
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- E04H: BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL (foundations E02D)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A method of assisting determination of placement of servers includes identifying a total rated power of multiple servers installed at one level of a building; predicting a total weight of the servers in accordance with the total rated power; distributing the total weight to the servers in accordance with a server composition ratio to classify the servers into first servers and second servers, the second servers each having a smaller weight than that of each first server; identifying locations of multiple beams supporting a floor surface of the level; placing each of the first servers directly above each of the beams; and placing each of the second servers between the first servers that are adjacent to each other.

## Claims

### Claim 1

A placement assistance method of assisting determination of placement of servers, comprising:
identifying a total rated power of multiple servers installed at one level of a building;
predicting a total weight of the servers in accordance with the total rated power;
distributing the total weight to the servers in accordance with a server composition ratio to classify the servers into first servers and second servers, the second servers each having a smaller weight than that of each first server;
identifying locations of multiple beams supporting a floor surface of the level;
placing each of the first servers directly above each of the beams; and
placing each of the second servers between the first servers that are adjacent to each other.

### Claim 2 (depends on 1)

The placement assistance method according to claim 1, further comprising reinforcing the floor surface in accordance with a load capacity of the building by providing a slab spanning the beams.

### Claim 3

A placement assistance system, comprising circuitry that assists in determination of placement of servers, wherein the circuitry is configured to execute: identifying a total rated power of multiple servers installed at one level of a building;
predicting a total weight of the servers in accordance with the total rated power;
distributing the total weight to the servers in accordance with a server composition ratio to classify the servers into first servers and second servers, the second servers each having a smaller weight than that of each first server;
identifying locations of multiple beams supporting a floor surface of the level; and
generating a layout in which each of the first servers is placed directly above each of the beams, and each of the second servers is placed between the first servers that are adjacent to each other.

### Claim 4

A data center, comprising:
multiple servers installed at one level of a building, the servers including first servers and second servers, and the second servers each having a smaller weight than that of each first server; and
multiple beams supporting a floor surface of the level, wherein
a composition ratio of the first servers and the second servers in the multiple servers is based on a total weight corresponding to a total rated power of the multiple servers, the first weight, and the second weight,
each of the first servers is placed directly above each of the beams, and
each of the second servers is placed between the first servers that are adjacent to each other.

### Claim 5 (depends on 4)

The data center according to claim 4, further comprising a slab that spans the beams to reinforce the floor surface in accordance with a load capacity of the building.