Nuclear Power Plant, Control Device for Nuclear Power Plant, and Control Method for Nuclear Power Plant
AssigneeHitachi GE Vernova Nuclear Energy, Ltd.
InventorsYukinori KATAGIRI, Yohei MURAKAMI
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi GE Vernova Nuclear Energy, Ltd.
InventorsYukinori KATAGIRI, Yohei MURAKAMI
Estimating the term…
Provided are a nuclear power plant, a control device for the nuclear power plant, and a control method for the nuclear power plant that can be utilized for power supply-demand balance adjustment when a large amount of renewable energy is connected to a system. This nuclear power plant is configured to supply steam generated in a nuclear reactor to a high-pressure turbine through a main steam control valve and supply a portion of the steam generated in the nuclear reactor to a moisture separation heater through an adjustment valve to heat exhaust steam from the high-pressure turbine. The nuclear power plant is characterized in that the reactor pressure is controlled by adjusting the amount of steam to the moisture separation heater.
A nuclear power plant in which steam generated in a nuclear reactor is supplied to a high-pressure turbine through a main steam control valve, and a portion of the steam generated in the nuclear reactor is supplied to a moisture separation heater through an adjustment valve to heat exhaust steam from the high-pressure turbine, wherein a nuclear reactor pressure is controlled by adjusting the volume of steam to the moisture separation heater.
A control device for a nuclear power plant in which steam generated in a nuclear reactor is supplied to a high-pressure turbine through a main steam control valve, and a portion of the steam generated in the nuclear reactor is supplied to a moisture separation heater through an adjustment valve to heat exhaust steam from the high-pressure turbine,
A control method for a nuclear power plant in which steam generated in a nuclear reactor is supplied to a high-pressure turbine through a main steam control valve, and a portion of the steam generated in the nuclear reactor is supplied to a moisture separation heater through an adjustment valve to heat exhaust steam from the high-pressure turbine,
Dependencies are inferred from the claim text.