# US 2026/0245023 A1 · Transport Facility

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0245023 A1
- Document ID: US20260245023A1
- Status: Published application
- Kind: A1
- Application number: 19/540,860
- Filed: 2026-02-16
- Published: 2026-08-20
- Earliest claimed: 2025-02-17
- Assignees: Daifuku Co., Ltd.
- Applicants: Daifuku Co., Ltd.
- Inventors: Kengo Ikedo
- Web page: https://patentgrep.com/patent/US20260245023A1

## CPC

- G06Q 10/08: Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- H10P 72/0612: {Production flow monitoring, e.g. for increasing throughput}
- H10P 72/3216: {using a general scheme of a conveying path within a factory}
- H10P 72/3218: {Conveying cassettes, containers or carriers}
- H10P 72/3221: {Overhead conveying}
- H10P 72/3222: {Loading to or unloading from a conveyor}
- H10P 72/3404: {Storage means}
- H10P 72/3408: {Docking arrangements}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10

## Abstract

In a transport facility, a control system executes assignment processing for assigning a first task, which is one of the tasks, to a movable body; wait processing for, after executing the assignment processing, causing the movable body to wait for a waiting time before executing the first task; assignment determination processing for, during the waiting time, determining whether or not to assign a second task, which is the other task, to the movable body; consecutive transport processing for, in a case of determining to assign the second task to the movable body, causing the movable body to execute a load transport task and a unload transport task consecutively; and single transport processing for, in a case of determining not to assign the second task to the movable body, causing the movable body to execute the first task after the waiting time elapses.

## Claims

### Claim 1

A transport facility comprising:
a movable body configured to transport an article;
a storage device comprising at least one loading section and at least one unloading section, and configured to store a plurality of articles; and
a control system configured to control the movable body, and
wherein:
the storage device is further configured to receive an article from the movable body via the loading section and store the received article, and transfer the stored article from the unloading section to the movable body,
the control system is further configured to cause the movable body to execute an unload transport task wherein the movable body receives an article from the unloading section and transports the received article to a transport destination, and a load transport task wherein the movable body transfers, to the loading section, an article received at a transport origin, and
the control system is further configured to execute:
assignment processing of assigning a first task, which is a first one of the unload transport task and the load transport task, to the movable body,
wait processing of, after executing the assignment processing, causing the movable body to wait for a predetermined waiting time before executing the first task,
assignment determination processing of, during the waiting time, determining whether or not to assign a second task, which is a second one of the unload transport task and the load transport task, to the movable body,
consecutive transport processing of, in response to the control system determining to assign the second task to the movable body in the assignment determination processing, causing the movable body to execute the load transport task and the unload transport task consecutively, and
single transport processing of, in response to the control system determining not to assign the second task to the movable body in the assignment determination processing, causing the movable body to execute the first task after the waiting time elapses.

### Claim 2 (depends on 1)

The transport facility according to claim 1, wherein:
the movable body moves in a predetermined movement direction along a predetermined movement route, and
in the storage device, the unloading section is located downstream of the loading section in the movement direction.

### Claim 3 (depends on 1)

The transport facility according to claim 1, wherein:
the first task is the unload transport task, and
in a case where the transport destination of the received article in the unload transport task is another storage device, the waiting time is set longer than in a case where the transport destination is a processing device that performs article processing.

### Claim 4 (depends on 1)

The transport facility according to claim 1, wherein:
the control system assigns the unload transport task and the load transport task to the movable body in such a manner as to minimize a cost set based on movement of the movable body and operations of the movable body comprising transfer of an article to the loading section and reception of an article from the unloading section, and
during the waiting time, the control system executes cost adjustment processing of setting the cost required to execute the second task lower than that during a time excluding the waiting time.

### Claim 5 (depends on 1)

The transport facility according to claim 1, wherein:
the movable body travels along a predetermined movement route, stops at at least one transfer position predetermined on the movement route, and performs article transfer with a processing device at the at least one transfer position,
the movement route comprises a first layer route, a second layer route located above the first layer route, and a connecting route connecting the first layer route and the second layer route,
the at least one loading section comprises a first loading section at which article transfer is performed with the movable body located on the first layer route, and a second loading section at which article transfer is performed with the movable body located on the second layer route,
the at least one unloading section comprises a first unloading section at which article transfer is performed with the movable body located on the first layer route, and a second unloading section at which article transfer is performed with the movable body located on the second layer route,
the at least one transfer position is set such that fewer transfer position is set on the second layer route than on the first layer route,
in the assignment processing, the control system executes the wait processing in a case where the first task is the unload transport task for the second unloading section or the load transport task for the second loading section, and
in the assignment processing, the control system does not execute the wait processing in a case where the first task is the unload transport task for the first unloading section or the load transport task for the first loading section.

### Claim 6 (depends on 5)

The transport facility according to claim 5, wherein:
in response to an article transport distance in the unload transport task being a predetermined determination distance or more,
in the assignment processing, the control system sets the first task to the unload transport task for the second unloading section,
in the assignment determination processing, the control system sets the second task to the load transport task for the second loading section,
in the consecutive transport processing, the control system causes the movable body to execute the load transport task for the second loading section and thereafter causes the movable body to execute the unload transport task for the second unloading section, and
in the single transport processing, the control system sets the first task to the unload transport task for the first unloading section or the unload transport task for the second unloading section, and
in response to the article transport distance in the unload transport task being less than the determination distance, in the assignment processing, the control system sets the first task to the unload transport task for the first unloading section.