# US 2026/0245020 A1 · Method for grading suitable construction range based on cold island value evaluation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0245020 A1
- Document ID: US20260245020A1
- Status: Published application
- Kind: A1
- Application number: 18/834,230
- Filed: 2023-12-21
- Published: 2026-08-20
- Earliest claimed: 2023-03-20
- Assignees: Architecs & Engineers Co., Ltd. of Southeast University
- Applicants: Architecs & Engineers Co., Ltd. of Southeast University
- Inventors: Hua LIU; Xin ZHOU; Dongqing HAN; Ying TANG; Xiaohan SHEN; Xing SHI; Xin GE; Weiren ZHUANG
- Web page: https://patentgrep.com/patent/US20260245020A1

## CPC

- G06Q 10/0637: Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q 50/08: Construction
- Y02A 10/40: Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

The present disclosure discloses a method for grading a suitable construction range based on a cold island value evaluation, comprising: acquiring the relevant data for the natural ecological elements within a research range, and determining a rigid protection range; summarizing a rigid protection range chart library, and superposing all rigid protection range charts based on a GIS platform to obtain a basic suitable construction range chart; acquiring vegetation patches and water body patches located outside the rigid protection range based on ENVI and AutoCAD platforms; performing a cold island value evaluation on the vegetation and water body patches located outside the rigid protection range based on the ENVI platform to obtain a cold island value grading chart; further grading the basic suitable construction range chart to obtain a suitable construction range grading chart; and applying the suitable construction range grading chart in a planning and designing.

## Claims

### Claim 1

A method for grading a suitable construction range based on a cold island value evaluation, comprising following steps:
Step 1, acquiring relevant data for natural ecological elements within a research range, and determining a rigid protection range;
Step 2, summarizing a rigid protection range chart library, and superposing, based on a GIS, all rigid protection range charts to obtain a basic suitable construction range chart;
Step 3, acquiring, based on an ENVI platform and an AutoCAD platform, vegetation patches and water body patches located outside the rigid protection range;
Step 4, performing, based on the ENVI platform, the cold island value evaluation on the vegetation patches and the water body patches located outside the rigid protection range to obtain a cold island value grading chart;
Step 5, further grading, according to the cold island value grading chart, the basic suitable construction range chart obtained in Step 2 to obtain a suitable construction range grading chart including a first-level suitable construction range, a second-level suitable construction range and a third-level suitable construction range; and
Step 6, applying the suitable construction range grading chart in a planning and designing, wherein a construction land with a floor area ratio greater than 0.8 is preferentially allocated within the first-level suitable construction range, when a total amount of the construction land in the first-level suitable construction range is insufficient, then the construction land with the floor area ratio greater than 0.8 is selected to be allocated within the second-level suitable construction range, and when a total amount of the construction land in the second-level suitable construction range is still insufficient, then the construction land with the floor area ratio greater than 0.8 is selected to be allocated within the third-level suitable construction range.

### Claim 2 (depends on 1)

The method for grading the suitable construction range based on the cold island value evaluation according to claim 1, wherein in the Step 1, the relevant data for the natural ecological elements are AutoCAD vector terrain files, satellite image files and statutory planning documents in the research range.

### Claim 3 (depends on 1)

The method for grading the suitable construction range based on the cold island value evaluation according to claim 1, wherein in the Step 1, the rigid protection range is a protection content explicitly stated in the statutory planning documents, including ecological management control regions at all levels, and graded reservoirs or river courses.

### Claim 4 (depends on 1)

The method for grading the suitable construction range based on the cold island value evaluation according to claim 1, wherein the Step 2 specifically includes:
performing, through GIS platform, an image process on data for the rigid protection range to summarize and obtain the rigid protection range chart library, and display an area surrounded by clear closed boundary lines; and
superposing all rigid protection rang charts to form an unsuitable construction range, wherein remaining parts within the research range is the suitable construction range, forming the basic suitable construction range chart.

### Claim 5 (depends on 1)

The method for grading the suitable construction range based on the cold island value evaluation according to claim 1, wherein the Step 3 specifically includes following sub-steps:
Step 3-1: acquiring a Landsat8 satellite image corresponding to a research city, obtaining a LST file of a land surface temperature and a normalized difference vegetation index, and generating a land surface temperature image; and
Step 3-2: selecting a region with a value for the normalized difference vegetation index in a remote sensing image processing platform software of ENVI to obtain the vegetation patches, wherein a value for the normalized difference vegetation index ranges from 0.48 to 1; obtaining the water body patches according to the relevant data for the natural ecological elements; respectively intersecting the vegetation patches and the water body patches with the basic suitable construction range chart in Step 2 to form the vegetation patches and the water body patches located outside the rigid protection range.

### Claim 6 (depends on 1)

The method for grading the suitable construction range based on the cold island value evaluation according to claim 1, wherein the Step S4 specifically includes following sub-steps:
Step 4-1: superposing the vegetation patches and the water body patches located outside the rigid protection range on the land surface temperature image, extracting the land surface temperatures at the patch boundaries and the land surface temperatures in the regions within 600 m from the patch boundaries, drawing a line outward every 30 m with the patch boundary as a center, calculating an average temperature of each of the lines and drawing a broken line graph of temperature various, wherein a breakpoint in the broken line graph with a slop closet to 0 and closet to the patch boundary is set as an acting range breakpoint, and a line where the breakpoint is located is a slow-heating range patch of the vegetation and a slow-heating range patch of the water body;
Step 4-2: extracting, based on the land surface temperature image in the Step 3, the land surface temperatures at all slow-heating range patch boundaries within a region; calculating and obtaining an average temperature of a corresponding slow-heating range patch; taking the average temperature of the slow-heating range patch boundary as a temperature distinguishing the cold and heat islands, to obtain a distribution chart of the cold and heat island ranges in the region;
Step 4-3: extracting, based on the land surface temperature image in the Step 3, land surface temperatures in vegetation and water body cold island ranges;
Step 4-4: calculating, based on the land surface temperature within the water body cold island range, an average land surface temperature in each of the water body cold island ranges; performing, by utilizing an Euclidean distance measurement formula, a k-means clustering according to an area of the water body cold island range and the average land surface temperature of the water body cold island range, and setting a clustering result into three categories, and dividing, on a basis of a value for the average land surface temperature in the region in each of the categories, the water body cold island into three value regions of a low value region, a medium value region and a high value region;
Step 4-5: correspondingly dividing, by utilizing a mean-standard deviation grading method, the vegetation cold island into three value regions of a high value region, a medium value region and a low value region based on the land surface temperature in the vegetation cold island range, wherein T denotes the average land surface temperature in the region;
Category
Grading Method
Mean temperature
μ
Standard deviation of temperature
std
variation
High value region
T < μ −2std
Medium value region
μ −2std ≤ T ≤ μ +2std
Low value region
T > μ +2std
Step 4-6: dividing, according to the cold island value evaluations of the vegetation and water body, a first-level cold island range and a second-level cold island range to obtain a cold island value grading chart;
wherein the first-level cold island range is a superposition of the water bodies and the vegetation included in the high value region, and the second-level cold island range is a superposition of the water bodies and the vegetation included in the medium value region.

### Claim 7 (depends on 1)

The method for grading the suitable construction range based on the cold island value evaluation according to claim 1, wherein the Step 5 specifically includes:
superposing the cold island value grading chart obtained in the Step 4 on the basic suitable construction range chart obtained in the Step 2, further decomposing, after processing by the GIS platform, the basic suitable construction range into a first-level suitable construction range, a second-level suitable construction range and a third-level suitable construction range to obtain the suitable construction grading chart;
wherein the first-level suitable construction range is a difference set between the basic suitable construction range and the first-level and the second-level cold island ranges;
the second-level suitable construction range is an intersection between the basic suitable construction range and the second-level cold island range; and
the third-level suitable construction range is an intersection between the basic suitable construction range and the first-level cold island range.

### Claim 8 (depends on 1)

The method for grading the suitable construction range based on the cold island value evaluation according to claim 1, wherein the suitable construction range grading chart described in the Step 5 is a vector file utilized as a basis of a layout of a development and construction land or utilized to enter a planning and control program.
