# US 2026/0243850 A1 · System and method for detecting a faulty connection in an earth grid or an equipment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0243850 A1
- Document ID: US20260243850A1
- Status: Published application
- Kind: A1
- Application number: 18/998,240
- Filed: 2023-07-29
- Published: 2026-08-20
- Earliest claimed: 2023-07-03
- Assignees: Jef Techno Solutions Pyt Ltd; Jio Platforms Limited
- Applicants: Jef Techno Solutions Pyt Ltd; Jio Platforms Limited
- Inventors: Prashanth Belur Gururaja Rao
- Web page: https://patentgrep.com/patent/US20260243850A1

## CPC

- G01R 31/66: Testing of connections, e.g. of plugs or non-disconnectable joints (testing for incorrect line connections G01R31/55)
- H04W 60/001: {Registration rejection or failure}
- H04L 67/1036: Load balancing of requests to servers for services different from user content provisioning, e.g. load balancing across domain name servers
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A system for detecting a faulty connection in an earth grid (104) or an equipment, which includes a plurality of equipment (102A-B), a current injection device (110) and a plurality of current measuring devices (116, 118). A first reference riser (106A) and a second riser (108) receive a first input current from the current injection device and provide the first input current to the earth grid. The second riser receives a second input current from the current injection device and provide the second input current to the second riser under test. The plurality of current measuring devices includes a first current measuring device that measures a first current and a second current measuring device that measures a second current. The system compares the first current, the second current, the first input current, and the second input current and determines a faulty connection in the earth grid or the equipment.

## Claims

### Claim 1

A system for detecting a faulty connection in an earth grid (104) or an equipment, wherein the system comprises:
an earth grid (104);
a plurality of equipment (102A-B) that is connected to the earth grid (104), comprises:
a first equipment (102A) that is connected to the earth grid (104) through a plurality of first risers (106A-B); and
a second equipment (102B) that is connected to the earth grid (104) through a second riser (108);
a current injection device (110) comprises:
a frequency converter (502) that modifies an input current with grid frequency into an input current with off grid frequency; and
a current unit (504) that regulates the input current with off grid frequency into a variable input current with off grid frequency;
wherein when the current injection device (110) is electrically connected to (i) a first reference riser (106A) from the plurality of the first risers (106) at a first current injection point (112) and (ii) the second riser (108) at a second current injection point (114), the first reference riser (106A) and the second riser (108) receive a first input current with off-grid frequency from the current injection device (110) and provide the first input current with off-grid frequency to the earth grid (104) for detecting a faulty connection using the second riser (108) that is under test, wherein when the current injection device (110) is electrically connected to (i) the second equipment (102B) or a body of the second equipment (102B) at a third current injection point (120) and (ii) the second riser (108) at the second current injection point (114), the second equipment (102B) or the body of the second equipment (102B) and the second riser (108) receive a second input current with off grid frequency from the current injection device (110) and provide the second input current with off-grid frequency to the second riser (108) under test for detecting a faulty connection in the second equipment (102B) or the body of the second equipment (102B) using the second riser (108) that is under test; and
a plurality of current measuring devices (116, 118) comprising a first current measuring device (116) that is connected to the second riser (108) below the second current injection point (114) and a second current measuring device (118) that is connected to the second riser (108) above the second current injection point (114), wherein the first current measuring device (116) measures a first current that is received by the second riser (108) from the earth grid (104) and the second current measuring device (118) measures a second current that is received by the second riser (108) from the second equipment (102B) or the body of the second equipment (102B),
characterized in that, wherein the system compares the first current, the second current, the first input current, and the second input current and determines a faulty connection in
(i) the second equipment (102B) if at least one of (a) the second current that is received by the second riser (108) under test from the body of the second equipment (102B) is below the first current that is received by the second riser (108) under test from the earth grid (104), (b) the second current that is received by the second riser (108) under test from the second equipment (102B) is below the second input current that is provided to the body of the second equipment (102B), or (c) the second current that is received by the second riser (108) under test from the body of the second equipment (102B) is zero, and
(ii) the earth grid (104) if at least one of (a) the first current that is received by the second riser (108) under test from the earth grid (104) is below the second current that is received by the second riser (108) under test from the body of the second equipment (102B), (b) the first current that is received by the second riser (108) under test from the earth grid (104) is below the first input current that is provided to the earth grid (104), or (c) the first current that is received by the second riser (108) under test from the earth grid (104) is zero.

### Claim 2 (depends on 1)

The system as claimed in claim 1, wherein the system determines a location of the faulty connection in the second equipment (102B) or the body of the second equipment (102B) more accurately by (i) changing the third current injection point (120) to a pole structure (122) of the second equipment (102B) above a first termination point (202) where the second riser (108) is terminated, (ii) providing the second input current with off-grid frequency at the third current injection point (120) and to the second current injection point (114), (iii) measuring, using the second current measuring device (118), the second current that is received by the second riser (108) from the pole structure (122) of the second equipment (102B), and (iv) comparing at least two of the first current, the second current and the second input current to determine a faulty connection in the first termination point (202).

### Claim 3 (depends on 1)

The system as claimed in claim 1, wherein the system determines a location of the faulty connection in the second equipment (102B) or the body of the second equipment (102B) more accurately by (i) changing (a) the third current injection point (120) to a frame (124) of the second equipment (102B) above a second termination point (302) where a pole structure (122) is bonded with the frame (124) and (b) the second current injection point (114) to the pole structure (122) below the second termination point (302), (ii) providing the second input current with off-grid frequency to (a) the frame (124) of the second equipment (102B) and (b) the pole structure (122) which acts a riser under test, (iii) measuring, using the second current measuring device (118), the second current that is received by the pole structure (122) from the frame (124) of the second equipment (102B), and (iv) comparing at least two of the first current, the second current, and the second input current to determine a faulty connection in the second termination point (302).

### Claim 4 (depends on 1)

The system as claimed in claim 1, wherein the system determines a location of the faulty connection in the second equipment (102B) or the body of the second equipment (102B) more accurately by (i) changing the second current injection point (114) to the frame (124) of the second equipment (102B) below a third termination point (402) where the frame (124) is bonded with the second equipment (102B), (ii) providing the second input current with off-grid frequency to (a) the second equipment (102B) and (b) the frame (124) of the second equipment (102B) which acts a riser under test, (iii) measuring, using the second current measuring device (118), the second current that is received by the frame (124) of the second equipment (102B) from the second equipment (102B), and (iv) comparing at least two of the first current, the second current, and the second input current to determine a faulty connection in the third termination point (402).

### Claim 5 (depends on 4)

The system as claimed in claim 4, wherein the current injection device (110) is electrically connected to the frame (124) of the second equipment (102B) or the pole structure (122) of the second equipment (102B) at the third current injection point (120) for providing the second input current with off-grid frequency.

### Claim 6 (depends on 1)

The system as claimed in claim 1, wherein the first input current or the second input current ranges from 1 ampere to 20 amperes.

### Claim 7 (depends on 1)

The system as claimed in claim 1, wherein the first input current or the second input current comprise an alternate current (AC) or a direct current (DC).

### Claim 8 (depends on 1)

The system as claimed in claim 1, wherein the first reference riser (106A) is a conductor that connects the current injection device (110) and the earth grid (104).

### Claim 9 (depends on 1)

The system as claimed in claim 1, wherein the first reference riser (106A) is a node taken from the earth grid (104) to provide the first input current from the current injection device (110) to the earth grid (104), wherein the second riser (108) is a node taken from the second equipment (102B) or the body of the second equipment (102B) to provide the second input current from the current injection device (110) to the second equipment (102B) or the body of the second equipment (102B).

### Claim 10 (depends on 1)

The system as claimed in claim 1, wherein the second riser (108) under test is a conductor that is connected with (i) the second equipment (102B) or the body of the second equipment (102B) to receive the second input current from the second equipment (102B) or the body of the second equipment (102B) and (ii) the earth grid (104) to receive the first input current from the earth grid (104), wherein the second input current from the second equipment (102B) or the body of the second equipment (102B) and the first input current from the earth grid (104) are provided to the first current measuring device (116) and the second current measuring device (118) for measuring the first current and the second current respectively.

### Claim 11

A method for detecting a faulty connection in an earth grid (104) or an equipment, wherein the earth grid (104) is connected to a plurality of equipment (102A-B), wherein a first equipment (102A) from the plurality of equipment (102A-B) is connected to the earth grid (104) through a plurality of first risers (106A-B) and a second equipment (102B) from the plurality of equipment (102A-B) is connected to the earth grid (104) through a second riser (108), wherein the method comprises:
modifying, using a frequency converter (502) of a current injection device (110) of a system, an input current with grid frequency into an input current with off grid frequency;
regulating, using a current unit (504) of the current injection device (110), the input current with off grid frequency into a variable input current with off grid frequency;
receiving, using a first reference riser (106A) and a second riser (108) of the system, a first input current with off-grid frequency from a current injection device (110) and providing the first input current with off-grid frequency to an earth grid (104) for detecting a faulty connection using the second riser (108) that is under test when the current injection device (110) is electrically connected to (i) the first reference riser (16A) from the plurality of the first risers (106A-B) at a first current injection point (112) and (ii) the second riser (108) at a second current injection point (114);
receiving, using a second equipment (102B) or a body of the second equipment (102B) and the second riser (108) of the system, a second input current with off grid frequency from the current injection device (110) and providing the second input current with off-grid frequency to the second riser (108) under test for detecting a faulty connection in the second equipment (102B) or the body of the equipment (102B) using the second riser (108) that is under test when the current injection device (110) is electrically connected to (i) a second equipment (102B) or a body of the second equipment (102B) at a third current injection point (120) and (ii) the second riser (108) at the second current injection point (114);
measuring, using a first current measuring device (116) of the system, a first current that is received by the second riser (108) from the earth grid (104);
measuring, using a second current measuring device (118) of the system, a second current that is received by the second riser (108) from the second equipment (102B) or the body of the second equipment (102B); and
characterized in that, comparing, using the system, the first current, the second current, the first input current, and the second input current and determining a faulty connection in
(i) the second equipment (102B) if at least one of (a) the second current that is received by the second riser (108) under test from the body of the second equipment (102B) is below the first current that is received by the second riser (108) under test from the earth grid (104), (b) the second current that is received by the second riser (108) under test from the second equipment (102B) is below the second input current that is provided to the body of the second equipment (102B), or (c) the second current that is received by the second riser (108) under test from the body of the second equipment (102B) is zero, and
(ii) the earth grid (104) if at least one of (a) the first current that is received by the second riser (108) under test from the earth grid (104) is below the second current that is received by the second riser (108) under test from the body of the second equipment (102B), (b) the first current that is received by the second riser (108) under test from the earth grid (104) is below the first input current that is provided to the earth grid (104), or (c) the first current that is received by the second riser (108) under test from the earth grid (104) is zero.

### Claim 12 (depends on 11)

The method as claimed in claim 11, wherein the method comprises determining, using the system, a location of the faulty connection in the second equipment (102B) or the body of the second equipment (102B) more accurately by (i) changing the third current injection point (120) to a pole structure (122) of the second equipment (102B) above a first termination point (202) where the second riser (108) is terminated, (ii) providing the second input current with off-grid frequency at the third current injection point (120) and to the second current injection point (114), (iii) measuring, using the second current measuring device (118), the second current that is received by the second riser (108) from the pole structure (122) of the second equipment (102B), and (iv) comparing at least two of the first current, the second current and the second input current to determine a faulty connection in the first termination point (202).

### Claim 13 (depends on 11)

The method as claimed in claim 11, wherein the method comprises determining, using the system, a location of the faulty connection in the second equipment (102B) or the body of the second equipment (102B) more accurately by (i) changing (a) the third current injection point (120) to a frame (124) of the second equipment (102B) above a second termination point (302) where a pole structure (122) is bonded with the frame (124) and (b) the second current injection point (114) to the pole structure (122) below the second termination point (302), (ii) providing the second input current with off-grid frequency to (a) the frame (124) of the second equipment (102B) and (b) the pole structure (122) which acts a riser under test, (iii) measuring, using the second current measuring device (118), the second current that is received by the pole structure (122) from the frame (124) of the second equipment (102B), and (iv) comparing at least two of the first current, the second current, and the second input current to determine a faulty connection in the second termination point (302).

### Claim 14 (depends on 11)

The method as claimed in claim 11, wherein the method comprises determining, using the system, a location of the faulty connection in the second equipment (102B) or the body of the second equipment (102B) more accurately by (i) changing the second current injection point (114) to the frame (124) of the second equipment (102B) below a third termination point (402) where the frame (124) is bonded with the second equipment (102B), (ii) providing the second input current with off-grid frequency to (a) the second equipment (102B) and (b) the frame (124) of the second equipment (102B) which acts a riser under test, (iii) measuring, using the second current measuring device (118), the second current that is received by the frame (124) of the second equipment (102B) from the second equipment (102B), and (iv) comparing at least two of the first current, the second current, and the second input current to determine a faulty connection in the third termination point (402).

### Claim 15 (depends on 14)

The method as claimed in claim 14, wherein the method comprises electrically connecting the current injection device (110) to the frame (124) of the second equipment (102B) or the pole structure (122) of the second equipment (102B) at the third current injection point (120) for providing the second input current with off-grid frequency.