Proppant handling system with one or more bucket elevators and proppant delivery rate control
AssigneeQuickthree Technology, LLC
InventorsWilliam John Young, Ronald Whelan, Craig Luedtke
Life of this patent
Estimating the term…
Loading patent…
AssigneeQuickthree Technology, LLC
InventorsWilliam John Young, Ronald Whelan, Craig Luedtke
Estimating the term…
A system and method are disclosed for supplying proppant to a downstream process. The method includes delivering proppant through a discharge valve of a silo to a material conveyor that includes a belt for conveying the proppant to a system discharge. The belt may be operated at a constant rate. Weight measurements are collected from load cells that fully support the silo and any proppant contained therein. An actuator for the discharge valve is controlled based on the collected weight measurements over time to align an actual system proppant discharge rate (as determined from the weight measurements) to a desired system proppant discharge rate (as entered, for example, into a human machine interface in the system by a human system operator).
A system comprising:
(canceled)
Dependencies are inferred from the claim text.