# US 2026/0243054 A1 · Method for operating automatic mining of mining electric shovel based on auxiliary vision

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0243054 A1
- Document ID: US20260243054A1
- Status: Published application
- Kind: A1
- Application number: 18/840,499
- Filed: 2023-08-03
- Published: 2026-08-20
- Earliest claimed: 2023-04-21
- Assignees: China University of Mining and Technology
- Applicants: China University of Mining and Technology
- Inventors: Gang SHEN; Yu TANG; Yongcun GUO; Jin CHANG; Gongbo ZHOU; Zhencai ZHU; Hui XIE; Ziming KOU; Juan WU; Zhiyuan SHI; Hao LU; Yuxing PENG; Qingguo WANG
- Web page: https://patentgrep.com/patent/US20260243054A1

## CPC

- E02F 9/205: {Remotely operated machines, e.g. unmanned vehicles (E02F3/8866 takes precedence)}
- E02F 9/264: {Sensors and their calibration for indicating the position of the work tool}
- E02F 9/2029: {Controlling the position of implements in function of its load, e.g. modifying the attitude of implements in accordance to vehicle speed (control for hydraulic or pneumatic drives E02F9/2203, E02F9/2221 and E02F9/2253 take precedence)}
- E02F 9/261: {Surveying the work-site to be treated}
- E02F 9/262: {with follow-up actions to control the work tool, e.g. controller}
- E02F 9/265: {with follow-up actions (e.g. control signals sent to actuate the work tool)}
- E21C 47/02: for coal, brown coal, or the like (dredgers or soil-shifting machines in general E02F)
- Y02P 70/10: Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)
- E21C: MINING OR QUARRYING
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Disclosed is a method for operating an automatic mining of a mining electric shovel based on an auxiliary vision, including establishing a spatial coordinate system at a mining electric shovel and obtaining forward kinematics of a working device of the mining electric shovel through a D-H mean; implementing a three-dimensional reconstruction of the material pile through the binocular camera and selecting appropriate starting and ending positions of the first excavation; selecting a function yw=fw(x,t) as a first excavation trajectory of the mining electric shovel; real-timely monitoring through a force sensor whether a large coal rock block exists; recording a position of a current bucket tooth tip in a case of where the large coal rock block is monitored; adopting a means for planning downward excavation paths, after the avoidance is completed.

## Claims

### Claim 1

A method for operating an automatic mining of a mining electric shovel based on an auxiliary vision, the method comprising following steps:
Step S1, calibrating, by a Matlab toolbox, a binocular camera, installing, after calibration is completed, the binocular camera at a center of a front arm of the mining electric shovel, for extracting morphological features of an excavated material pile;
Step S2, establishing, by taking O0, O1, O2, O3 as origins, spatial coordinate systems at joints of the mining electric shovel and a center of the binocular camera, respectively, and obtaining, through a D-H mean, forward kinematics of a working device of the mining electric shovel;
Step S3, selecting, by a three-dimensional model of a material pile in the Matlab, appropriate starting and ending positions for a first excavation;
Step S4, selecting a function yw=fw(x,t) as a first excavation trajectory of the mining electric shovel, and obtaining, by using the forward kinematics of the mining electric shovel and a plane geometry relation, an expected trajectory of a dipper arm elongation d and an expected trajectory of an inclination angle θ, sending, through the expected trajectory of the dipper arm elongation d and the expected trajectory of the inclination angle θ, instructions to a variable frequency alternating current motor, and driving an execution mechanism of the mining electric shovel to carry out an excavation work;
Step S5, real-timely monitoring, through a force sensor installed on a transmission part, whether a large coal rock block exists in an excavation direction of a bucket during an excavation process of the mining electric shovel, recording, in a case where the large coal rock block is monitored in the bucket, a current position (x0, y0) of a bucket tooth tip, and terminating the excavation work;
Step S6, avoiding, by adopting a means for planning downward excavation paths, the large coal rock block in front of the excavation direction of the bucket;
Step S7, selecting starting and ending positions for a second excavation and a mining trajectory function yw2=fw2(x,t); and
Step S8, obtaining, by using the forward kinematics of the mining electric shovel and the plane geometry relation, the expected trajectory of the dipper arm elongation d and the expected trajectory of the inclination angle θ, thereby continuing to complete an entire excavation operation.

### Claim 2 (depends on 1)

The method for operating the automatic mining of the mining electric shovel based on the auxiliary vision according to claim 1, wherein in the Step S1, a chessboard calibration mean is adopted to calibrate in the calibration of the binocular camera, and multiple sets of chessboard photos with different directions and angles are taken as calibration samples.

### Claim 3 (depends on 1)

The method for operating the automatic mining of the mining electric shovel based on the auxiliary vision according to claim 1, wherein in the Step S1, a means for extracting the morphological features of the excavated material pile comprises:
obtaining images of the excavated material pile, capturing and obtaining, through the installed binocular camera, the images of material pile to be excavated;
correcting images, performing a distortion correction and a stereo correction on the obtained images of the material pile;
extracting features, detecting and extracting feature points from a left eye image of the material pile and a right eye image of the material pile;
performing a stereo matching, completing, by using the extracted feature points, stereo matchings of the left eye image and the right eye image, and obtaining a disparity map of the material pile;
filling voids, handling, by using a mean value filling mean, invalid errors caused by uneven lighting;
converting a disparity to a depth, converting, through a geometric mean, a processed disparity map into a depth map; and
performing a 3D reconstruction, importing, after the depth map is transformed into point cloud data through a coordinate transformation, the point cloud data into Matlab, and presenting in a form of a stereo map.

### Claim 4 (depends on 1)

The method for operating the automatic mining of the mining electric shovel based on the auxiliary vision according to claim 1, wherein in the Step S2, the spatial coordinate systems are established by taking O0, O1, O2, O3 as the origins at the joints of the mining electric shovel and the center of the binocular camera, respectively, X0, Y0, X1, Z1, X2, Z2, X3, and Y3 are on a same plane, Z0, Y1, Y2, and Z3 are perpendicular to the plane, coordinate axes X0 and X3 are oriented horizontally to a right, coordinate axes Y0 and Y3 are oriented vertically upward, a coordinate axis X1 is parallel to a coordinate axis X2 with a direction along a shovel arm; a coordinate axis Z1 is parallel to a coordinate axis Z2 with a direction along a shovel rod.

### Claim 5 (depends on 1)

The method for operating the automatic mining of the mining electric shovel based on the auxiliary vision according to claim 1, wherein in the Step S4, the first excavation trajectory of the mining electric shovel is selected as a logarithmic spiral ρ=ρ0eφ cot δ.

### Claim 6 (depends on 1)

The method for operating the automatic mining of the mining electric shovel based on the auxiliary vision according to claim 1, wherein in the Step S5, a means for monitoring the large coal rock block is to observe readings of the force sensor, in a case where an upper limit of a fluctuation exceeds a specified threshold, the large coal rock block is determined to exist in front of the excavation direction of the bucket of the mining electric shovel.

### Claim 7 (depends on 1)

The method for operating the automatic mining of the mining electric shovel based on the auxiliary vision according to claim 1, wherein in the Step S6, a means for planning the downward excavation paths comprises:
(1) firstly, horizontally moving the bucket tooth tip backward by a distance S,
(2) subsequently, vertically moving the bucket tooth tip downwards by a distance H,
(3) eventually, horizontally moving the bucket tooth tip forwards by the distance S to a point (x0, y0−H) directly below a first excavation stop point (x0, y0), and
(4) monitoring whether the readings of the force sensor exceed the threshold at this time instant, continually moving, in a case where the readings exceed the threshold, the bucket tooth tip horizontally backwards by the distance S, subsequently, vertically moving the bucket tooth tip downwards by the distance H, eventually, horizontally moving the bucket tooth tip forwards by the distance S to the a point (x0, y0−2H) directly below the first excavation stop point (x0, y0) and sequentially repeating until the readings of the force sensor do not exceed the threshold.

### Claim 8 (depends on 1)

The method for operating the automatic mining of the mining electric shovel based on the auxiliary vision according to claim 1, wherein in the Step S7, the starting and ending positions for the second excavation are an end point of an avoidance path and a selected end point of the first excavation, respectively.

### Claim 9 (depends on 1)

The method for operating the automatic mining of the mining electric shovel based on the auxiliary vision according to claim 1, wherein in the Step S7, a second excavation trajectory of the mining electric shovel is selected as a logarithmic spiral ρ=ρ0eφ cot δ.
