# US 2026/0241822 A1 · Intellectual scheduling method of shared storage and charging system for industrial and commercial park based on reinforcement learning

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0241822 A1
- Document ID: US20260241822A1
- Status: Published application
- Kind: A1
- Application number: 19/361,694
- Filed: 2025-10-17
- Published: 2026-08-20
- Earliest claimed: 2025-02-17
- Assignees: Fudan University
- Applicants: Fudan University
- Inventors: Yu Wang; Yaojie Sun; Yuqing Zhao; Baligen Talihati; Shiyi Fu; Bowen Zhang
- Web page: https://patentgrep.com/patent/US20260241822A1

## CPC

- B60L 53/51: Photovoltaic means
- B60L 53/11: {DC charging controlled by the charging station, e.g. mode 4}
- B60L 53/53: Batteries
- B60L 53/62: in response to charging parameters, e.g. current, voltage or electrical charge
- B60L 53/63: in response to network capacity
- B60L 53/64: Optimising energy costs, e.g. responding to electricity rates
- B60L 53/66: Data transfer between charging stations and vehicles
- B60L 53/67: Controlling two or more charging stations
- B60L 53/68: Off-site monitoring or control, e.g. remote control
- B60L 55/00: Arrangements for supplying energy stored within a vehicle to a power network, i.e. vehicle-to-grid [V2G] arrangements
- G06F 30/27: using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
- G06Q 50/06: Energy or water supply
- G06F 2101/02: Linear multivariable functions, i.e. sum of products
- G06F 2101/08: Powers or roots
- G06F 2101/14: Probability distribution functions
- G06F 2111/04: Constraint-based CAD
- G06F 2113/04: Power grid distribution networks
- G06F 2119/04: Ageing analysis or optimisation against ageing
- G06F 2119/06: Power analysis or power optimisation
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

An intellectual scheduling method of a shared storage and charging system for an industrial and commercial park based on reinforcement learning is provided. This method models various types of loads in the industrial and commercial park, establishes a model for an energy storage and photovoltaic system, analyzes its charging and discharging characteristics, and calculates a degradation cost of a battery. By designing a reasonable reward function, a reinforcement learning algorithm is guided to make optimal charging and discharging decisions at different times to maximize overall benefits of the industrial and commercial park. A reinforcement learning agent constantly selects an action based on a current state, implements a corresponding charging and discharging strategy, and optimizes the strategy through a feedback reward signal. Through multiple iterations, an optimal scheduling method is gradually found to ensure a balance between power supply and demand, reduce energy waste, and extend battery service life.

## Claims

### Claim 1

An intellectual scheduling method of a shared storage and charging system for an industrial and commercial park based on reinforcement learning, wherein specific steps are as follows:
(1) by modeling various types of loads in the industrial and commercial park that contains a shared energy storage and photovoltaic (ES-PV) system, controlling an energy balance of the shared ES-PV system to achieve intellectual scheduling and optimized management of energy, with a key focus on electricity demand of a user in a park, charging demand of an electric vehicle, and a supply situation of photovoltaic power generation;
(2) establishing a model of the shared ES-PV system, analyzing its charging and discharging characteristics, and calculating a degradation cost of a battery; and
(3) by designing a reward function, guiding a reinforcement learning algorithm to make optimal charging and discharging decisions at different times to maximize overall benefits of the industrial and commercial park, wherein in this process, a reinforcement learning agent constantly selects an action based on a current state, implements a corresponding charging and discharging strategy, and optimizes the charging and discharging decisions through a feedback reward signal; and the shared ES-PV system, through a plurality of iterations, gradually finds an optimal scheduling method to ensure a balance between power supply and demand, reduce energy waste, and extend battery service life.

### Claim 2 (depends on 1)

The method as claimed in claim 1, wherein the modeling in step (1) is to establish interaction relationships among an energy storage device, the electric vehicle, and other loads, wherein the energy storage device in the modeling is used as an emergency power source and also performs charging during peak electricity price periods to reduce dependence on a distribution network, and various types of loads in the industrial and commercial park comprise:
the energy storage device is used to store electric energy that is consumed immediately in the industrial and commercial park, and a mathematical model for the energy storage device is shown in Formula (1):
S
ev
d
,
t
+
1
=
S
ev
d
,
t
+
P
d
,
t
⁢
Δ
⁢
T
∀
t
∈
T
(
1
)
wherein: Sevd,t is a state of the energy storage device at time t, Pd,t is a charging and discharging power, and ΔT is a time step;
a capacity range of the energy storage device is constrained by:
p
dod
⁢
S
ev
max
≤
S
ev
d
,
t
≤
S
ev
max
∀
t
∈
T
(
2
)
e
d
,
t
⁢
P
ev
min
≤
P
d
,
t
≤
e
d
,
t
⁢
P
ev
max
∀
t
∈
T
(
3
)
e
d
,
t
∈
{
0
,
TagBox[",", "NumberComma", Rule[SyntaxForm, "0"]]
1
}
∀
t
∈
T
(
4
)
S
ev
d
,
19
≤
p
st
⁢
S
ev
max
∀
t
∈
T
(
5
)
S
ev
d
,
7
≤
p
ed
⁢
S
ev
max
∀
t
∈
T
(
6
)
wherein: Pdod is a lower limit of a discharging power of the device, Sevmax is a maximum storage capacity of the device, eat is a charging and discharging state of a storage device at time t, Pevmax is an upper limit of a charging power, Sevd,19 and Sevd,7 are charging and discharging states of the device at times t=19 and t=7, respectively, Pst is an upper limit coefficient of the charging power, and ped is a state of electric vehicle charging; Formula (2)-Formula (6) are charging and discharging states and capacity limits of the energy storage device in different time periods;
the electric vehicle adjusts its charging scheduling according to different charging modes, wherein the electric vehicle adopts a home charging mode in which a vehicle owner starts charging after returning home from work and stops charging when leaving for work; a start time of the electric vehicle charging follows a normal distribution, and its probability density function is:
f
t
(
x
)
=
{
1
σ
s
⁢
2
⁢
π
⁢
exp
⁢
(
-
(
x
-
μ
s
)
2
2
⁢
σ
s
2
)
μ
s
-
12
<
x
<
24
1
σ
s
⁢
2
⁢
π
⁢
exp
⁢
(
-
(
x
+
24
-
μ
s
)
2
2
⁢
σ
s
2
)
0
<
x
<
μ
s
-
12
(
7
)
wherein parameters σs and μs respectively represent a standard deviation and mean of the normal distribution controlling the start time of the electric vehicle charging, σs=3.3, μs=18; according to Formula (7), a charging start time table for the electric vehicle is obtained, and then charging is performed for the vehicle owner according to a corresponding charging mode;
a capacity of the electric vehicle in the industrial and commercial park follows a uniform distribution, as shown in Formula (8); wherein 20-60 kWh represents a common capacity range of electric vehicles on a market; a probability that the electric vehicle in the industrial and commercial park has a capacity within this range is uniformly distributed:
f
c
(
x
)
=
⁢
{
1
40
20
<
x
<
60
0
otherwise
(
8
)
a charging formula for the electric vehicle is similar to that of the energy storage device and follows a charging process of a lithium-ion battery; the charging process is expressed as Formula (9) and Formula (10):
SOC
i
,
t
+
1
=
SOC
i
,
t
+
P
i
,
t
ev
Q
i
,
t
ev
⁢
Δ
⁢
t
(
9
)
SOC
min
≤
SOC
i
,
t
≤
SOC
max
(
10
)
wherein:
P
i
,
t
ev
is a changing power of the electric vehicle, and
Q
i
,
t
ev
is a battery capacity of the electric vehicle, determined by a uniform distribution equation for determining a capacity of electric vehicles in the industrial and commercial park; SOCmin ensures that the electric vehicle is charged to a minimum required state of charge (SOC) for operation to prevent deep discharge of an electric vehicle battery during discharge, thereby extending a service life of the electric vehicle battery; and SOCmax corresponds to a maximum SOC that the electric vehicle reaches to prevent overcharging of the electric vehicle;
charging modes of the electric vehicle comprise a quick charging mode and an intellectual charging mode; the quick charging mode is suitable for emergency charging demand and achieve a full charge in a relatively short time; the intellectual charging mode is suitable for a user who is not in a hurry to charge, in which a charging power is relatively low and dynamically adjusted according to an overall load in the industrial and commercial park and electricity price fluctuations, so as to reduce charging costs and avoid excessive load on a grid; and
limits of the charging power are as follows:
P
i
,
t
ev
=
{
P
ev
,
max
quick
⁢
charging
0
≤
P
i
,
t
ev
≤
P
ev
,
max
intellectual
⁢
charging
(
11
)
wherein:
P
i
,
t
ev
is charging power of the electric vehicle, wherein in the quick charging mode, the charging power equals a maximum allowable power of a charging pile in the industrial and commercial park, which is 20 kWh, and in the intellectual charging mode, the charging power ranges from 0 to the maximum power and varies according to an overall load curve of the industrial and commercial park and real-time electricity price fluctuations, thereby achieving two objects: one is to prevent excessive electric vehicle charging in the industrial and commercial park during peak periods that puts pressure on the distribution network of the industrial and commercial park, and the other is to complete a charging demand while avoiding peak electricity price periods, thereby reducing charging costs for the vehicle owner.

### Claim 3 (depends on 1)

The method as claimed in claim 1, wherein the industrial and commercial park described in step (2) is equipped with the shared ES-PV system, and during load peak periods, the shared ES-PV system is required to give priority to satisfying internal loads of the industrial and commercial park; so as to effectively reduce dependence of loads in the industrial and commercial park on the distribution network, and therefore, the various types of loads in the industrial and commercial park are required to satisfy an electric energy balance constraint;
an electric energy balance constraint formula is as follows:
L
t
=
L
t
basic
+
P
t
fleet
(
12
)
wherein: Lt is a total power demand of the industrial and commercial park, which consists of two parts, a first part being
L
t
basic
,
that is, a basic load of the park, comprising a power demand for daily electricity consumption; a second part being
P
t
fleet
,
that is, an electric vehicle charging load in the industrial and commercial park, a size of which is determined by a penetration rate of electric vehicles in the industrial and commercial park, that is, if a charging power of one electric vehicle is
P
i
,
t
ev
,
then a total fleet power of the industrial and commercial park basically depends on how many electric vehicles are equipped in the park; and the electric vehicle charging load is not comprised in the basic load and is required to be independently optimized and scheduled.

### Claim 4 (depends on 1)

The method as claimed in claim 1, wherein the reward function in the reinforcement learning described in step (3) plays a core role in guiding an agent's decision-making, determines how the agent evaluates its behavior, and directs the agent to approximate an objective behavior; by reinforcement learning, the charging and discharging decisions of an energy storage system for the industrial and commercial park are optimized; especially during load peak periods, the energy storage system should undertake part of the load pressure;
a penalty function is adopted to reduce an occurrence of behaviors that do not conform to an agent's objective; the penalty function is defined as:
Penalty
t
waste
=
P
t
waste
(
13
)
wherein:
P
t
waste
represents energy waste generated at this time step, specifically, a surplus electric energy from photovoltaic power generation that is not fully utilized, or an energy discharged by the energy storage system that exceeds a demand of the industrial and commercial park;
an energy output of a photovoltaic power generation system is required to satisfy a power demand of the industrial and commercial park and minimize waste; an energy balance formula for the photovoltaic system is as follows:
G
t
=
P
t
p
,
c
+
P
t
p
,
e
+
P
t
pv
,
waste
(
14
)
wherein: Gt represents electric energy generated by the photovoltaic system at each time, a part of the electric energy is used by a user in the industrial and commercial park, denoted as
P
t
p
,
c
;
a part is stored by the energy storage, denoted as
P
t
p
,
e
;
if there is still remaining photovoltaic electric energy, it is denoted as
P
t
pv
,
waste
,
indicating that this part of the electric energy is wasted;
a power demand of the user in the industrial and commercial park is also required to satisfy an electric energy balance constraint, so as to ensure a reasonable distribution of loads in the industrial and commercial park among various energy inputs; an energy balance formula for the user is as follows:
L
t
=
P
t
p
,
c
+
P
t
d
⁢
i
⁢
s
+
P
t
g
,
c
-
P
t
e
,
waste
(
15
)
where: Lt is a total power demand of the industrial and commercial park, a part of which comes from photovoltaic power generation, that is,
P
t
p
,
c
;
a part comes from discharging of the energy storage system, that is,
P
t
d
⁢
i
⁢
s
;
and another part depends on a grid, that is,
P
t
g
,
c
;
if discharging of the energy storage system far exceeds a load demand of the industrial and commercial park, it is denoted as
P
t
e
,
waste
,
indicating that this part of energy is wasted;
charging electric energy of the energy storage system comes from purchased electricity from the grid and comes from power generation of the photovoltaic system; a charging power formula for the energy storage system is as follows:
P
t
c
⁢
h
=
P
t
g
,
e
+
P
t
p
,
e
(
16
)
wherein:
P
t
g
,
e
is charging power from the grid, and
P
t
p
,
e
is charging power from the photovoltaic power generation system;
P
t
waste
=
P
t
pv
,
waste
+
P
t
e
,
waste
(
17
)
the energy waste
P
t
waste
generated in the entire industrial and commercial park comes from photovoltaic power generation that fails to be fully utilized, resulting in photovoltaic electric energy waste,
P
t
pv
,
waste
,
and comes from discharging of the energy storage far exceeding a demand of the industrial and commercial park, resulting in electric energy waste of energy
storageP
t
e
,
waste
;
and this part of electric energy waste not only affects power supply efficiency of the industrial and commercial park but also increases an energy consumption burden of the system, and therefore, in reinforcement learning, a penalty is required to reduce unnecessary waste behaviors.

### Claim 5 (depends on 4)

The method as claimed in claim 4, wherein the reward function ensures that the shared ES-PV system undertakes loads in the industrial and commercial park through an electric energy balance of the industrial and commercial park;
electric energy cost of the industrial and commercial park are required to consider electric energy purchase costs from the grid and from the energy storage system, which are calculated as Formula (18):
Cost
t
s
=
∏
t
*
⁢
(
P
t
g
,
c
+
P
t
g
,
e
)
(
18
)
wherein: Costts is the electric energy costs of the entire industrial and commercial park, πts is an actual electricity price based on a local electricity price standard,
P
t
g
,
c
is electric energy purchased from the grid by the industrial and commercial park, and
P
t
g
,
e
is electric energy purchased from the grid by the energy storage system; the electric energy costs are closely related to fluctuations in loads in the industrial and commercial park and electricity prices of the grid; and therefore, adopting an optimized electric energy purchasing approach significantly reduces electricity costs of the industrial and commercial park;
a charging behavior of the energy storage system not only involves electric energy storage but also causes cost losses, especially battery wear; the cost losses caused by the charging behavior of the energy storage system are calculated as Formula (19):
Cost
t
wear
=
C
E
η
⁢
DL
C
⁢
❘
"\[LeftBracketingBar]"
P
t
bat
❘
"\[RightBracketingBar]"
(
19
)
wherein: CE is a unit energy cost of the battery, representing an initial cost or a replacement cost of the battery; D is a depth of discharge of the battery, which represents a degree of discharge; Lc is a cycle life of the battery, which represents a number of charging and discharging cycles that the battery undergoes under specific depth of discharge and conditions; a wear cost of the battery is related to an energy cost, efficiency, depth of discharge, cycle life, and charging and discharging power; by reasonably managing the charging and discharging strategy, the battery life is effectively extended and the wear cost is reduced;
a reward function of the industrial and commercial park is as shown in Formula (20):
Reaward
t
s
=
-
Cost
t
s
-
Cost
t
wear
-
Penalty
t
waste
(
20
)
wherein:
Reaward
t
s
is a reward of the industrial and commercial park at time;
Cost
t
s
is the electric energy cost of the industrial and commercial park, and an objective is to reduce power costs so as to reduce dependence of the industrial and commercial park on the grid;
Cost
t
wear
is a wear cost of the energy storage system, which both considers a long-term health of the energy storage system and optimizes a usage degree of the battery;
Penalty
t
waste
is a penalty function to reduce electric energy waste and ensure efficient operation of the system; and
through the reward function, the shared ES-PV self-adjusts the charging and discharging strategy in a reinforcement learning process, not only optimizing economic costs but also extending a service life of the energy storage system and reducing energy waste, thereby achieving effective management of loads in the industrial and commercial park and reducing dependence on the distribution network.

### Claim 6 (depends on 1)

The method as claimed in claim 1, wherein the reinforcement learning algorithm described in step (3) is used to control the charging and discharging decisions of the energy storage system for the industrial and commercial park, wherein the system forms an optimal usage strategy based on different time situations, thereby maximizing a long-term reward of the industrial and commercial park;
a core task of the reinforcement learning is to enable the agent, which in this scenario is a scheduling controller of the energy storage system for the industrial and commercial park, to learn in an environment to maximize its long-term return through a series of actions; in this application scenario, the “actions” of the agent refer to decisions on a degree of charge and discharge of the energy storage system, and an objective is to maximize the reward function of the industrial and commercial park through these decisions, so as to ensure that while satisfying a load demand of the industrial and commercial park, power costs are reduced, a service life of the energy storage system is extended, and energy waste is reduced;
in a reinforcement learning framework, a state of the environment at each step is a random variable; in this case, the state of the environment is determined by a plurality of factors comprising a current charging state of the energy storage system, the load demand, and a photovoltaic power generation amount; assuming that at a certain time, the agent is in a state st, takes an action at, and then transits to a next state st+1 and obtains a reward Reawardts, then a state transition process is expressed as:
s
t
+
1
=
f
⁡
(
s
t
,
a
t
)
(
21
)
wherein: f is a state transition function, which represents a change of an environmental state after a certain action is taken in a certain state;
an objective of the agent is to maximize its cumulative return by selecting an appropriate action sequence; this is usually achieved through a value function; given a current time t, the cumulative return Gt is a weighted sum of all rewards from performing actions starting from the current time to a termination time:
G
t
=
r
t
+
1
+
γ
⁢
r
t
+
2
+
γ
2
⁢
r
t
+
3
+
…
=
∑
k
=
0
∞
⁢
γ
k
⁢
r
t
+
k
+
1
(
22
)
wherein: γ is a discount factor, generally between 0≤γ≤1; the discount factor controls a weight of future rewards, and the smaller the value is, the smaller an influence of future rewards on a current decision is; and a reward function rt+1 in Formula (22) is a simplified representation of
Reaward
t
+
1
s
,
that is, the reward function evaluates an influence of the current decision on the agent;
a policy π defines a probability distribution of an action taken by the agent in each state, and the policy is deterministic or stochastic;
π
⁡
(
a
❘
s
)
=
P
⁡
(
a
t
=
a
❘
s
t
=
s
)
(
23
)
the stochastic policy is shown in Formula (23), which represents a probability of taking an action a in a state s; in practical applications, the stochastic policy helps explore different decision paths to find an optimal policy;
a reinforcement learning method adopts a Q-learning method based on value iteration and gradually approximates the optimal policy by constantly updating an action value function; in the Q-learning method, each pair of state St and action at has a corresponding Q value representing an expected return of taking the action in the state; an update rule of the Q-learning method is as follows:
Q
⁡
(
s
t
,
a
t
)
←
Q
⁡
(
s
t
,
a
t
)
+
α
⁡
(
r
t
+
1
+
γ
max
a
′
Q
⁡
(
s
t
+
1
,
a
′
)
-
Q
⁡
(
s
t
,
a
t
)
)
(
24
)
wherein: α is a learning rate that controls a step size of each update; maxa, Q(st+1, a′) is a Q value corresponding to an optimal action among all possible actions a′ taken in a new state st+1; and
by constantly iterating and updating the Q value, the Q-learning method gradually finds the optimal policy, that is, to take an optimal action in each state to maximize the cumulative return.
