# US 2026/0235314 A1 · Hvac and refrigeration optimization through combined modeling and artificial intelligence

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0235314 A1
- Document ID: US20260235314A1
- Status: Published application
- Kind: A1
- Application number: 19/534,207
- Filed: 2026-02-09
- Published: 2026-08-13
- Earliest claimed: 2025-02-08
- Assignees: Gyre Energy Limited
- Applicants: Gyre Energy Limited
- Inventors: Michael Pickett McKenna; Thomas Gibson; Vikrant Shirvaikar; Aryan Singh; Dougald Coulson
- Web page: https://patentgrep.com/patent/US20260235314A1

## CPC

- F24F 11/64: using pre-stored data
- F24F 11/47: Responding to energy costs
- F25B 49/02: for compression type machines, plants or systems
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- F25B: REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS

## Abstract

The present disclosure relates to computerized systems and methods for optimizing operation of cooling assets in temperature-controlled environments. A system receives operational and contextual data from sensors, controllers, and external data services, and processes the data using physics-based models and machine learning algorithms to generate predicted operational metrics. The system evaluates cost, energy, and constraint signals to determine optimized control actions for cooling assets, which may be executed automatically or with human oversight. The system dynamically adapts to changing conditions to reduce energy consumption while maintaining temperature compliance and operational continuity.

## Claims

### Claim 1

A computer-implemented method for dynamically monitoring operation of a cooling asset, the method comprising:
(a) reading operational data and/or contextual data from a plurality of heterogeneous data sources;
(b) generating a unified time-series dataset representing a current state of a temperature-controlled environment and the cooling asset;
(c) applying a computational model to generate a predicted operational metric based on the unified time-series dataset;
(d) generating a cost or constraint signal by mapping the predicted operational metric to an objective function, a threshold, or a constraint parameter;
(e) determining, using an optimization model and the cost or constraint signal as an input, a candidate control action for the cooling asset that satisfies one or more operational constraints;
(f) transmitting, via a communication interface, the determined candidate control action to the cooling asset to update at least one operational parameter;
(g) monitoring the updated operation of the cooling asset to verify that the temperature-controlled environment remains within a predefined temperature range; and
(h) iteratively repeating steps (b) through (g) to dynamically adjust operation of the cooling asset in response to changes in the operational data and/or the contextual data while maintaining the temperature-controlled environment within the predefined temperature range.

### Claim 2 (depends on 1)

The method of claim 1, wherein the plurality of heterogeneous data sources comprises:
a sensor physically deployed within a temperature-controlled environment for measuring temperature at a spatial location;
a controller associated with the cooling asset and, one or more sensors or monitoring devices configured to provide operational data of the cooling asset; or
an external data source providing contextual data comprising one or more weather data, electricity pricing data, or electrical grid-condition data.

### Claim 3 (depends on 1)

The method of claim 1, wherein generating the unified time-series dataset comprises temporally synchronizing the operational data and the contextual data by assigning timestamps and aligning the operational data and the contextual data to a common time reference.

### Claim 4 (depends on 1)

The method of claim 1, wherein the computational model comprises:
a physics-based simulation model representing thermal behavior of the temperature-controlled environment;
a machine-learning time-series forecasting model trained on historical operational data;
a regression model relating environmental conditions and asset operation to energy consumption, or a combination thereof.

### Claim 5 (depends on 1)

The method of claim 1, wherein the predicted operational metric comprises a predicted energy consumption, a predicted operating cost, a predicted temperature deviation, or a predicted asset strain.

### Claim 6 (depends on 1)

The method of claim 1, wherein the computational model generates a digital twin of the temperature-controlled environment, the digital twin simulating thermal behavior of the temperature-controlled environment based on the operational data and the contextual data.

### Claim 7 (depends on 1)

The method of claim 1, wherein the computational model generates the predicted operational metric over a future time horizon.

### Claim 8 (depends on 1)

The method of claim 1, wherein the unified time-series dataset comprises time-aligned operational data and contextual data sampled at different polling intervals.

### Claim 9 (depends on 1)

The method of claim 1, wherein the predicted operational metric comprises a predicted temperature trajectory of the temperature-controlled environment.

### Claim 10 (depends on 1)

The method of claim 1, wherein the cost or constraint signal is generated using electricity pricing data that varies as a function of time.

### Claim 11 (depends on 1)

The method of claim 1, wherein the one or more operational constraints comprise a temperature constraint requiring the temperature-controlled environment to remain within a predefined temperature range, and/or an equipment protection constraint limiting operation of the cooling asset based on a parameter selected from a duty cycle, a runtime duration, a cycling frequency, and an operating state of the cooling asset.

### Claim 12 (depends on 1)

The method of claim 1, wherein the optimization model evaluates the candidate control action by computing a score, value, or utility function based on the cost or constraint signal, and/or by optimizing an objective function subject to the one or more operational constraints.

### Claim 13 (depends on 1)

The method of claim 1, wherein the optimization model comprises a machine-learning or probabilistic decision model configured to select the control action based on an expected reward or penalty.

### Claim 14 (depends on 1)

The method of claim 1, wherein the at least one operational parameter comprises a temperature setpoint, a defrost schedule or an operating mode of the cooling asset.

### Claim 15 (depends on 1)

The method of claim 1, wherein monitoring the operational data or the contextual data comprises comparing the operational data or the contextual data to the predicted operational metric and detecting a deviation when a difference exceeds a predefined threshold.

### Claim 16 (depends on 15)

The method of claim 15, wherein detecting the deviation from the predicted operational metric causes re-simulation, or updating of the computational model or the optimization model.

### Claim 17 (depends on 1)

The method of claim 1, wherein iteratively repeating steps (b) through (g) comprises updating the control action in response to a detected change in electricity pricing data or electrical grid-condition data.

### Claim 18 (depends on 1)

The method of claim 1, wherein the control action modifies physical operation of the cooling asset by causing a change in electrical power consumption of the cooling asset.

### Claim 19

A system comprising:
a computing node comprising a computer readable storage medium having program instructions embodied therewith, the program instructions executable by a processor of the computing node to cause the processor to perform a method comprising:
(a) reading operational data and/or contextual data from a plurality of heterogeneous data sources;
(b) generating a unified time-series dataset representing a current state of a temperature-controlled environment and the cooling asset;
(c) applying a computational model to generate a predicted operational metric based on the unified time-series dataset;
(d) generating a cost or constraint signal by mapping the predicted operational metric to an objective function, a threshold, or a constraint parameter;
(e) determining, using an optimization model and the cost or constraint signal as an input, a candidate control action for the cooling asset that satisfies one or more operational constraints;
(f) transmitting, via a communication interface, the determined candidate control action to the cooling asset to update at least one operational parameter;
(g) monitoring the updated operation of the cooling asset to verify that the temperature-controlled environment remains within a predefined temperature range; and
(h) iteratively repeating steps (b) through (g) to dynamically adjust operation of the cooling asset in response to changes in the operational data and/or the contextual data while maintaining the temperature-controlled environment within the predefined temperature range.

### Claim 20

A computer program product, the computer program product comprising a computer readable storage medium having program instructions embodied therewith, the program instructions being executable by a processor to cause the processor to perform a method comprising:
(a) reading operational data and/or contextual data from a plurality of heterogeneous data sources;
(b) generating a unified time-series dataset representing a current state of a temperature-controlled environment and the cooling asset;
(c) applying a computational model to generate a predicted operational metric based on the unified time-series dataset;
(d) generating a cost or constraint signal by mapping the predicted operational metric to an objective function, a threshold, or a constraint parameter;
(e) determining, using an optimization model and the cost or constraint signal as an input, a candidate control action for the cooling asset that satisfies one or more operational constraints;
(f) transmitting, via a communication interface, the determined candidate control action to the cooling asset to update at least one operational parameter;
(g) monitoring the updated operation of the cooling asset to verify that the temperature-controlled environment remains within a predefined temperature range; and
(h) iteratively repeating steps (b) through (g) to dynamically adjust operation of the cooling asset in response to changes in the operational data and/or the contextual data while maintaining the temperature-controlled environment within the predefined temperature range.
