# US 2026/0228882 A1 · Work time calculation method and work time calculation system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0228882 A1
- Document ID: US20260228882A1
- Status: Published application
- Kind: A1
- Application number: 19/454,848
- Filed: 2026-01-21
- Published: 2026-08-06
- Earliest claimed: 2025-01-27
- Assignees: Kabushiki Kaisha Toshiba
- Applicants: Kabushiki Kaisha Toshiba
- Inventors: Yukino MASUI; Yojiro TONOUCHI; Atsushi WADA; Tomoyuki SHIBATA; Yuya MITO
- Web page: https://patentgrep.com/patent/US20260228882A1

## CPC

- G06T 7/001: {using an image reference approach}
- G06T 7/20: Analysis of motion (motion estimation for coding, decoding, compressing or decompressing digital video signals H04N19/43, H04N19/51)
- G06T 2207/20076: Probabilistic image processing
- G06T 2207/30108: Industrial image inspection
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL

## Abstract

A work time calculation method includes an acquisition process, a tracking process, and a calculation process. In the calculation process, a first calculation processing is performed when there is a second object corresponding to the first object among the second objects and when a number of the second objects corresponding to the first object is one. In the calculation process, a second calculation processing is performed when there is a second object corresponding to the first object among the second objects and when a number of the second objects corresponding to the first object is two or more. In the calculation process, when none of the second objects correspond to the first object, a third calculation processing is performed.

## Claims

### Claim 1

A work time calculation method, comprising:
an acquisition process of acquiring an image of a production line including a plurality of work regions;
a tracking process of tracking an object based on the image, the object being manufactured in the production line; and
a calculation process of calculating a work time in each of the plurality of work regions based on a tracking result,
the tracking process detecting a first time at which a first object passed through a first gate positioned at an upstream end of one of the pluralities of work regions, and a second time at which a second object passed through a second gate positioned at a downstream end of the one of the pluralities of work regions,
in the calculation process, when there is a second object corresponding to the first object among the second objects and when a number of the second objects corresponding to the first object is one, a first calculation processing being performed to calculate the work time based on a difference between the first time and the second time of the one of the second objects corresponding to the first object,
in the calculation process, when there is a second object corresponding to the first object among the second objects and when a number of the second objects corresponding to the first object is two or more, a second calculation processing being performed to estimate one of the second objects corresponding to the first object, and calculate the work time based on a difference between the first time and the second time of the one of the second objects estimated to correspond to the first object,
in the calculation process, when none of the second objects correspond to the first object, a third calculation processing being performed to estimate the second time and calculate the work time based on a difference between the first time and the estimated second time.

### Claim 2 (depends on 1)

The work time calculation method according to claim 1, wherein the second calculation processing includes estimating one of the second objects corresponding to the first object by:
determining, based on previous actual results, a probability distribution of time for the object to move from the first gate to the second gate;
and estimating the second object of which the difference between the first time and the second time has a highest probability value in the probability distribution to be the one of the second objects corresponding to the first object.

### Claim 3 (depends on 1)

The work time calculation method according to claim 1, wherein the third calculation processing includes estimating the second time by:
determining a straight-line approximation based on a first preceding passage time at which a preceding object passed through the first gate before the first object, a second preceding passage time at which the preceding object passed through the second gate, a first succeeding passage time at which a succeeding object passed through the first gate after the first object, and a second succeeding passage time at which the succeeding object passed through the second gate;
and estimating a time on the straight-line approximation corresponding to the first time to be the second time.

### Claim 4 (depends on 1)

The work time calculation method according to claim 1, wherein the tracking process includes assigning an ID to the object detected in the image, and tracking the object to which the ID is assigned.

### Claim 5 (depends on 1)

The work time calculation method according to claim 1, further comprising:
a notification process of notifying the work time.

### Claim 6

A work time calculation system, comprising:
a camera configured to acquire an image of a production line including a plurality of work regions; and
a control device configured to track an object based on the image, and calculate a work time in each of the plurality of work regions based on a tracking result, the object being manufactured in the production line,
the control device being configured to detect a first time at which a first object passed through a first gate positioned at an upstream end of one of the plurality of work regions, and a second time at which a second object passed through a second gate positioned at a downstream end of the one of the plurality of work regions,
the control device being configured to when there is a second object corresponding to the first object among the second objects and when a number of the second objects corresponding to the first object is one, perform a first calculation processing of calculating the work time based on a difference between the first time and the second time of the one of the second objects corresponding to the first object,
when there is a second object corresponding to the first object among the second objects and when a number of the second objects corresponding to the first object is two or more, perform a second calculation processing of estimating one of the second objects corresponding to the first object, and calculating the work time based on a difference between the first time and the second time of the one of the second objects estimated to correspond to the first object, and
when none of the second objects correspond to the first object, perform a third calculation processing of estimating the second time and calculating the work time based on a difference between the first time and the estimated second time.

### Claim 7 (depends on 6)

The work time calculation system according to claim 6, wherein the control device, in the second calculation processing, estimates the one of the second objects corresponding to the first object by:
determining, based on previous actual results, a probability distribution of a movement time for the object to move from the first gate to the second gate; and
estimating the second object of which the difference between the first time and the second time has a highest probability value in the probability distribution to be the one of the second objects corresponding to the first object.

### Claim 8 (depends on 6)

The work time calculation system according to claim 6, wherein the control device, in the third calculation processing, estimates the second time by:
determining a straight-line approximation based on a first preceding passage time at which a preceding object passed through the first gate before the first object, a second preceding passage time at which the preceding object passed through the second gate, a first succeeding passage time at which a succeeding object passed through the first gate after the first object, and a second succeeding passage time at which the succeeding object passed through the second gate; and
estimating a time on the straight-line approximation corresponding to the first time to be the second time.

### Claim 9 (depends on 6)

The work time calculation system according to claim 6, wherein the control device assigns an ID to the object detected in the image and tracks the object to which the ID is assigned.

### Claim 10 (depends on 6)

The work time calculation system according to claim 6, further comprising:
a notification device configured to notify the work time.
