# US 2026/0225315 A1 · Build material supply systems for apparatus for the layerwise manufacture of 3d objects and method of build material transport

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0225315 A1
- Document ID: US20260225315A1
- Status: Published application
- Kind: A1
- Application number: 19/150,469
- Filed: 2024-01-24
- Published: 2026-08-06
- Earliest claimed: 2023-01-25
- Assignees: Stratasys Powder Production Ltd.
- Applicants: Stratasys Powder Production Ltd.
- Inventors: Frederik Walsted TJELLESEN; Anders HARTMANN
- Web page: https://patentgrep.com/patent/US20260225315A1

## CPC

- B29C 64/321: Feeding
- B29C 64/153: using layers of powder being selectively joined, e.g. by selective laser sintering or melting
- B29C 64/343: Metering
- B29C 64/357: Recycling
- B29C 64/393: for controlling or regulating additive manufacturing processes
- B33Y 10/00: Processes of additive manufacturing
- B33Y 30/00: Apparatus for additive manufacturing; Details thereof or accessories therefor
- B33Y 40/00: Auxiliary operations or equipment, e.g. for material handling
- B33Y 50/02: for controlling or regulating additive manufacturing processes
- B29C 64/165: using a combination of solid and fluid materials, e.g. a powder selectively bound by a liquid binder, catalyst, inhibitor or energy absorber
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)
- B33Y: ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING

## Abstract

A build material supply system for the layerwise manufacture of 3D objects. The system includes a dosing device to supply build material to a work surface; a buffer tank to mix build material; an excess return chamber for receiving excess build material from a distribution device; a supply tank for holding fresh build material; a first pump and a second pump; and a controller. The first pump is coupled to the supply tank, the excess return chamber and an inlet of the buffer tank. The second pump is coupled to the buffer tank and the dosing device. The controller is coupled to the first valve and to the first and second pumps to control the amount of fresh build material relative to the excess amount of build material transported into the buffer tank. A method of transporting build material through the build material systems is also provided.

## Claims

### Claim 1

A build material supply system for an apparatus for the layerwise manufacture of 3D objects from build material, the build material supply system comprising:
a dosing device configured to supply a dosed amount of build material to a work surface of the apparatus, the dosed amount comprising a layer amount and an excess amount surplus to forming the layer;
a buffer tank configured to mix build material for supplying to the dosing device;
an excess return chamber for receiving excess build material from a distribution device;
a supply tank for holding fresh build material;
a first pump and a second pump for transporting build material within the build material supply system; and
a controller;
wherein an inlet of the first pump is coupled to the supply tank via a first valve and to the excess return chamber, and an outlet of the first pump is coupled to an inlet of the buffer tank;
wherein an inlet of the second pump is coupled to an outlet of the buffer tank and an outlet of the second pump is coupled to an inlet of the dosing device;
wherein the controller is coupled to the first pump, the second pump and the first valve, and, to control the amount of fresh build material compared to the excess amount of build material transported into the buffer tank, the controller is configured to:
control the first valve to at least partially open and the first pump to operate, to allow build material to flow along a supply flow path from the supply tank through the first pump and into the buffer tank;
optionally, control the first valve to at least partially close and the first pump to operate, to allow build material to flow along an excess return flow path from the excess return chamber through the first pump and into the buffer tank;
control the first valve to close, the first pump to stop operating, and the second pump to operate, to allow build material to flow along a dosing flow path from the buffer tank through the second pump and into the dosing device.

### Claim 2 (depends on 1)

The build material supply system of claim 1, wherein the excess return chamber is coupled to the first pump via a second valve and the controller is coupled to the second valve, wherein to allow build material to flow along the supply flow path, the controller is configured to control the first valve to open, the second valve to close and the first pump to operate; and, to allow build material to flow along the excess return flow path, the controller is configured to control the first valve to close, the second valve to open and the first pump to operate.

### Claim 3 (depends on 1)

The build material supply system of claim 1, wherein the dosing device comprises a dosing chamber coupled to the outlet of the second pump and configured to receive build material from the buffer tank via the second pump; the dosing device further comprising an overflow chamber, wherein the overflow chamber is coupled to the dosing chamber and configured to receive an oversupply amount of build material from the dosing chamber when the build material in the dosing chamber reaches a predefined level; wherein the overflow chamber is coupled to the inlet of the first pump via a third valve; wherein the controller is coupled to the third valve and configured to control the first valve to close and the third valve to open, and the first pump to operate, to allow oversupplied build material to flow along an oversupply return flow path from the overflow chamber through the first pump to the buffer tank.

### Claim 4 (depends on 3)

The build material supply system of claim 3, wherein the excess return chamber is coupled to the first pump via a second valve and the controller is coupled to the second valve, wherein to allow build material to flow along the supply flow path, the controller is configured to control the first valve to open, the second valve to close and the first pump to operate; and, to allow build material to flow along the excess return flow path, the controller is configured to control the first valve to close, the second valve to open and the first pump to operate; and wherein, to allow oversupplied build material to flow along the oversupply return flow path, the controller is further configured to control the second valve to close.

### Claim 5 (depends on 1)

The build material supply system of claim 1, wherein the controller is configured to prioritise the flow of build material into the buffer tank while causing the first pump to operate by applying the order of: firstly, allowing excess build material to flow along the excess return path by controlling the first valve to be at least partially closed; secondly, where present, allowing oversupply build material to flow along the oversupply return path by controlling the first and, where present, second valves to be at least partially closed and the third valve to be open; thirdly, allowing fresh build material to flow along the supply flow path by controlling the first valve to be open and controlling the third, and where present the second, valve to be closed.

### Claim 6 (depends on 1)

The build material supply system of claim 1, wherein the dosing device comprises a dosing chamber, and a bypass chamber having an inlet and a bypass outlet at either end of an intermediate section, the intermediate section comprising one or more intermediate outlets, wherein the bypass inlet is coupled to the outlet of the second pump and the bypass outlet is coupled to the inlet of the buffer tank, and wherein the dosing chamber comprises one or more dosing chamber inlets configured to receive build material from the bypass chamber and coupled to the one or more intermediate outlets to form one or more intermediate flow paths; such that when the controller controls the second pump to operate, build material is caused to flow along the dosing flow path from the buffer tank through the second pump to the bypass chamber and along the one or more intermediate flow paths to the dosing chamber so as to supply build material from the buffer tank to the dosing chamber, and an oversupply of build material is caused to flow along a direct oversupply return flow path from the bypass chamber to the buffer tank.

### Claim 7 (depends on 6)

The build material supply system of claim 6, wherein the bypass outlet is coupled to the inlet of the buffer tank via a third valve, wherein the controller is coupled to the third valve; wherein, to allow oversupply build material to flow along a direct oversupply return flow path, the controller is further configured to control the third valve to open when controlling the second pump to operate; and wherein to allow build material to flow along the dosing flow path, the controller is further configured to control the the third valve to close when controlling the first pump to operate.

### Claim 8 (depends on 7)

The build material supply system of claim 7, wherein the bypass outlet is further coupled to the inlet of the second pump via a fourth valve, wherein the controller is coupled to the fourth valve; wherein the controller is configured to, in that order:
(i) allow build material to flow along the dosing flow path, and oversupply build material to return along the direct oversupply return flow path from the bypass chamber direct to the buffer tank, by controlling the fourth valve to close and the third valve to open, the second 1 pump to operate; and optionally controlling the first, and where present the second, valve to close;
(ii) to allow build material to circulate from the bypass chamber through the pump and back to the bypass chamber so as to reuse the oversupply amount of build material to fill the dosing chamber, controlling the third valve to close, the fourth valve to open and the second pump to operate;
(iii) the fourth valve to close and the first to operate, and:
allow excess build material to flow along the excess return path, by controlling, where present, the second valve to open, and by controlling the first valve to close; and
allow fresh build material to flow along the supply flow path, by controlling the first valve to open; and optionally, where present, controlling the second valve to close.

### Claim 9 (depends on 1)

The build material supply system of claim 1, wherein the controller is configured to control the first valve to be open and the first pump to operate to allow build material to flow along the supply path simultaneously with excess build material flowing along the excess return flow path.

### Claim 10 (depends on 9)

The build material supply system of claim 9, wherein the dosing device comprises a dosing chamber coupled to the outlet of the second pump and configured to receive build material from the buffer tank via the second pump; the dosing device further comprising an overflow chamber, wherein the overflow chamber is coupled to the dosing chamber and configured to receive an oversupply amount of build material from the dosing chamber when the build material in the dosing chamber reaches a predefined level; wherein the overflow chamber is coupled to the inlet of the first pump via a third valve; wherein the controller is coupled to the third valve and configured to control the first valve to close and the third valve to open, and the first pump to operate, to allow oversupplied build material to flow along an oversupply return flow path from the overflow chamber through the first pump to the buffer tank, and wherein the controller further controls the third valve to open to allow oversupply build material to flow from the overflow chamber into the buffer tank simultaneously with the excess build material and fresh build material.

### Claim 11

(canceled)

### Claim 12

(canceled)

### Claim 13

(canceled)

### Claim 14 (depends on 1)

The build material supply system of claim 1, wherein the buffer tank comprises a fill level sensor configured to detect a fill level of build material inside the buffer tank, and wherein the controller is configured to open and shut the supply flow path based on the detected level of build material inside the buffer tank.

### Claim 15 (depends on 1)

The build material supply system of claim 1, wherein the controller is configured to cause the second pump to stop operating before controlling the first pump to operate, and to cause the first pump to stop operating before controlling the second pump to operate.

### Claim 16

A method of transporting build material through a build material supply system for an apparatus for the layerwise manufacture of 3D objects from build material, the build material supply system comprising a first and second pump, the method comprising:
(a) opening a dosing flow path from a buffer tank to a dosing device, and operating the second pump, to transport build material from the buffer tank to the dosing device;
(b) dosing a dosed amount of build material to a work surface of an apparatus, the dosed amount comprising a layer amount for forming a layer and an excess amount surplus to forming a layer;
(c) receiving excess build material within an excess return chamber;
(d) opening an excess return flow path and operating the first pump to return excess build material from the excess return chamber to the buffer tank;
(e) opening a supply flow path from a supply tank to the buffer tank, and operating the first pump to transport build material from the supply tank to the buffer tank, until either a predetermined fill duration has passed or upon detecting that the level of build material in the buffer tank has reached a predefined fill level; and
(f) mixing the excess amount with the build material in the buffer tank.

### Claim 17 (depends on 16)

The method of claim 16, wherein step (a) is repeated between steps (d) and (e).

### Claim 18 (depends on 16)

The method of claim 16, wherein step (a) comprises not operating the first material pump.

### Claim 19 (depends on 16)

The method of claim 16, wherein step (d) and/or step (e) are carried out at least partially during step (b) and/or (c).

### Claim 20 (depends on 16)

The method of claim 16, wherein step (d) and/or step (e) comprise not operating the second material pump.

### Claim 21 (depends on 16)

The method of claim 16, wherein step (f) is carried out before each step (a).

### Claim 22 (depends on 16)

The method of claim 16, wherein:
excess build material at step (d) is returned to the buffer tank before transporting fresh build material from the supply tank to the buffer tank at step (e) and a plurality repeats of steps (d) and (e) are applied such that a ratio of the amount of excess build material and fresh build material flowing into the buffer tank remains substantially constant over the plurality of repeats; and/or
the steps (d) and (e) are applied simultaneously and comprise applying different flow resistances to the respective flow paths such that a ratio of the amount of excess build material and fresh build material flowing into the buffer tank remains substantially constant over a plurality of repeats of steps (d) and (e).

### Claim 23

(canceled)

### Claim 24 (depends on 16)

The method of claim 16, wherein step (e) comprises sensing a fill level of build material within the buffer tank and applying step (e) until detecting that the level of build material in the buffer tank has reached a predefined fill level.
