Temperature adjustment system
AssigneesDaikin Industries, Ltd., Daikin Europe N.V.
InventorsTakashi TAMBA, Yasuhiko OKA, Hideho SAKAGUCHI
Life of this patent
Estimating the term…
Loading patent…
AssigneesDaikin Industries, Ltd., Daikin Europe N.V.
InventorsTakashi TAMBA, Yasuhiko OKA, Hideho SAKAGUCHI
Estimating the term…
A temperature adjustment system includes a first unit and a second unit. The first unit includes a refrigerant circuit, a first water pipe, a second heat exchanger, and a first deaerator. A highly flammable refrigerant circulates in the refrigerant circuit. The first water pipe is a part of the water pipe. The second heat exchanger exchanges heat between the refrigerant and the water flowing through the first water pipe. The first deaerator exhausts gas from the first water pipe. The second unit includes a second water pipe and a second deaerator. The second water pipe is a part of the water pipe, the water flowing out of the first water pipe flows into the second water pipe, and the refrigerant flowing out of the second water pipe flows into a living space. The second deaerator exhausts gas from the second water pipe.
A temperature adjustment system that adjusts a temperature of water flowing through a water pipe, the temperature adjustment system comprising:
Dependencies are inferred from the claim text.