# US 2026/0218585 A1 · Methods for Determining Positions of Fluid Interfaces and Detecting Cement Setting in a Subterranean Wellbore

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0218585 A1
- Document ID: US20260218585A1
- Status: Published application
- Kind: A1
- Application number: 19/576,958
- Filed: 2026-03-24
- Published: 2026-07-30
- Earliest claimed: 2020-12-14
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Demid Valeryevich Demidov; Roman Vladimirovich Korkin; Andrey Vladimirovich Fedorov; Artem Valeryevich Kabannik
- Web page: https://patentgrep.com/patent/US20260218585A1

## CPC

- E21B 33/13: Methods or devices for cementing, for plugging holes, crevices or the like
- E21B 33/14: for cementing casings into boreholes
- E21B 47/005: Monitoring or checking of cementation quality or level
- E21B 47/04: Measuring depth or liquid level
- E21B 47/047: Liquid level (measuring depth or liquid level using radioactive markers E21B47/053)
- G01V 1/50: Analysing data
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

Methods for locating fluid interfaces in a cased wellbore include generating vibrations in the casing, thereby forming oscillations in the wellbore fluids and the casing. The oscillations are detected by a vibration detector. The oscillations are recorded by a data acquisition system. Mathematical processing of the oscillations by cepstrum analysis is performed to determine the depths of interfaces between fluids in the annulus. The methods may also be employed to determine the time at which a cement slurry begins to set and harden. The methods may be performed in real time.

## Claims

### Claim 1

A method for locating fluid interfaces in a cased wellbore, comprising:
pumping a first fluid and a second fluid from a bottom of an annulus formed between a casing and a borehole toward a top of the annulus;
generating, by a vibration generator, vibrations in the casing;
detecting, by a vibration detector, oscillations in at least one of the casing, the first fluid, or the second fluid; and
determining, based on the oscillations, a position of an interface formed between the first and second fluids in the annulus.

### Claim 2 (depends on 1)

The method of claim 1, wherein the vibration generator comprises one or more of a pump, a hammer, or a piezoelectric transducer.

### Claim 3 (depends on 1)

The method of claim 1, wherein the vibration detector is an accelerometer.

### Claim 4 (depends on 3)

The method of claim 3, wherein the accelerometer is installed on the casing at a predetermined depth relative to an upper end of the casing.

### Claim 5 (depends on 4)

The method of claim 4, wherein determining the position of the interface includes determining an amount of time required for an oscillation to travel from the predetermined depth to the interface and back to the predetermined depth from the interface.

### Claim 6 (depends on 1)

The method of claim 1, wherein the first fluid and the second fluid differ in at least one of density, speed of sound, or viscosity.

### Claim 7 (depends on 1)

The method of claim 1, wherein the first fluid includes at least one of brine, water, spacer fluid, chemical wash, drilling fluid, and cement slurry; and
wherein the second fluid is different from the first fluid and includes at least one of brine, water, spacer fluid, chemical wash, drilling fluid, and cement slurry.

### Claim 8

A system comprising:
a pump adapted to pump a first fluid and a second fluid from a bottom of an annulus formed between a casing and a borehole toward the top of the annulus;
a vibration generator installed on a wellhead that is coupled to the casing, the vibration generator adapted to induce vibrations in the casing;
a vibration detector adapted to detect oscillations in at least one of the casing, the first fluid, or the second fluid; and
a data acquisition system connected to the vibration detector, the data acquisition system adapted to determine, based on the oscillations, a position of an interface formed between the first and second fluids in the annulus.

### Claim 9 (depends on 8)

The system of claim 8, wherein the vibration generator comprises one or more of a pump, a hammer, or a piezoelectric transducer.

### Claim 10 (depends on 8)

The system of claim 8, wherein the vibration detector is an accelerometer.

### Claim 11 (depends on 10)

The system of claim 10, wherein the accelerometer is installed on the casing at a predetermined depth relative to an upper end of the casing.

### Claim 12 (depends on 11)

The system of claim 11, wherein to determine the position of the interface, the data acquisition system is further adapted to determine an amount of time required for an oscillation to travel from the predetermined depth to the interface and back to the predetermined depth from the interface.

### Claim 13 (depends on 8)

The system of claim 8, wherein the first fluid and the second fluid differ in at least one of density, speed of sound, or viscosity.

### Claim 14 (depends on 8)

The system of claim 8, wherein the first fluid includes at least one of brine, water, spacer fluid, chemical wash, drilling fluid, and cement slurry; and
wherein the second fluid is different from the first fluid and includes at least one of brine, water, spacer fluid, chemical wash, drilling fluid, and cement slurry.

### Claim 15

A method of determining when cement has been set, comprising:
pumping a cement slurry and a second fluid from a bottom of an annulus formed between a casing and a borehole toward a top of the annulus;
generating, by a vibration generator, vibrations in the casing;
detecting, by a vibration detector, oscillations in at least one of the casing, the cement slurry, or the second fluid; and
determining, based on a frequency shift of the oscillations, whether the cement slurry has set.

### Claim 16 (depends on 15)

The method of claim 15, further comprising determining that the cement slurry has set when the frequency shift of the oscillations has reached a plateau.

### Claim 17 (depends on 15)

The method of claim 15, further comprising determining that the cement slurry has not set when a frequency of the oscillations continues to shift.

### Claim 18 (depends on 16)

The method of claim 16, wherein the second fluid includes one or more of brine, water, spacer fluid, chemical wash, or drilling fluid.

### Claim 19 (depends on 16)

The method of claim 16, wherein determining whether the cement slurry has set comprises:
applying a short-time Fourier transform to the oscillations; and
using cepstral processing techniques to analyze the short-time Fourier transform applied to the oscillations.

### Claim 20 (depends on 16)

The method of claim 16, wherein the vibration detector includes an accelerometer installed on a portion of the casing that is below a head of the cement slurry.