# US 2026/0216791 A1 · Binder-jetting additive manufacturing system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0216791 A1
- Document ID: US20260216791A1
- Status: Published application
- Kind: A1
- Application number: 19/145,055
- Filed: 2023-12-22
- Published: 2026-07-30
- Earliest claimed: 2023-01-11
- Assignees: Safran
- Applicants: Safran
- Inventors: Karine NGUYEN; Pierre Jean SALLOT; Gautier HUSER
- Web page: https://patentgrep.com/patent/US20260216791A1

## CPC

- B22F 12/30: Platforms or substrates
- B22F 10/14: by jetting of binder onto a bed of metal powder
- B22F 10/68: Cleaning or washing
- B28B 1/001: {Rapid manufacturing of 3D objects by additive depositing, agglomerating or laminating of material (selective deposition modelling of metallic powder B22F10/00; rapid manufacturing of 3D objects in general and in particular of plastics B29C64/00)}
- B28B 7/465: {Applying setting liquid to dry mixtures}
- B29C 64/245: Platforms or substrates (support structures intended to be sacrificed after manufacture B29C64/40)
- B29C 64/35: Cleaning
- B33Y 10/00: Processes of additive manufacturing
- B33Y 30/00: Apparatus for additive manufacturing; Details thereof or accessories therefor
- B33Y 40/20: Post-treatment, e.g. curing, coating or polishing
- B22F 10/73: of powder
- B22F 2998/10: Processes characterised by the sequence of their steps
- B29C 64/153: using layers of powder being selectively joined, e.g. by selective laser sintering or melting
- B29C 64/165: using a combination of solid and fluid materials, e.g. a powder selectively bound by a liquid binder, catalyst, inhibitor or energy absorber
- Y02P 10/25: Process efficiency
- B22F: WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER (making alloys by powder metallurgy C22C); APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B28B: SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER (foundry moulding B22C; working stone or stone-like material B28D; shaping of substances in a plastic state, in general B29C; making layered products not composed wholly of these substances B32B)
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)
- B33Y: ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A system for powder bed fusion additive manufacturing includes build chamber extending along a vertical axis and a removable container capable of being inserted into the build chamber in a manufacturing configuration and of being removed from the build chamber in a depowdering configuration. The removable container includes a side wall extending along the vertical axis and a bottom wall capable of movement along the vertical axis inside the side wall and which includes a perforated first wall comprising first orifices configured to be closed off in the manufacturing configuration and unblocked in the depowdering configuration.

## Claims

### Claim 1

A system (1) for binder jetting additive manufacturing, comprising:
a build chamber (2) extending along a vertical axis (Z); and
a removable container (10) capable of being inserted into the build chamber (2) in a manufacturing configuration and of being removed from the build chamber (2) in a depowdering configuration, the removable container (10) comprising:
a side wall (20) extending along the vertical axis (Z); and
a bottom wall (30) which is capable of movement along the vertical axis (Z) inside the side wall (20) and which comprises a perforated first wall (31) comprising first orifices (33) configured to be closed off in the manufacturing configuration and unblocked in the depowdering configuration.

### Claim 2 (depends on 1)

The system according to claim 1, wherein the bottom wall (30) comprises a build plate (32) removably fixed to the perforated first wall (31), the build plate (32) coming to rest against the perforated first wall (31) so as to close off the first orifices (33) of the perforated first wall (31) when the build plate (32) is fixed to the perforated first wall (31).

### Claim 3 (depends on 2)

The system according to claim 2, wherein the build plate (32) comprises first protrusions (34) intended to engage in the first orifices so as to close off the first orifices (33) of the perforated first wall (31).

### Claim 4 (depends on 1)

The system according to claim 1, wherein the side wall (20) comprises a perforated second wall (21) comprising second orifices (22) configured to be closed off in the manufacturing configuration and unblocked in the depowdering configuration.

### Claim 5 (depends on 4)

The system according to claim 4, wherein the side wall (20) comprises a fourth wall (23) removably fixed against the perforated second wall (21) so as to close off the second orifices (22) in the manufacturing configuration and unblock the second orifices (22) in the depowdering configuration.

### Claim 6 (depends on 5)

The system according to claim 5, wherein the fourth wall (23) comes to rest removably against the perforated second wall (21) from the outside and comprises second protrusions intended to engage in the second orifices so as to close off the second orifices (22) of the perforated second wall (21).

### Claim 7 (depends on 4)

The system according to claim 4, wherein the second orifices (22) are arranged in a lower portion of the perforated second wall (21) along the vertical axis (Z).

### Claim 8 (depends on 1)

The system according to claim 1, wherein the side wall (20) may comprise means (25) for retaining the bottom wall (30).

### Claim 9 (depends on 1)

The system according to claim 1, wherein a maximum dimension (d) of the first orifices (33) is less than approximately 50% of a minimum dimension of a part to be manufactured in the removable container (10).

### Claim 10 (depends on 1)

The system according to claim 1, comprising means (40) for hermetically sealing an upper opening of the removable container (10).

### Claim 11 (depends on 1)

The system according to claim 1, wherein the bottom wall (30) is driven along the vertical axis (Z) by a displacement member (3) removably mounted on the bottom wall (30).

### Claim 12 (depends on 1)

Method for binder jetting additive manufacturing and depowdering, for the system (1) according to claim 1, the method comprising:
inserting the removable container (10) into the build chamber (2),
manufacturing at least one part by the successive deposition of layers of powder in the removable container (10) and the selective spraying of binder while moving the bottom wall (30) downwards in translation along the vertical axis (Z),
removing the removable container (10) from the build chamber (2),
unblocking the perforated first wall (31).
