# US 2026/0210217 A1 · Method and system to create a tortuous flow path

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0210217 A1
- Document ID: US20260210217A1
- Status: Published application
- Kind: A1
- Application number: 19/027,258
- Filed: 2025-01-17
- Published: 2026-07-23
- Earliest claimed: 2025-01-17
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Dean Michael Willberg
- Web page: https://patentgrep.com/patent/US20260210217A1

## CPC

- E21B 43/12: Methods or apparatus for controlling the flow of the obtained fluid to or in wells (E21B43/25 takes precedence; valve arrangements E21B34/00)
- E21B 43/26: by forming crevices or fractures
- E21B 43/00: Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells (applicable only to water E03B)
- E21B 43/02: Subsoil filtering
- E21B 43/14: Obtaining from a multiple-zone well
- E21B 43/16: Enhanced recovery methods for obtaining hydrocarbons
- E21B 43/17: Interconnecting two or more wells by fracturing or otherwise attacking the formation ({E21B43/2405,} E21B43/247 take precedence)
- E21B 43/20: Displacing by water
- E21B 43/283: {in association with a fracturing process}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A system for creating a tortuous flow path is disclosed. The system includes a production zone, and a man-made impermeable barrier disposed along a fluid flow path to the production zone to create tortuous flow path for a fluid flowing between the injection zone and the production zone.

## Claims

### Claim 1

A system for creating a tortuous flow path, the system comprising:
a production zone including a production well;
an injection zone including an injection well, the injection zone remotely spaced from the production zone;
at least one intermediate wellbore positioned outside of the production zone and the injection zone, the intermediate wellbore being initially open to permit injection of barrier material, the intermediate wellbore being subsequently blocked to prevent flow of production fluid through the intermediate wellbore; and
a plurality of man-made impermeable barriers disposed between the injection zone and the production zone, the plurality of man-made impermeable barriers positioned in a high porosity region and a low porosity region and configured to divert fluid away from the high porosity region and through the low porosity region, thereby causing fluid to divert from a previously existing flow path and to flow along a tortuous flow path between the injection zone and the production zone, the plurality of man-made impermeable barriers comprising a first man-made impermeable barrier positioned adjacent a first well bore and a second man-made impermeable barrier positioned adjacent a second well bore, the second man-made impermeable barrier positioned downstream from the first man-made impermeable barrier relative to the tortuous flow path, the second man-made impermeable barrier being spaced apart from the first man-made impermeable barrier relative to an axis line extending from the injection well to the production well, the second man-made impermeable barrier offset from the first man-made impermeable barrier in a transverse direction such that the second man-made impermeable barrier is misaligned with and partially overlapping the first man-made impermeable barrier as viewed along the axis line.

### Claim 2

(canceled)

### Claim 3 (depends on 1)

The system of claim 1, wherein the first man-made impermeable barrier and the second man-made impermeable barrier are separated from each other, and wherein the tortuous flow path makes at least a 2 degree change in flow direction from the previously existing fluid flow path at each of the first man-made impermeable barrier and the second man-made impermeable barrier.

### Claim 4 (depends on 3)

The system of claim 3, wherein the tortuous flow path makes a greater than 5 degree direction change from the previously existing fluid flow path proximate the first man-made impermeable barrier and a greater than a 15 degree direction change from the previously existing fluid flow path proximate the second man-made impermeable barrier.

### Claim 5 (depends on 1)

The system of claim 1, wherein each of the plurality of man-made impermeable barriers comprises at least one of a cement, silica grout, a clay, a bentonite, a polymeric superabsorbent, an epoxy, a curable resin, a waste agricultural product, a wood product, a precipitating salt, a calcium carbonate, a wax, a ground rubber, an asphalt, plastic beads, a thermoplastic, or a thermoset plastic.

### Claim 6 (depends on 1)

The system of claim 1, wherein the first man-made impermeable barrier is disposed in the previously existing fluid flow path to create the tortuous flow path.

### Claim 7 (depends on 6)

The system of claim 6, wherein the first man-made impermeable barrier is disposed so that the tortuous flow path is diverted through a part of a formation that was not a part of the previously existing fluid flow path.

### Claim 8

(canceled)

### Claim 9

(canceled)

### Claim 10 (depends on 1)

The system of claim 1, further comprising a facility, wherein the fluid is collected at the production zone and transported to the facility, wherein the fluid contains a desired element, wherein the facility extracts the desired element from the fluid.

### Claim 11 (depends on 10)

The system of claim 10, wherein the facility extracts the desired element from the fluid, the facility produces a concentrated fluid having an increased concentration of the desired element and a depleted fluid having a reduced concentration of the desired element.

### Claim 12 (depends on 11)

The system of claim 11, wherein the depleted fluid is injected into the injection zone.

### Claim 13 (depends on 10)

The system of claim 10, wherein the desired element is lithium.

### Claim 14

A method of creating a tortuous flow path from an injection zone to a production zone, the method comprising:
installing a first open intermediate wellbore positioned outside of the production zone and the injection zone;
hydraulicly fracturing a formation along a previously existing fluid flow path, thereby creating a first fracture;
injecting barrier material into the first fracture to form a first man-made impermeable barrier adjacent a first well bore, the first man-made impermeable barrier positioned in a high porosity region and a low porosity region and configured to divert fluid away from the high porosity region and through the low porosity region;
filling the first intermediate wellbore with barrier material to prevent the flow of production fluid through the first intermediate wellbore during production;
installing a second intermediate wellbore positioned outside of the production zone and the injection zone;
hydraulicly fracturing the formation to create a second fracture;
injecting barrier material into the second fracture to form a second man-made impermeable barrier positioned adjacent a second well bore and downstream from the first man-made impermeable barrier, the first man-made impermeable barrier and the second man-made impermeable barrier forming a plurality of man-made impermeable barriers, the second man-made impermeable barrier configured to divert fluid away from a high porosity region and through a low porosity region, wherein the second man-made impermeable barrier being spaced apart from the first man-made impermeable barrier relative to an axis line extending from the injection well to the production well, the second man-made impermeable barrier offset from the first man-made impermeable barrier in a transverse direction such that the second man-made impermeable barrier is misaligned with and partially overlapping the first man-made impermeable barrier as viewed along the axis line;
filling the second intermediate wellbore with barrier material to prevent the flow of production fluid through the second intermediate wellbore during production; and
changing the previously existing fluid flow path to the production zone with the first man-made impermeable barrier to create the tortuous flow path.

### Claim 15 (depends on 14)

The method of claim 14, wherein the injection zone is in an injection well and the production zone is in a production well spaced apart from the injection zone, wherein the method further includes selecting or drilling a plurality of wellbores in or near the previously existing fluid flow path and hydraulicly fracturing and injecting the barrier material using the selected or drilled plurality of wellbores.

### Claim 16 (depends on 14)

The method of claim 14, wherein the injection zone and the production zone are located in the same wellbore.

### Claim 17 (depends on 15)

The method of claim 15, wherein the second man-made impermeable barrier adds an alteration to the tortuous flow path.

### Claim 18 (depends on 17)

The method of claim 17, the method further comprising:
creating a third fracture; and
injecting barrier material into the third fracture to form a third man-made impermeable barrier, wherein the third man-made impermeable barrier adds a further alteration to the tortuous flow path to the production well, wherein the tortuous flow path makes at least a 5 degree flow direction change from the previously existing fluid flow path at each of the first man-made impermeable barrier, the second man-made impermeable barrier, and the third man-made impermeable barrier.

### Claim 19 (depends on 15)

The method of claim 15, further comprising identifying the previously existing fluid flow path to the production well and estimating stresses within formations proximate the previously existing fluid flow path.

### Claim 20 (depends on 14)

The method of claim 14, further comprising:
collecting a fluid having one or more elements of interest at the production well;
processing the fluid to extract the one or more elements of interest to yield a rich fluid and a depleted fluid; and
injecting the depleted fluid at the injection well.

### Claim 21 (depends on 1)

The system of claim 1, wherein the second man-made impermeable barrier is positioned downstream from the first man-made impermeable barrier and wherein the second man-made impermeable barrier further modifies the tortuous flow path to be longer than an undesirable flow path.
